Toolkit · Real Estate
The Landmark Designation, Rehabilitation Credit, and Sign Ordinance Toolkit
26 U.S.C. § 47
- Type
- Toolkit
- Jurisdiction
- National
- Date
- 2026-04-23
- Topic
- Real Estate
This toolkit supplies the documents used in preservation and sign proceedings, each with drafting notes explaining what the language is doing and where practitioners lose. It provides a designation response framework for an owner facing nomination, a certificate of appropriateness application organized around the Secretary's Standards, and a complete economic hardship submission with the financial schedule that hardship claims live or die on. It includes a Section 106 consulting party request and a mitigation proposal outline, a rehabilitation tax credit sequencing tracker built around the timing traps, and a sign ordinance audit worksheet a municipality can work through in an afternoon. It adds a commission findings template for municipalities and a record index for appeals, followed by authority tables covering designation, takings, federal review, credits, and sign doctrine.
The Landmark Designation, Rehabilitation Credit, and Sign Ordinance Toolkit
Real Estate > Historic Preservation, Landmarks, and Sign Regulation | Published 23 April 2026 - Updated 2 August 2026 | UpLaw - uplaw.us
How to use these tools
Everything here is a working draft. Bracketed text needs replacing, and local ordinances govern the details — designation procedure, hardship standards, appeal routes, minor-works thresholds, and amortization rules all vary. Read the local ordinance and the design guidelines before using any of these.
Tool 1 — Designation response
[TO THE COMMISSION] — RESPONSE TO NOMINATION OF [PROPERTY]
Owner: ______ Property: ______ Nomination filed: ______ Hearing: ______
1. Position. The owner ☐ supports ☐ does not oppose ☐ opposes designation ☐ requests modification of the proposed [boundary / classification / conditions].
2. Property history. [Construction date; original design and builder if known; documented alterations with dates; current condition.]
3. Response to the significance findings. The nomination asserts significance under Criterion [ ]. [Agree, or: The association relied upon is [ ], and the documentary support is [ ]. We note that ______.]
4. Integrity. The National Register framework at 36 C.F.R. Part 60 requires integrity of location, design, setting, materials, workmanship, feeling, and association. [Address each that is compromised, with photographic support: the storefront was replaced in [year]; the original cornice was removed in [year]; the setting was altered by [ ].]
5. Requested modification. [The district boundary should exclude [ ] because [ ]. / The property should be classified non-contributing because [ ]. / Designation should be conditioned on [ ].]
6. Planned use. [The owner's actual plans for the property, which the commission may accommodate through conditions.]
7. Request for findings. The owner requests specific written findings on each criterion and on integrity.
Attachments: current photographs of each elevation; historic photographs; alteration permit history; condition assessment.
Drafting notes. Section 1 forces a decision most owners avoid making, and the decision matters: a commission handles "modify the boundary" very differently from "preservation is bad policy." Section 4 is where cases are actually won — significance is usually defensible while integrity is frequently not, and a building that lost its storefront in 1962 and its cornice in 1978 has a real argument that photographs prove and rhetoric does not. Section 7 is procedural insurance: specific findings are what an appellate court reviews, and their absence is itself a ground.
Tool 2 — Certificate of appropriateness application
APPLICATION FOR CERTIFICATE OF APPROPRIATENESS
Property: ______ District/landmark: ______ Applicant: ______ Date: ______
A. Proposed work. [Describe precisely, element by element. Attach drawings, elevations, and product specifications.]
B. Existing conditions. [Photographs of each affected element; condition assessment attached; measurements.]
C. Response to the Secretary's Standards (framework at 36 C.F.R. Part 68)
Standard How the proposal complies 1. Compatible use with minimal change 2. Retain historic character; avoid removing distinctive materials 3. No conjectural features 4. Retain changes that acquired significance 5. Preserve distinctive materials and techniques 6. Repair rather than replace; match in kind where replacement is required 7. Gentlest cleaning means 8. Protect archaeological resources 9. New work differentiated yet compatible 10. Additions removable without impairing essential form D. Alternatives considered, in order of preference:
- [Preferred] — [description; cost; standards analysis]
- [Alternative] — [description; cost; standards analysis]
- [Alternative] — [description; cost; standards analysis]
E. Precedent. [Comparable approvals in this district, with addresses and dates.]
F. Conditions the applicant will accept. [ ]
Drafting notes. Section C is the entire application. Commissions decide against the Standards, and an application that addresses them one by one gives the staff report its structure — which means the staff report tends to adopt the applicant's framing. Standards 6 and 9 generate nearly all disputes; put the strongest evidence there. Section D matters more than applicants expect: a commission given one option can only approve or deny, while a commission given three tends to choose, and choosing is easier than denying. Section F is the negotiation opening; offering an acceptable condition preempts an unacceptable one.
Tool 3 — Economic hardship submission
APPLICATION FOR CERTIFICATE OF ECONOMIC HARDSHIP
Property: ______ Owner: ______ Date: ______ Ordinance section: ______
I. Elements (track the ordinance exactly)
- The property cannot yield a reasonable return in its present condition because ______
- No feasible alternative use exists because ______
- The owner has made good-faith efforts to sell or lease at a price reflecting condition and restrictions: ______
- Denial would deprive the property of all economically viable use because ______
II. Financial schedule
Item Amount Source document Acquisition price and date Deed, settlement statement Current adjusted basis Depreciation schedule Assessed value, [3] years Assessor records Appraised value, as-is Appraisal dated ______ Appraised value, rehabilitated Appraisal dated ______ Gross income, [3–5] years Operating statements Operating expenses, [3–5] years Operating statements Net operating income by year Debt service Loan documents Property taxes and insurance Bills Deferred maintenance backlog Condition assessment Rehabilitation cost, itemized Contractor estimates (attach ≥2) Cost to comply with the denied condition vs. the proposal Estimates III. Marketing history
Listed from To Asking price Broker Showings Offers Why rejected IV. Assistance sought
Program Applied? Date Outcome Federal rehabilitation credit (26 U.S.C. § 47) ☐ State rehabilitation credit ☐ Local grant or revolving fund ☐ Preservation easement sale ☐ Transferable development rights ☐ Facade improvement program ☐ V. Alternatives to demolition considered and why each is infeasible: ______
VI. Conclusion. [Tie the numbers to each element in Section I.]
Drafting notes. Section IV is the section owners skip and commissions read first. A hardship claim from an owner who never applied for a credit, never listed the property, and never obtained a contractor estimate is not a hardship claim — it is a request, and commissions deny it while courts affirm. Section III's "why rejected" column is where good faith is proved or disproved: an owner who refused a market offer because it was below what they paid has documented the opposite of hardship. Build this file over months, not the week before the hearing; the operating statements and marketing history cannot be manufactured late.
Tool 4 — Section 106 consulting party request
[TO THE AGENCY] — copy to the State Historic Preservation Officer
Re: Request for consulting party status — [PROJECT], [LOCATION]
[AGENCY OFFICIAL]:
We understand [AGENCY] is considering [permit / funding / license / approval] for [PROJECT], which constitutes an undertaking within 16 U.S.C. § 470f and 36 C.F.R. Part 800.
1. Request. [PARTY] requests consulting party status based on [ownership of an affected property / demonstrated interest in the undertaking's effects on historic properties / status as the applicant].
2. Area of potential effects. We request that the area of potential effects include [ ], to account for [visual / auditory / atmospheric] effects extending beyond the project footprint.
3. Identification. [We have commissioned an architectural and archaeological survey by [FIRM], to be delivered [DATE], and will provide it to the agency and the preservation office. / We request information about the identification effort planned.]
4. Properties of concern. [Identify listed and eligible properties, with basis.]
5. Tribal consultation. [Where applicable: we note the potential presence of properties of religious and cultural significance to [TRIBE] and request that consultation be initiated.]
6. Discovery protocol. We request that any agreement include a protocol for inadvertent discovery consistent with 25 U.S.C. § 3002 and 43 C.F.R. Part 10, and curation arrangements consistent with 36 C.F.R. Part 79.
7. Section 4(f). [Where transportation funding or approval is involved: we note the separate and substantive requirements of 49 U.S.C. § 303.]
8. Coordination. We request coordination with the review under 42 U.S.C. § 4332 to avoid duplicative process.
Drafting notes. Paragraph 3 is the applicant's lever: funding the survey rather than waiting for agency capacity is the single most effective way to compress a Section 106 timeline, and offering it in the first letter signals cooperation. Paragraph 6 belongs in the opening letter rather than in the negotiation, because a discovery protocol written before ground is broken costs nothing and a work stoppage without one costs months. Paragraph 7 is included as a flag: Section 4(f) is substantive where Section 106 is procedural, and an applicant who discovers it late has discovered it too late.
Tool 5 — Mitigation proposal outline
PROPOSED MEASURES TO RESOLVE ADVERSE EFFECT — [PROJECT]
Effect identified: [ ]
1. Avoidance considered. [Design alternatives that would avoid the effect, and why each is or is not feasible.] 2. Minimization. [Design modifications reducing the effect: massing, setback, materials, height, orientation.] 3. Mitigation proposed.
Measure Scope Responsible party Timing Cost Documentation to recordation standards Before construction Archaeological data recovery Salvage and reuse of [features] Interpretive installation Preservation covenant on [retained resource] Contribution to [preservation fund / survey / rehabilitation] 4. Monitoring and reporting. [Who confirms completion, to whom, and by when.] 5. Discovery. [Protocol.] 6. Amendment and dispute resolution. [Process.]
Drafting notes. Sections 1 and 2 are not throat-clearing — an agency cannot document that it considered avoidance and minimization unless somebody wrote it down, and a proposal that jumps straight to mitigation invites the consulting parties to ask why. The cost column is deliberate: mitigation negotiations go badly when the parties are trading unpriced concepts, and an applicant who arrives with costed measures controls the conversation.
Tool 6 — Rehabilitation credit sequencing tracker
| Step | Requirement | Owner | Target | Done | Notes |
|---|---|---|---|---|---|
| Confirm certified historic structure | Listed, contributing to a listed district, or contributing to a certified state/local district | ☐ | |||
| Confirm income-producing use | 26 U.S.C. § 47 — no owner-occupied residence | ☐ | |||
| Run substantial rehabilitation test | Expenditures > greater of adjusted basis or statutory minimum | ☐ | Basis: $______ | ||
| File Part 1 | Structure status, 36 C.F.R. Part 67 | ☐ | |||
| File Part 2 — BEFORE ANY WORK | Proposed work; Standards at 36 C.F.R. Part 68 | ☐ | ⚠️ hard gate | ||
| Part 2 approval received | ☐ | No demolition before this date | |||
| Reserve state credit | Cap; deadline; separate office | ☐ | Deadline: ______ | ||
| Confirm state transferability/refundability | ☐ | ||||
| Structure investor transaction | Partnership or lease pass-through | ☐ | |||
| Segregate qualified expenditures | Exclude acquisition, enlargement, furnishings, site work | ☐ | |||
| Submit amendments for design changes | Any deviation from approved Part 2 | ☐ | |||
| Placed in service | ☐ | Date: ______ | |||
| File Part 3 | Completed work certification | ☐ | |||
| State credit final application | ☐ | ||||
| Calendar recapture end | 5 years from placed in service | ☐ | Date: ______ |
⚠️ The two rows in bold are the whole tool. Work begun before Part 2 approval can disqualify the entire project, and the state credit reservation deadline is frequently the binding constraint on the project schedule — earlier than any construction milestone and easy to miss while waiting on the federal review.
Drafting notes. Put this tracker in front of the general contractor, not only the tax counsel. The failure mode is never that someone decided to start early; it is that demolition was scheduled months ago, the crew arrived, and nobody on site knew that a federal application was the gate.
Tool 7 — Sign ordinance audit worksheet
For a municipality. Work through the code section by section.
| Code provision | Text | Defined by message? | Analysis | Replacement |
|---|---|---|---|---|
| "Political signs" | Yes | Content-based; strict scrutiny | Temporary sign: [size], [duration], [number] | |
| "Real estate signs" | Yes | Content-based | Temporary sign category | |
| "Construction signs" | Yes | Content-based | Temporary sign category | |
| "Garage sale signs" | Yes | Content-based | Temporary sign category | |
| "Church directional signs" | Yes | Content-based; also RLUIPA exposure | Directional sign by size/location | |
| Exemption list | Usually yes | The most common defect | Rewrite dimensionally | |
| On-premises / off-premises | No | Content-neutral after City of Austin v. Reagan National Advertising | Keep | |
| Size, height, spacing, setback | No | Content-neutral | Keep | |
| Illumination, brightness, hours | No | Content-neutral | Keep | |
| Digital / static | No | Generally content-neutral | Keep | |
| Commercial vs. noncommercial | — | Noncommercial may not be disfavored — Metromedia, Inc. v. City of San Diego | Verify | |
| Residential sign limits | — | Must leave an adequate channel — City of Ladue v. Gilleo | Verify | |
| Right-of-way posting ban | No | Upheld in Members of the City Council of Los Angeles v. Taxpayers for Vincent | Keep | |
| Product-specific ad limits | — | Central Hudson; Lorillard Tobacco Co. v. Reilly | Review | |
| Permitting criteria | — | Unbridled discretion = prior restraint | Add standards and a decision deadline | |
| Nonconforming / amortization | — | State-specific; compensation may be required | Verify state rule |
Required additions:
☐ Substitution clause — "Any sign permitted under this chapter may display a noncommercial message in lieu of any other message, and any noncommercial message may be substituted for any other noncommercial message." ☐ Severability clause drafted to preserve the remainder. ☐ Adoption findings on aesthetic and traffic safety interests. ☐ Defined decision period and a stated appeal route.
Drafting notes. Work the exemption list first. Most sign codes have a defensible dimensional scheme and an exemption paragraph that gives away the case — because exemptions are where drafters historically wrote "except flags, historical markers, religious symbols, and political signs during an election period," and every one of those is a subject-matter distinction. The rewrite is mechanical: name the category by what it looks like and how long it stays up, never by what it says.
Tool 8 — Commission findings template
FINDINGS AND DECISION — [APPLICATION NUMBER]
1. Property. [Address; designation status and date; contributing status.] 2. Application. [Work proposed, as amended.] 3. Notice and hearing. [Dates; notice given; appearances.] 4. Evidence considered. [Staff report dated ______; applicant submissions; public testimony; site inspection.] 5. Findings on the applicable standards.
Standard Finding Evidence relied upon [Each standard applied] 6. Decision. ☐ Approved ☐ Approved with conditions ☐ Denied 7. Conditions, each tied to a standard: ______ 8. Basis for denial, if denied — identify each standard not satisfied and the evidence: ______ 9. Appeal. [Route, deadline, and standard of review.]
Adopted [DATE] by a vote of ______.
Drafting notes. Section 5's evidence column is what survives judicial review. A finding that recites a standard and announces a conclusion is not a finding; a finding that says "Standard 6 is not satisfied because the applicant's own condition assessment at pages 4–7 shows the sash is repairable" is one. Conditions must each trace to a standard — an untethered condition is an exaction question under Nollan v. California Coastal Commission and Dolan v. City of Tigard, and that is the analysis where commissions actually lose.
Tool 9 — Record index for appeal
| Item | Date | In record? | Source |
|---|---|---|---|
| Designation ordinance / National Register listing | ☐ | ||
| Recorded instrument | ☐ | ||
| Design guidelines in effect on the application date | ☐ | ||
| Application as filed, with all exhibits | ☐ | ||
| Any amended application | ☐ | ||
| Staff report and recommendation | ☐ | ||
| Condition assessment | ☐ | ||
| Contractor estimates | ☐ | ||
| Photographs — before, existing, context | ☐ | ||
| Precedent approvals cited | ☐ | ||
| Hardship financial package | ☐ | ||
| Public testimony and correspondence | ☐ | ||
| Minutes and any recording | ☐ | ||
| Written findings and decision | ☐ | ||
| Notice of appeal | ☐ |
Drafting notes. Fill this in before the hearing, not after the denial. Review is almost always on the administrative record with no new evidence, so anything missing from this list is unavailable on appeal forever. The two rows that are most often blank — the condition assessment and the hardship financial package — are the two that decide the cases.
Authority tables
Designation and review
| Authority | What it supplies |
|---|---|
| 16 U.S.C. § 470, § 470a | National Register; state and tribal preservation office system |
| 36 C.F.R. Part 60 | National Register criteria and procedures |
| 36 C.F.R. Part 61 | Preservation office and certified local government structure |
| 36 C.F.R. Part 63 | Determinations of eligibility |
| 36 C.F.R. Part 68 | The Secretary's Standards |
Takings and land use
| Case | Proposition |
|---|---|
| Penn Central Transp. Co. v. New York City | The governing framework; landmark designation upheld |
| Pennsylvania Coal Co. v. Mahon | Regulation going too far is a taking |
| Village of Euclid v. Ambler Realty Co. | Zoning is a valid police power exercise |
| Berman v. Parker | Aesthetic and community-character purposes are legitimate |
| Lucas v. South Carolina Coastal Council | Categorical taking for total loss of economic use |
| Lingle v. Chevron U.S.A. Inc. | Substantially-advances is due process, not takings |
| Murr v. Wisconsin | Defining the relevant parcel |
| Tahoe-Sierra Pres. Council v. Tahoe Reg'l Planning Agency | No temporal severance |
| First English Evangelical Lutheran Church v. County of Los Angeles | Temporary takings compensable |
| Knick v. Township of Scott | No state-litigation prerequisite |
| Kelo v. City of New London | Public use |
| City of Monterey v. Del Monte Dunes | Jury trial in regulatory takings under § 1983 |
| Nollan v. California Coastal Comm'n, Dolan v. City of Tigard | Exactions — nexus and rough proportionality |
| City of Boerne v. Flores, 42 U.S.C. § 2000cc | Religious property and land use |
Federal review and resources
| Authority | What it supplies |
|---|---|
| 16 U.S.C. § 470f | Section 106 obligation |
| 36 C.F.R. Part 800 | Section 106 process |
| 16 U.S.C. § 470h-2 | Federal agency stewardship |
| 49 U.S.C. § 303 | Section 4(f) — substantive transportation protection |
| 42 U.S.C. § 4332 | Environmental review |
| 16 U.S.C. § 470aa, 16 U.S.C. § 431 | Archaeological resources; antiquities |
| 36 C.F.R. Part 79 | Curation of collections |
| 25 U.S.C. § 3001, § 3002, 43 C.F.R. Part 10 | Native American remains and cultural items |
Credits and signs
| Authority | What it supplies |
|---|---|
| 26 U.S.C. § 47 | Rehabilitation credit |
| 36 C.F.R. Part 67 | Certification procedures |
| Metromedia, Inc. v. City of San Diego | On-/off-site distinction; noncommercial may not be disfavored |
| Members of the City Council of L.A. v. Taxpayers for Vincent | Right-of-way posting ban upheld |
| City of Ladue v. Gilleo | Residential signs as a distinct medium |
| City of Austin v. Reagan Nat'l Advertising | On-/off-premises is not facially content-based |
| Central Hudson Gas & Elec. Corp. v. Public Serv. Comm'n | Commercial speech framework |
| Lorillard Tobacco Co. v. Reilly | Product-specific location restrictions struck |
Sequencing the tools
Facing a nomination: Tool 1. Applying for alteration approval: Tool 2, with Tool 9 opened at the same time. Where the answer is that the property cannot support the required work: Tool 3, built over months. With a federal nexus: Tools 4 and 5. Rehabilitating with credits: Tool 6, distributed to the contractor as well as counsel. As a municipality: Tools 7 and 8.
The one habit that improves outcomes more than any document here is opening Tool 9 at the beginning. Every proceeding in this field is reviewed on the record, and the record is assembled by whoever thought to assemble it — usually before anyone knew there would be an appeal.
Related Documents
- The Building You Cannot Change: How Historic Preservation and Sign Law Actually Work
- Historic Preservation and Sign Regulation: A Comprehensive Guide to Designation, Section 106, Certificates, Credits, and Speech Limits
- Navigating a Landmark Designation, a Section 106 Review, or a Sign Permit: A Practical Checklist
- What You May Build and Who Decides: How Zoning Actually Constrains Property
- Zoning and Land Use: A Comprehensive Guide to Districts, Variances, Nonconforming Uses, and Appeals
- Seeking a Variance, Permit, or Rezoning: A Practical Checklist
- The Zoning, Variance, and Land Use Appeal Toolkit
- Land Use and Zoning Law: A Comprehensive Guide
- Securing Land Use Entitlements for a Development Project: A Practical Checklist
- The Land Use and Development Toolkit
- They Want Your Land: How Eminent Domain and Takings Claims Actually Work
- Eminent Domain and Takings: A Comprehensive Guide to Public Use, Just Compensation, and Inverse Condemnation
- The Eminent Domain and Just Compensation Toolkit
- Where You May Speak and Who May Stop You: How the First Amendment Actually Applies
- Who Owns the Church Building: How Religious Organization Law Actually Works
- Religious Organizations: A Comprehensive Guide to Governance, Property, Employment, Land Use, and Tax Status
- The Religious Organization Governance and Compliance Toolkit
- Boundaries, Easements, and Neighbor Disputes: A Comprehensive Guide to Surveys, Adverse Possession, Access, Trees, and Nuisance
- Securing a Water Right, a Wetlands Permit, or a Conservation Easement: A Practical Checklist
- Water, Wetlands, and Conservation: A Comprehensive Guide to Rights, Permits, and Easements
- Property Tax Assessment and Appeals: A Comprehensive Guide to Valuation, Exemptions, and Hearings
- Appealing a Property Tax Assessment and Claiming Exemptions: A Practical Checklist
- The Property Tax Appeal Toolkit
- Construction Law: A Comprehensive Guide to Contracts, Delay Claims, and Defect Litigation
- Hiring a Contractor and Resolving a Construction Dispute: A Practical Checklist
- The Construction Law Toolkit
- The Lease That Outlives the Business: What a Small Business Signs and Cannot Undo
- Commercial Leasing for Small Business: A Comprehensive Guide to Terms, Build-Out, Guaranties, and Exit
- The Ramp That Was Never Built: How Disability Access Law Actually Works
- Disability Access and Public Accommodations: A Comprehensive Guide to Barriers, Accommodations, and Enforcement
- Federal Indian Law: A Comprehensive Guide to Tribal Sovereignty and Jurisdiction
- Everything We Say Is True: How Advertising Law Actually Polices a Claim
- Advertising and Marketing Law: A Comprehensive Guide to Substantiation, Endorsements, and Disclosures
- The Chair You Rent: How Salon, Barber, and Body Art Law Actually Works
- Personal Care Services and Body Art: A Comprehensive Guide to Licensing, Booth Rental, Sanitation, Products, and Liability
- Prove You Are Old Enough: How Age Verification and Minors-Online Law Actually Work
- The Permit Wall by the Kitchen Door: How Restaurant Law Actually Works