Toolkit · Real Estate

The Landmark Designation, Rehabilitation Credit, and Sign Ordinance Toolkit

26 U.S.C. § 47

Type
Toolkit
Jurisdiction
National
Date
2026-04-23
Topic
Real Estate

This toolkit supplies the documents used in preservation and sign proceedings, each with drafting notes explaining what the language is doing and where practitioners lose. It provides a designation response framework for an owner facing nomination, a certificate of appropriateness application organized around the Secretary's Standards, and a complete economic hardship submission with the financial schedule that hardship claims live or die on. It includes a Section 106 consulting party request and a mitigation proposal outline, a rehabilitation tax credit sequencing tracker built around the timing traps, and a sign ordinance audit worksheet a municipality can work through in an afternoon. It adds a commission findings template for municipalities and a record index for appeals, followed by authority tables covering designation, takings, federal review, credits, and sign doctrine.

The Landmark Designation, Rehabilitation Credit, and Sign Ordinance Toolkit

Real Estate > Historic Preservation, Landmarks, and Sign Regulation | Published 23 April 2026 - Updated 2 August 2026 | UpLaw - uplaw.us

How to use these tools

Everything here is a working draft. Bracketed text needs replacing, and local ordinances govern the details — designation procedure, hardship standards, appeal routes, minor-works thresholds, and amortization rules all vary. Read the local ordinance and the design guidelines before using any of these.

Tool 1 — Designation response

[TO THE COMMISSION] — RESPONSE TO NOMINATION OF [PROPERTY]

Owner: ______ Property: ______ Nomination filed: ______ Hearing: ______

1. Position. The owner ☐ supports ☐ does not oppose ☐ opposes designation ☐ requests modification of the proposed [boundary / classification / conditions].

2. Property history. [Construction date; original design and builder if known; documented alterations with dates; current condition.]

3. Response to the significance findings. The nomination asserts significance under Criterion [ ]. [Agree, or: The association relied upon is [ ], and the documentary support is [ ]. We note that ______.]

4. Integrity. The National Register framework at 36 C.F.R. Part 60 requires integrity of location, design, setting, materials, workmanship, feeling, and association. [Address each that is compromised, with photographic support: the storefront was replaced in [year]; the original cornice was removed in [year]; the setting was altered by [ ].]

5. Requested modification. [The district boundary should exclude [ ] because [ ]. / The property should be classified non-contributing because [ ]. / Designation should be conditioned on [ ].]

6. Planned use. [The owner's actual plans for the property, which the commission may accommodate through conditions.]

7. Request for findings. The owner requests specific written findings on each criterion and on integrity.

Attachments: current photographs of each elevation; historic photographs; alteration permit history; condition assessment.

Drafting notes. Section 1 forces a decision most owners avoid making, and the decision matters: a commission handles "modify the boundary" very differently from "preservation is bad policy." Section 4 is where cases are actually won — significance is usually defensible while integrity is frequently not, and a building that lost its storefront in 1962 and its cornice in 1978 has a real argument that photographs prove and rhetoric does not. Section 7 is procedural insurance: specific findings are what an appellate court reviews, and their absence is itself a ground.

Tool 2 — Certificate of appropriateness application

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS

Property: ______ District/landmark: ______ Applicant: ______ Date: ______

A. Proposed work. [Describe precisely, element by element. Attach drawings, elevations, and product specifications.]

B. Existing conditions. [Photographs of each affected element; condition assessment attached; measurements.]

C. Response to the Secretary's Standards (framework at 36 C.F.R. Part 68)

Standard How the proposal complies
1. Compatible use with minimal change
2. Retain historic character; avoid removing distinctive materials
3. No conjectural features
4. Retain changes that acquired significance
5. Preserve distinctive materials and techniques
6. Repair rather than replace; match in kind where replacement is required
7. Gentlest cleaning means
8. Protect archaeological resources
9. New work differentiated yet compatible
10. Additions removable without impairing essential form

D. Alternatives considered, in order of preference:

  1. [Preferred] — [description; cost; standards analysis]
  2. [Alternative] — [description; cost; standards analysis]
  3. [Alternative] — [description; cost; standards analysis]

E. Precedent. [Comparable approvals in this district, with addresses and dates.]

F. Conditions the applicant will accept. [ ]

Drafting notes. Section C is the entire application. Commissions decide against the Standards, and an application that addresses them one by one gives the staff report its structure — which means the staff report tends to adopt the applicant's framing. Standards 6 and 9 generate nearly all disputes; put the strongest evidence there. Section D matters more than applicants expect: a commission given one option can only approve or deny, while a commission given three tends to choose, and choosing is easier than denying. Section F is the negotiation opening; offering an acceptable condition preempts an unacceptable one.

Tool 3 — Economic hardship submission

APPLICATION FOR CERTIFICATE OF ECONOMIC HARDSHIP

Property: ______ Owner: ______ Date: ______ Ordinance section: ______

I. Elements (track the ordinance exactly)

  1. The property cannot yield a reasonable return in its present condition because ______
  2. No feasible alternative use exists because ______
  3. The owner has made good-faith efforts to sell or lease at a price reflecting condition and restrictions: ______
  4. Denial would deprive the property of all economically viable use because ______

II. Financial schedule

Item Amount Source document
Acquisition price and date Deed, settlement statement
Current adjusted basis Depreciation schedule
Assessed value, [3] years Assessor records
Appraised value, as-is Appraisal dated ______
Appraised value, rehabilitated Appraisal dated ______
Gross income, [3–5] years Operating statements
Operating expenses, [3–5] years Operating statements
Net operating income by year
Debt service Loan documents
Property taxes and insurance Bills
Deferred maintenance backlog Condition assessment
Rehabilitation cost, itemized Contractor estimates (attach ≥2)
Cost to comply with the denied condition vs. the proposal Estimates

III. Marketing history

Listed from To Asking price Broker Showings Offers Why rejected

IV. Assistance sought

Program Applied? Date Outcome
Federal rehabilitation credit (26 U.S.C. § 47) ☐
State rehabilitation credit ☐
Local grant or revolving fund ☐
Preservation easement sale ☐
Transferable development rights ☐
Facade improvement program ☐

V. Alternatives to demolition considered and why each is infeasible: ______

VI. Conclusion. [Tie the numbers to each element in Section I.]

Drafting notes. Section IV is the section owners skip and commissions read first. A hardship claim from an owner who never applied for a credit, never listed the property, and never obtained a contractor estimate is not a hardship claim — it is a request, and commissions deny it while courts affirm. Section III's "why rejected" column is where good faith is proved or disproved: an owner who refused a market offer because it was below what they paid has documented the opposite of hardship. Build this file over months, not the week before the hearing; the operating statements and marketing history cannot be manufactured late.

Tool 4 — Section 106 consulting party request

[TO THE AGENCY] — copy to the State Historic Preservation Officer

Re: Request for consulting party status — [PROJECT], [LOCATION]

[AGENCY OFFICIAL]:

We understand [AGENCY] is considering [permit / funding / license / approval] for [PROJECT], which constitutes an undertaking within 16 U.S.C. § 470f and 36 C.F.R. Part 800.

1. Request. [PARTY] requests consulting party status based on [ownership of an affected property / demonstrated interest in the undertaking's effects on historic properties / status as the applicant].

2. Area of potential effects. We request that the area of potential effects include [ ], to account for [visual / auditory / atmospheric] effects extending beyond the project footprint.

3. Identification. [We have commissioned an architectural and archaeological survey by [FIRM], to be delivered [DATE], and will provide it to the agency and the preservation office. / We request information about the identification effort planned.]

4. Properties of concern. [Identify listed and eligible properties, with basis.]

5. Tribal consultation. [Where applicable: we note the potential presence of properties of religious and cultural significance to [TRIBE] and request that consultation be initiated.]

6. Discovery protocol. We request that any agreement include a protocol for inadvertent discovery consistent with 25 U.S.C. § 3002 and 43 C.F.R. Part 10, and curation arrangements consistent with 36 C.F.R. Part 79.

7. Section 4(f). [Where transportation funding or approval is involved: we note the separate and substantive requirements of 49 U.S.C. § 303.]

8. Coordination. We request coordination with the review under 42 U.S.C. § 4332 to avoid duplicative process.

Drafting notes. Paragraph 3 is the applicant's lever: funding the survey rather than waiting for agency capacity is the single most effective way to compress a Section 106 timeline, and offering it in the first letter signals cooperation. Paragraph 6 belongs in the opening letter rather than in the negotiation, because a discovery protocol written before ground is broken costs nothing and a work stoppage without one costs months. Paragraph 7 is included as a flag: Section 4(f) is substantive where Section 106 is procedural, and an applicant who discovers it late has discovered it too late.

Tool 5 — Mitigation proposal outline

PROPOSED MEASURES TO RESOLVE ADVERSE EFFECT — [PROJECT]

Effect identified: [ ]

1. Avoidance considered. [Design alternatives that would avoid the effect, and why each is or is not feasible.] 2. Minimization. [Design modifications reducing the effect: massing, setback, materials, height, orientation.] 3. Mitigation proposed.

Measure Scope Responsible party Timing Cost
Documentation to recordation standards Before construction
Archaeological data recovery
Salvage and reuse of [features]
Interpretive installation
Preservation covenant on [retained resource]
Contribution to [preservation fund / survey / rehabilitation]

4. Monitoring and reporting. [Who confirms completion, to whom, and by when.] 5. Discovery. [Protocol.] 6. Amendment and dispute resolution. [Process.]

Drafting notes. Sections 1 and 2 are not throat-clearing — an agency cannot document that it considered avoidance and minimization unless somebody wrote it down, and a proposal that jumps straight to mitigation invites the consulting parties to ask why. The cost column is deliberate: mitigation negotiations go badly when the parties are trading unpriced concepts, and an applicant who arrives with costed measures controls the conversation.

Tool 6 — Rehabilitation credit sequencing tracker

Step Requirement Owner Target Done Notes
Confirm certified historic structure Listed, contributing to a listed district, or contributing to a certified state/local district ☐
Confirm income-producing use 26 U.S.C. § 47 — no owner-occupied residence ☐
Run substantial rehabilitation test Expenditures > greater of adjusted basis or statutory minimum ☐ Basis: $______
File Part 1 Structure status, 36 C.F.R. Part 67 ☐
File Part 2 — BEFORE ANY WORK Proposed work; Standards at 36 C.F.R. Part 68 ☐ ⚠️ hard gate
Part 2 approval received ☐ No demolition before this date
Reserve state credit Cap; deadline; separate office ☐ Deadline: ______
Confirm state transferability/refundability ☐
Structure investor transaction Partnership or lease pass-through ☐
Segregate qualified expenditures Exclude acquisition, enlargement, furnishings, site work ☐
Submit amendments for design changes Any deviation from approved Part 2 ☐
Placed in service ☐ Date: ______
File Part 3 Completed work certification ☐
State credit final application ☐
Calendar recapture end 5 years from placed in service ☐ Date: ______

⚠️ The two rows in bold are the whole tool. Work begun before Part 2 approval can disqualify the entire project, and the state credit reservation deadline is frequently the binding constraint on the project schedule — earlier than any construction milestone and easy to miss while waiting on the federal review.

Drafting notes. Put this tracker in front of the general contractor, not only the tax counsel. The failure mode is never that someone decided to start early; it is that demolition was scheduled months ago, the crew arrived, and nobody on site knew that a federal application was the gate.

Tool 7 — Sign ordinance audit worksheet

For a municipality. Work through the code section by section.

Code provision Text Defined by message? Analysis Replacement
"Political signs" Yes Content-based; strict scrutiny Temporary sign: [size], [duration], [number]
"Real estate signs" Yes Content-based Temporary sign category
"Construction signs" Yes Content-based Temporary sign category
"Garage sale signs" Yes Content-based Temporary sign category
"Church directional signs" Yes Content-based; also RLUIPA exposure Directional sign by size/location
Exemption list Usually yes The most common defect Rewrite dimensionally
On-premises / off-premises No Content-neutral after City of Austin v. Reagan National Advertising Keep
Size, height, spacing, setback No Content-neutral Keep
Illumination, brightness, hours No Content-neutral Keep
Digital / static No Generally content-neutral Keep
Commercial vs. noncommercial — Noncommercial may not be disfavored — Metromedia, Inc. v. City of San Diego Verify
Residential sign limits — Must leave an adequate channel — City of Ladue v. Gilleo Verify
Right-of-way posting ban No Upheld in Members of the City Council of Los Angeles v. Taxpayers for Vincent Keep
Product-specific ad limits — Central Hudson; Lorillard Tobacco Co. v. Reilly Review
Permitting criteria — Unbridled discretion = prior restraint Add standards and a decision deadline
Nonconforming / amortization — State-specific; compensation may be required Verify state rule

Required additions:

☐ Substitution clause — "Any sign permitted under this chapter may display a noncommercial message in lieu of any other message, and any noncommercial message may be substituted for any other noncommercial message." ☐ Severability clause drafted to preserve the remainder. ☐ Adoption findings on aesthetic and traffic safety interests. ☐ Defined decision period and a stated appeal route.

Drafting notes. Work the exemption list first. Most sign codes have a defensible dimensional scheme and an exemption paragraph that gives away the case — because exemptions are where drafters historically wrote "except flags, historical markers, religious symbols, and political signs during an election period," and every one of those is a subject-matter distinction. The rewrite is mechanical: name the category by what it looks like and how long it stays up, never by what it says.

Tool 8 — Commission findings template

FINDINGS AND DECISION — [APPLICATION NUMBER]

1. Property. [Address; designation status and date; contributing status.] 2. Application. [Work proposed, as amended.] 3. Notice and hearing. [Dates; notice given; appearances.] 4. Evidence considered. [Staff report dated ______; applicant submissions; public testimony; site inspection.] 5. Findings on the applicable standards.

Standard Finding Evidence relied upon
[Each standard applied]

6. Decision. ☐ Approved ☐ Approved with conditions ☐ Denied 7. Conditions, each tied to a standard: ______ 8. Basis for denial, if denied — identify each standard not satisfied and the evidence: ______ 9. Appeal. [Route, deadline, and standard of review.]

Adopted [DATE] by a vote of ______.

Drafting notes. Section 5's evidence column is what survives judicial review. A finding that recites a standard and announces a conclusion is not a finding; a finding that says "Standard 6 is not satisfied because the applicant's own condition assessment at pages 4–7 shows the sash is repairable" is one. Conditions must each trace to a standard — an untethered condition is an exaction question under Nollan v. California Coastal Commission and Dolan v. City of Tigard, and that is the analysis where commissions actually lose.

Tool 9 — Record index for appeal

Item Date In record? Source
Designation ordinance / National Register listing ☐
Recorded instrument ☐
Design guidelines in effect on the application date ☐
Application as filed, with all exhibits ☐
Any amended application ☐
Staff report and recommendation ☐
Condition assessment ☐
Contractor estimates ☐
Photographs — before, existing, context ☐
Precedent approvals cited ☐
Hardship financial package ☐
Public testimony and correspondence ☐
Minutes and any recording ☐
Written findings and decision ☐
Notice of appeal ☐

Drafting notes. Fill this in before the hearing, not after the denial. Review is almost always on the administrative record with no new evidence, so anything missing from this list is unavailable on appeal forever. The two rows that are most often blank — the condition assessment and the hardship financial package — are the two that decide the cases.

Authority tables

Designation and review

Authority What it supplies
16 U.S.C. § 470, § 470a National Register; state and tribal preservation office system
36 C.F.R. Part 60 National Register criteria and procedures
36 C.F.R. Part 61 Preservation office and certified local government structure
36 C.F.R. Part 63 Determinations of eligibility
36 C.F.R. Part 68 The Secretary's Standards

Takings and land use

Case Proposition
Penn Central Transp. Co. v. New York City The governing framework; landmark designation upheld
Pennsylvania Coal Co. v. Mahon Regulation going too far is a taking
Village of Euclid v. Ambler Realty Co. Zoning is a valid police power exercise
Berman v. Parker Aesthetic and community-character purposes are legitimate
Lucas v. South Carolina Coastal Council Categorical taking for total loss of economic use
Lingle v. Chevron U.S.A. Inc. Substantially-advances is due process, not takings
Murr v. Wisconsin Defining the relevant parcel
Tahoe-Sierra Pres. Council v. Tahoe Reg'l Planning Agency No temporal severance
First English Evangelical Lutheran Church v. County of Los Angeles Temporary takings compensable
Knick v. Township of Scott No state-litigation prerequisite
Kelo v. City of New London Public use
City of Monterey v. Del Monte Dunes Jury trial in regulatory takings under § 1983
Nollan v. California Coastal Comm'n, Dolan v. City of Tigard Exactions — nexus and rough proportionality
City of Boerne v. Flores, 42 U.S.C. § 2000cc Religious property and land use

Federal review and resources

Authority What it supplies
16 U.S.C. § 470f Section 106 obligation
36 C.F.R. Part 800 Section 106 process
16 U.S.C. § 470h-2 Federal agency stewardship
49 U.S.C. § 303 Section 4(f) — substantive transportation protection
42 U.S.C. § 4332 Environmental review
16 U.S.C. § 470aa, 16 U.S.C. § 431 Archaeological resources; antiquities
36 C.F.R. Part 79 Curation of collections
25 U.S.C. § 3001, § 3002, 43 C.F.R. Part 10 Native American remains and cultural items

Credits and signs

Authority What it supplies
26 U.S.C. § 47 Rehabilitation credit
36 C.F.R. Part 67 Certification procedures
Metromedia, Inc. v. City of San Diego On-/off-site distinction; noncommercial may not be disfavored
Members of the City Council of L.A. v. Taxpayers for Vincent Right-of-way posting ban upheld
City of Ladue v. Gilleo Residential signs as a distinct medium
City of Austin v. Reagan Nat'l Advertising On-/off-premises is not facially content-based
Central Hudson Gas & Elec. Corp. v. Public Serv. Comm'n Commercial speech framework
Lorillard Tobacco Co. v. Reilly Product-specific location restrictions struck

Sequencing the tools

Facing a nomination: Tool 1. Applying for alteration approval: Tool 2, with Tool 9 opened at the same time. Where the answer is that the property cannot support the required work: Tool 3, built over months. With a federal nexus: Tools 4 and 5. Rehabilitating with credits: Tool 6, distributed to the contractor as well as counsel. As a municipality: Tools 7 and 8.

The one habit that improves outcomes more than any document here is opening Tool 9 at the beginning. Every proceeding in this field is reviewed on the record, and the record is assembled by whoever thought to assemble it — usually before anyone knew there would be an appeal.

Related Documents