Checklist · Real Estate

Navigating a Landmark Designation, a Section 106 Review, or a Sign Permit: A Practical Checklist

16 U.S.C. § 470

Type
Checklist
Jurisdiction
National
Date
2023-12-12
Topic
Real Estate

This checklist covers the three proceedings a property owner or municipality most often faces in this field, each sequenced in the order the work has to happen. It begins with responding to a landmark designation, including the threshold questions about owner consent and interim demolition protection that determine the entire strategy. It sequences a certificate of appropriateness application from the pre-application staff meeting through the hearing and the appeal, with the evidentiary package that separates approvals from denials, and supplies the economic hardship submission requirements in full. It works through a Section 106 consultation from identifying the federal nexus through the memorandum of agreement, and covers the rehabilitation tax credit certification sequence with its timing traps. It closes with sign permitting for an applicant and a sign ordinance audit for a municipality, plus the record-building practices that determine appeals.

Navigating a Landmark Designation, a Section 106 Review, or a Sign Permit: A Practical Checklist

Real Estate > Historic Preservation, Landmarks, and Sign Regulation | Published 12 December 2023 - Updated 22 February 2026 | UpLaw - uplaw.us

Threshold: which proceeding are you in?

☐ A designation proceeding — someone has nominated the property. Go to Part 1. ☐ An alteration or demolition proposal on a designated property — Part 2, and Part 3 if hardship is the argument. ☐ A project with a federal permit, funding, license, or approval — Part 4. ☐ A rehabilitation seeking tax credits — Part 5. ☐ A sign — Part 6 as an applicant, Part 7 as a municipality.

⚠️ Answer one question before anything else: is the property listed on the National Register, locally designated, or both? They are different, and only local designation restricts what a private owner may do with private money. Owners and even counsel routinely conflate them.

Part 1 — Responding to a designation

☐ Confirm what is being proposed — individual landmark, contributing status in a new district, or National Register nomination — and get the nomination document.

☐ Determine whether owner consent is required. This single fact drives the entire strategy and varies by jurisdiction. For National Register nominations, an owner objection generally prevents listing of an individual property, and a majority of owners can prevent district listing — though eligibility, and its Section 106 consequence, survives.

☐ Determine whether the nomination stays a demolition or alteration permit. In many jurisdictions filing a nomination triggers interim protection, and that timing is frequently the whole dispute.

☐ Read the criteria against your property honestly. Significance under one of the four criteria plus integrity of location, design, setting, materials, workmanship, feeling, and association, under 36 C.F.R. Part 60 and the framework at 16 U.S.C. § 470a.

☐ Identify integrity arguments if any: prior alterations, replaced materials, changed setting, loss of association.

☐ Decide the objective. Defeating designation, narrowing the district boundary, obtaining non-contributing classification, or securing conditions is a different case from opposing preservation generally — and only the first four are winnable.

☐ Appear and submit in writing. Photographs, condition documentation, prior alteration history, and planned use.

☐ Request specific findings on each criterion.

☐ Identify the appeal route and standard of review before the hearing.

☐ Preserve every argument in the record, including constitutional ones, even if they will not prevail there.

Part 2 — Certificate of appropriateness

Before you apply

☐ Meet with commission staff. This is the highest-value hour in the entire process; staff shape recommendations and know what has been approved nearby.

☐ Ask about a minor-works or staff-level approval path. Many ordinances allow staff to approve in-kind repairs and small changes without a hearing, and many owners never learn it exists.

☐ Obtain the design guidelines and read them.

☐ Pull precedent approvals in the same district for similar work.

☐ Document existing conditions thoroughly — photographs of every affected elevation and feature, close-ups of deterioration, and measurements.

☐ Get a condition assessment from a restoration specialist where repair-versus-replace is at issue. This is what wins window cases.

The application

☐ Describe the work precisely, with drawings, elevations, and product specifications.

☐ Address the Secretary's Standards explicitly, one by one — the framework reflected at 36 C.F.R. Part 68. An application that does not mention them makes the commission do the work.

☐ Present alternatives, ranked. A commission given one option approves or denies; a commission given three chooses.

☐ Include samples and cut sheets for materials.

☐ For additions, provide massing studies and context photographs showing the streetscape.

☐ For demolition, expect a stricter standard, a waiting period, and a requirement to show alternatives were explored.

☐ File early enough for the agenda deadline, and confirm completeness.

The hearing

☐ Attend, with your professionals — architect, contractor, or specialist. ☐ Present in the language of the standards, not of cost or preference. ☐ Offer conditions you can live with before the commission invents ones you cannot. ☐ Ask for specific findings on any denial. ☐ Get the record — minutes, staff report, exhibits, and any recording.

After

☐ Calendar the appeal deadline immediately. These are short and jurisdictional. ☐ Assess whether to reapply with modifications instead of appealing. It is usually faster and often better. ☐ On appeal, understand the standard — most reviews are on the administrative record for arbitrariness or lack of substantial evidence, and new evidence is not permitted.

Part 3 — Economic hardship

The escape valve that keeps preservation ordinances out of takings territory — and the claim most often lost for want of evidence.

☐ Read the ordinance's hardship standard and track its elements exactly. They vary.

☐ Assemble the financial package before the hearing:

☐ Income and expense statements for the property, [3–5] years ☐ Acquisition price, date, terms, and current adjusted basis ☐ Assessed value history and any appraisals ☐ Itemized rehabilitation cost estimates from qualified contractors ☐ Estimated market value in current condition and after rehabilitation ☐ Complete marketing history — listing dates, asking prices, brokers engaged, offers received, and the reason each was rejected ☐ Documentation of grants, credits, loans, and assistance sought and the outcome ☐ Any structural, environmental, or code condition affecting feasibility ☐ A written analysis tying the numbers to the ordinance's elements

☐ Show good faith. A hardship claim from an owner who never listed the property, never sought a credit, and never obtained a contractor estimate will fail and should.

☐ Anticipate a delay-rather-than-approval outcome. Some ordinances require a period during which the municipality or a preservation organization may find a purchaser at a price the owner will accept. Understand this before planning a sale.

☐ Consider the alternatives that resolve hardship without demolition: a transferable development right, an easement sale, a credit-financed rehabilitation, or a conveyance to a preservation buyer.

A takings argument raised for the first time on appeal, with no financial record, loses. Penn Central Transportation Co. v. New York City forecloses the facial challenge, and Murr v. Wisconsin makes the parcel-definition argument difficult. The as-applied case is the hardship case, and it is built at the commission. Where the denial is conditioned on an easement, an access right, or a payment, analyze it as an exaction under Nollan v. California Coastal Commission and Dolan v. City of Tigard — that is where owners actually win.

Part 4 — Section 106

At acquisition or project inception

☐ Ask whether any federal nexus exists: permit, license, funding, loan guarantee, insurance, grant, or approval. This determines the schedule.

☐ Check for a transportation nexus specifically. 49 U.S.C. § 303 — Section 4(f) — is substantive rather than procedural and is far more restrictive than Section 106.

☐ Check whether environmental review under 42 U.S.C. § 4332 applies and whether the processes will be coordinated.

☐ Screen the site for historic and archaeological resources before closing, if possible.

The consultation

☐ Confirm the undertaking determination with the agency, under 16 U.S.C. § 470f and the process at 36 C.F.R. Part 800.

☐ Request consulting party status in writing.

☐ Identify the consulting parties: the State Historic Preservation Officer, any Tribal Historic Preservation Officer, local government, and interested public.

☐ Engage the preservation office early — before the agency's formal submission, if possible.

☐ Define the area of potential effects — including visual, auditory, and atmospheric effects, not only the footprint.

☐ Fund and complete the identification survey. Waiting for agency capacity is the single largest source of delay.

☐ Determine eligibility; use 36 C.F.R. Part 63 procedures where a determination is needed.

☐ Assess effects against the criteria of adverse effect.

☐ Where adverse, propose mitigation rather than contesting eligibility: design modification, recordation, data recovery, interpretation, salvage, covenants, or funding.

☐ Negotiate the memorandum of agreement, or a programmatic agreement for phased or complex undertakings.

☐ Confirm curation arrangements for any recovered archaeological material under 36 C.F.R. Part 79, and note the protections at 16 U.S.C. § 470aa and 16 U.S.C. § 431.

☐ Establish a discovery protocol. If human remains or cultural items are encountered on federal or tribal land, work stops and the procedures of 25 U.S.C. § 3001, 25 U.S.C. § 3002, and 43 C.F.R. Part 10 apply. Have the protocol written before ground is broken.

☐ Track and document compliance with every mitigation commitment; they survive the approval.

⚠️ Remember what Section 106 is. It requires consideration, not preservation. An agency may approve a project that destroys a historic property if it completed the process. Plan accordingly — as an applicant, and as an objector.

Part 5 — Rehabilitation tax credits

☐ Confirm the building is a certified historic structure — individually listed, contributing to a listed district, or contributing to a certified state or local district.

☐ Confirm income-producing use. The federal credit under 26 U.S.C. § 47 is unavailable for an owner-occupied residence.

☐ Run the substantial rehabilitation test — expenditures during the measuring period exceeding the greater of adjusted basis or the statutory minimum.

☐ File Part 1 to establish the structure's status, under 36 C.F.R. Part 67.

☐ File Part 2 describing the proposed work — and obtain approval — BEFORE any work begins. ⚠️ This is the most expensive mistake in credit practice. Work inconsistent with the Standards can disqualify the entire project, and a demolished feature cannot be restored to the application.

☐ Design to the Standards at 36 C.F.R. Part 68, and submit amendments for any change during construction.

☐ Segregate qualified expenditures from acquisition, enlargement, furnishings, and site work in the accounting from day one.

☐ File Part 3 on completion, and calendar it.

☐ Coordinate the state credit application — separate submission, separate deadline, often a separate office, and frequently a cap requiring early reservation.

☐ Confirm the state credit's transferability or refundability before assuming the project can use it.

☐ Structure the investor transaction before budgeting credit proceeds.

☐ Calendar the five-year recapture period and flag any planned disposition or change of use.

Part 6 — Applying for a sign permit

☐ Determine every approval required: sign permit under the zoning code; certificate of appropriateness if the property is locally designated; building permit for structural mounting; electrical permit for illumination; and an encroachment permit for anything projecting over the right of way.

☐ Sequence them. ⚠️ Resolve the certificate of appropriateness before ordering the sign. A fabricated sign that the commission rejects is a total loss.

☐ Read the ordinance's dimensional rules: maximum area, height, projection, number per frontage, setback, and illumination limits.

☐ Check the on-premises/off-premises classification, which after City of Austin v. Reagan National Advertising of Austin, LLC is a content-neutral distinction that municipalities may lawfully draw.

☐ Identify any message-based restriction applied to your sign. A rule that treats your sign differently because of what it says is presumptively invalid, and the municipality's own code is the evidence.

☐ Check nonconforming status if you are altering an existing sign, and confirm whether alteration terminates it.

☐ For a designated property, prepare the design case: materials, mounting method that avoids damage to historic fabric and is reversible, dimensions proportionate to the storefront, illumination type, and letterforms.

☐ Document the mounting. Commissions care whether anchors penetrate historic masonry and whether the installation can be removed without damage. Address this in the application and you will usually get approval.

☐ If the commission's discussion turns to what the sign says, note it on the record. That discussion supports a First Amendment claim that preservation authority does not defeat.

☐ Calendar the appeal deadline.

Part 7 — Auditing a sign ordinance (municipality)

☐ Print the code and highlight every category defined by message: political, real estate, construction, garage sale, church, event, campaign, holiday, memorial, "for sale," "open house."

☐ Do the same for every exemption. Exemptions are where the defect usually lives.

☐ Each highlighted item is presumptively content-based and subject to strict scrutiny under Reed v. Town of Gilbert, regardless of the municipality's benign motive.

☐ Redraft in content-neutral terms: size, height, number, setback, spacing, materials, structural type, illumination and brightness, hours of illumination, duration for temporary signs, and location.

☐ Preserve the on-premises/off-premises distinction, which survives after Austin and remains the backbone of most sign regulation, consistent with Metromedia, Inc. v. City of San Diego.

☐ Confirm noncommercial speech is never treated worse than commercial speech. Metromedia forbids it.

☐ Add a substitution clause: any noncommercial message may be substituted for any message on any permitted sign.

☐ Add a severability clause drafted to preserve the remainder.

☐ Review the permitting procedure for unbridled discretion, an indefinite decision period, or aesthetic criteria without standards — each is a prior restraint problem independent of content neutrality.

☐ Confirm the residential sign rules leave an adequate channel; City of Ladue v. Gilleo struck a near-total residential ban.

☐ Check any product-specific advertising restriction against Central Hudson Gas & Electric Corp. v. Public Service Commission and Lorillard Tobacco Co. v. Reilly.

☐ Confirm the ban on signs in the public right of way is content-neutral, as upheld in Members of the City Council of Los Angeles v. Taxpayers for Vincent.

☐ Verify the state rule on amortization of nonconforming signs, and the compensation requirements for outdoor advertising structures.

☐ Adopt findings supporting the aesthetic and traffic safety interests at the time of adoption.

☐ Train the code enforcement staff and the preservation commission on the content boundary.

Part 8 — Municipal preservation program hygiene

☐ Adopt illustrated design guidelines. Vague standards produce arbitrary decisions and reversals. ☐ Provide a staff-level approval path for in-kind repairs and minor work, with published criteria. ☐ Make findings on every decision, tied to the standards. ☐ Provide a real hardship procedure with a defined evidentiary standard. It is the mechanism that keeps the ordinance out of takings territory. ☐ Enforce demolition-by-neglect provisions, or expect the strategy they exist to defeat. ☐ Require independent structural verification before an emergency demolition order issues. ☐ Document the alternatives analysis in every religious property matter, consistent with 42 U.S.C. § 2000cc and the background of City of Boerne v. Flores. ☐ Consider transferable development rights, which figured in the Penn Central analysis. ☐ Publish the appeal route and standard in the ordinance. ☐ Keep a complete record of every proceeding — staff report, exhibits, minutes, and findings.

The short version

☐ Find out whether the property is listed, locally designated, or both. They are different. ☐ Meet with staff before filing anything. ☐ Bring evidence — condition assessments, photographs, cost estimates — not preferences. ☐ Address the Secretary's Standards explicitly and offer ranked alternatives. ☐ For hardship, submit the full financial package before the hearing. ☐ Ask about the federal nexus at acquisition, not at permitting. ☐ File tax credit Parts 1 and 2 before any work begins. ☐ Resolve the certificate of appropriateness before ordering a sign. ☐ For municipalities: audit the sign code for message-based categories this quarter. ☐ Build the record at the commission. Courts review what is in it.

⚠️ The single unifying rule in this field is that the administrative record decides the case. Owners lose appeals they should win because they arrived at the commission with an argument instead of a file, and municipalities lose sign cases they should never have had because nobody read the code against a decade-old decision.

Calendar and file discipline

At the first meeting on any matter in this field, calendar these:

☐ Agenda filing deadline for the next commission meeting — usually three to six weeks before the hearing. ☐ Interim protection expiration, if a nomination triggered a stay. ☐ Appeal deadline from any decision — typically 15 to 30 days and jurisdictional. ☐ State credit reservation deadline, which in capped programs can be the binding constraint on the entire project. ☐ Federal Part 2 approval target, set before the construction start date, not after. ☐ Part 3 filing on substantial completion. ☐ Recapture period end date, five years from placed-in-service. ☐ Mitigation commitment dates from any memorandum of agreement. ☐ Sign permit expiration, which in many codes lapses if the sign is not installed within a set period.

Keep in the file:

☐ The nomination or designation ordinance and the recorded instrument ☐ Design guidelines in effect on the application date ☐ Every application, exhibit, and staff report ☐ Minutes and any recording of every hearing ☐ Written findings ☐ Condition assessments and contractor estimates ☐ Photographs dated before, during, and after ☐ The full hardship financial package where submitted ☐ Section 106 correspondence, survey reports, and the executed agreement ☐ Credit certifications Parts 1, 2, and 3, with any amendments ☐ Sign permit, certificate of appropriateness, and installation photographs

These files are cheap to maintain and impossible to reconstruct, and in a field where review is on the administrative record, they are the case.