This checklist works a nuclear or radioactive materials matter for whichever role the reader occupies. It opens with the two threshold questions — reactor or materials, and agreement state or not — that determine every subsequent answer. It covers the preemption framing that decides whether a state or local measure survives, the Price-Anderson financial protection structure and the federal public liability action, and the licensing pathways for reactors and for materials. It sets out the hearing petition and contention requirements in the form they must actually satisfy, the operating documents that answer most compliance questions, the change evaluation that produces the most frequent serious findings, and the enforcement posture that makes candor the dominant strategy. It closes with spent fuel and contract claims, decommissioning funding and site release, radiation claims and record preservation, and the failure patterns each participant repeats.
Participating in a Nuclear Licensing Proceeding or Radiation Claim: A Practical Checklist
Energy > Nuclear Energy, Radioactive Materials, and Decommissioning | Published 1 August 2024 - Updated 8 July 2026 | UpLaw - uplaw.us
Part 0 — Two questions before anything else
☐ ⚠️ Is this a reactor matter or a materials matter? ______ Reactors are federal everywhere. ☐ ⚠️ Is this state an agreement state under 42 U.S.C. § 2021? ______ Most are, and for materials that determines the regulator, the regulations, the inspection regime, and the appeal route. ☐ Regulator identified ______ ☐ Applicable regulations identified ______ ☐ Role identified: licensee ☐ intervenor ☐ state or local government ☐ claimant ☐ materials licensee ☐ supplier ☐
Part 1 — Preemption framing (state and local measures)
☐ Federally occupied: reactor design ☐ radiological siting criteria ☐ operating procedures ☐ technical specifications ☐ dose limits ☐ effluent controls ☐ radiological emergency planning ☐ physical security ☐ operator qualification ☐ ☐ Retained by states: whether to build ☐ cost recovery and ratemaking ☐ certificates of convenience and necessity ☐ land use within federal limits ☐ water rights ☐ non-radiological permitting ☐ taxation ☐ tort compensation ☐ ☐ ⚠️ Legislative findings drafted on economic grounds — ratepayer protection ☐ cost containment ☐ fiscal risk ☐ decommissioning funding adequacy ☐ fuel storage economics ☐ ☐ ⚠️ No recitals of accident risk or radiation exposure ☐ However sincerely held, they preempt the measure. ☐ Legislative record built on the economic grounds actually recited ☐ ☐ Authorities reviewed — Pacific Gas & Electric Co. v. State Energy Resources Conservation & Development Commission ☐ Silkwood v. Kerr-McGee Corp. ☐ English v. General Electric Co. ☐ Duke Power Co. v. Carolina Environmental Study Group, Inc. ☐ Train v. Colorado Public Interest Research Group, Inc. ☐ ☐ Non-radiological leverage identified: water withdrawal ☐ thermal discharge ☐ wetlands ☐ air permits for standby generation ☐ coastal consistency ☐ ☐ Emergency planning participation with documented objections, rather than refusal ☐
Part 2 — Financial protection and liability
☐ Framework — 42 U.S.C. § 2210 ☐ Regulations — 10 C.F.R. Part 140 ☐ ☐ Primary layer: maximum available private insurance, as a license condition ☐ ☐ Secondary layer: retrospective premiums across all operating reactor licensees ☐ ☐ Channeling and omnibus coverage confirmed ☐ Contractors and suppliers do not carry separate nuclear exposure. ☐ Indemnity agreement current and naming the correct licensee entity ☐ ☐ Contractor and supplier agreements checked for allocations inconsistent with channeling ☐ ☐ For a claimant: is the event a "nuclear incident"? ☐ If yes: federal cause of action ☐ removable ☐ consolidated ☐ state substantive law borrowed ☐
Part 3 — Licensing pathway
☐ Traditional two-step — 10 C.F.R. Part 50 ☐ Combined license — 10 C.F.R. Part 52 ☐ ☐ Statutory authority — 42 U.S.C. § 2131 ☐ 42 U.S.C. § 2133 ☐ 42 U.S.C. § 2134 ☐ 42 U.S.C. § 2073 ☐ ☐ Standard design certification relied on? ☐ Which issues are already resolved ______ ☐ Early site permit relied on? ☐ Which issues are already resolved ______ ☐ Siting criteria — 10 C.F.R. Part 100 ☐ ☐ ⚠️ Finality mapped: issues resolved at certification or early site permit are outside the scope later ☐ ☐ Environmental review — 42 U.S.C. § 4332 ☐ 10 C.F.R. Part 51 ☐ ☐ Agency organic authority — 42 U.S.C. § 5841 ☐ Purposes — 42 U.S.C. § 2011 ☐ 42 U.S.C. § 2013 ☐ Definitions — 42 U.S.C. § 2014 ☐ General authority — 42 U.S.C. § 2201 ☐
Part 4 — Hearing petition and contentions
☐ ⚠️ Petition deadline calendared the day the notice publishes ______ Enforced strictly. ☐ Hearing right — 42 U.S.C. § 2239 ☐ Procedure — 10 C.F.R. Part 2 ☐ ☐ Standing established: proximity (reactor) ☐ conventional injury showing (materials) ☐ ☐ Technical expert retained BEFORE drafting contentions ☐ ☐ Application, safety analysis, and environmental report obtained ☐ ☐ Each contention: ☐ specifies the issue of law or fact ☐ states the basis briefly ☐ is within the scope of this proceeding ☐ is material to a finding the agency must make ☐ states alleged facts or expert opinion with specific source references ☐ shows a genuine dispute, citing the specific portions of the application disputed ☐ ⚠️ Not admissible: the project is unsafe ☐ unnecessary ☐ unwise ☐ need for power ☐ matters resolved by rule ☐ psychological effects ☐ ☐ Scope limits reviewed — Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc. ☐ Baltimore Gas & Electric Co. v. Natural Resources Defense Council, Inc. ☐ Metropolitan Edison Co. v. People Against Nuclear Energy ☐ ☐ Late-filed contention standard understood: new information plus diligence ☐ ☐ Productive environmental grounds identified: alternatives ☐ cumulative impacts ☐ range of reasonable alternatives ☐
Part 5 — Operating documents (read in this order)
☐ License conditions ☐ Each independently enforceable. ☐ Technical specifications ☐ limiting conditions ☐ surveillance requirements ☐ action statements and completion times ☐ design features ☐ ☐ Updated final safety analysis report ☐ ☐ Quality assurance program description ☐ ☐ Emergency plan and implementing procedures ☐ ☐ Security plan — 10 C.F.R. Part 73 ☐ Largely withheld from public disclosure. ☐ Inspection reports and enforcement actions, three years ☐ ☐ Decommissioning funding status reports ☐ ☐ ⚠️ A day on these tells you more than a month on the regulations.
Part 6 — Compliance operations
☐ Change evaluation applied to every modification ☐ ⚠️ Missing one is among the most frequent serious findings. ☐ Action statement entry timing verified against the records ☐ ☐ Corrective action program: identification ☐ evaluation ☐ extent of condition ☐ timeliness ☐ ☐ ⚠️ Extent of condition performed across all components with the same failure mode, not just the one that failed ☐ ☐ Radiation protection — 10 C.F.R. Part 20 ☐ dose limits ☐ monitoring ☐ posting ☐ surveys ☐ effluent control ☐ declared pregnant worker provisions ☐ ☐ Transportation — 10 C.F.R. Part 71 ☐ package certification ☐ routing ☐ notifications ☐ ☐ Spent fuel storage — 10 C.F.R. Part 72 ☐ Low-level waste — 10 C.F.R. Part 61 ☐ ☐ Reporting thresholds known and calendared: overexposures ☐ lost sources ☐ releases ☐ security events ☐
Part 7 — Materials licensees
☐ Byproduct — 10 C.F.R. Part 30 ☐ Medical use — 10 C.F.R. Part 35 ☐ Source material — 10 C.F.R. Part 40 ☐ ☐ ⚠️ License authorizes the specific material, quantity, use, and location actually in play ☐ The most common violation is use outside the license's terms. ☐ Authorized users current ☐ Radiation safety officer designated and qualified ☐ Training documented ☐ ☐ Sealed source and device registration verified for each device ☐ ☐ Inventory and leak testing on schedule, with records ☐ ☐ Aggregate inventory checked against increased-controls thresholds ☐ ☐ Reciprocity confirmed before working in another jurisdiction ☐ ☐ Transfer, disposal, and termination obligations identified at the outset ☐ ☐ ⚠️ Orphaned sources — financial assurance and end-of-operations disposal plan in place ☐
Part 8 — Enforcement and employee protection
☐ Findings characterized by safety significance, not technical severity ☐ ☐ ⚠️ Self-identification credited substantially ☐ Internal reporting made fast and consequence-free ☐ ☐ ⚠️ Willfulness is categorical ☐ Falsification and incomplete or inaccurate information treated separately and severely ☐ ☐ Completeness and accuracy obligation understood as independent ☐ ☐ Corrective action program records prepared for inspection ☐ ☐ Escalation understood: finding → notice of violation → civil penalty → order ☐ ☐ Employee protection: retaliation prohibited ☐ administrative deadline calendared ☐ Short and routinely missed. ☐ Chilled work environment indicators monitored: reorganizations after concerns ☐ informal discouragement ☐ corrective action backlog ☐ ☐ Surviving state-law claims noted — English v. General Electric Co. ☐
Part 9 — License transfers and financial qualification
☐ Transferee financial qualifications reviewed ☐ ☐ ⚠️ Adequacy of the decommissioning fund being transferred assessed independently ☐ ☐ Indemnity agreement assignment confirmed ☐ ☐ Continuity of quality assurance and emergency planning programs confirmed ☐ ☐ Foreign ownership, control, or domination screened ☐ ☐ State commission approvals for the underlying transaction identified in parallel ☐ ☐ ⚠️ Transfers to specialized decommissioning companies raise the sharpest questions, because the business model depends on completing the work for less than the fund contains.
Part 10 — Spent fuel and contract claims
☐ Framework — 42 U.S.C. § 10101 ☐ 42 U.S.C. § 10131 ☐ 42 U.S.C. § 10222 ☐ ☐ On-site storage licensed — 10 C.F.R. Part 72 ☐ General or specific license ☐ Aging management ☐ Security ☐ ☐ Breach damages segregated in the accounting system from the outset ☐ ☐ Incremental cost documented contemporaneously ☐ ☐ Continuing claim schedule maintained as costs accrue ☐ ☐ ⚠️ The site is not released while casks remain — security and monitoring costs continue ☐
Part 11 — Decommissioning
☐ Funding mechanism: external sinking fund ☐ surety ☐ insurance ☐ rate recovery ☐ ☐ Cost estimate tested against current market conditions, not carried forward mechanically ☐ ☐ ⚠️ Early economic shutdown leaves the accrual short ☐ Shortfall source identified ______ ☐ Stages: cessation certification ☐ fuel removal certification ☐ post-shutdown activities report ☐ strategy selection ☐ license amendments ☐ final status survey ☐ termination ☐ ☐ Strategy: prompt dismantlement ☐ delayed dismantlement with safe storage ☐ entombment ☐ ☐ Site release criteria: unrestricted ☐ restricted ☐ The difference is worth a great deal of money. ☐ Emergency plan and security reductions requested as the hazard profile falls ☐ ☐ Local fiscal impact addressed in advance: tax valuation ☐ employment ☐ community transition ☐
Part 12 — Radiation claims
☐ Type: occupational ☐ contamination or property ☐ medical misadministration ☐ whistleblower ☐ ☐ ⚠️ Preserve immediately: dosimetry and bioassay records ☐ medical records ☐ residence and employment history ☐ incident reports ☐ area survey records ☐ ☐ Standard supplied by 10 C.F.R. Part 20; medical events by 10 C.F.R. Part 35 ☐ ☐ Public liability action structure applicable? ☐ Changes forum, procedure, and funding. ☐ ⚠️ Causation planned for: indistinguishable presentation ☐ long latency ☐ contested dose reconstruction ☐ ☐ Absence of required monitoring noted — it cuts against the party required to monitor ☐ ☐ Employee protection administrative deadline calendared ☐
Part 13 — Failure patterns by role
Licensee ☐ missed change evaluation ☐ late action statement entry ☐ narrow extent of condition ☐ incomplete or inaccurate information ☐ chilled work environment ☐ mechanical funding status reports ☐ Intervenor ☐ missed petition deadline ☐ conclusory contentions ☐ contesting matters resolved by rule ☐ no expert before drafting ☐ ignoring non-radiological permits ☐ State or local government ☐ safety framing where economic framing was available ☐ declining emergency planning participation ☐ overlooking retained water and land use authority ☐ no plan for decommissioning-era fiscal impact ☐ Claimant ☐ waiting on records ☐ late employee protection filing ☐ assuming state court ☐
Part 14 — Drafting a contention that survives
The contention is the whole contest for an intervenor. Work through this before writing a word of it.
☐ Identify the document and the page. A contention must engage a specific portion of the application, safety analysis, or environmental report. Record the document title, revision, section, and page for each assertion. ☐ State the dispute as a factual proposition. "The applicant used a ground motion input of X where the referenced source specifies Y" rather than "the seismic analysis is inadequate." ☐ Attach the support. An expert declaration, a published source, a regulatory guidance document, or a passage from the application itself. A contention supported only by counsel's assertion fails. ☐ Tie it to a required finding. Identify the specific finding the agency must make and explain how the disputed fact bears on it. A true fact that does not affect a required finding is immaterial. ☐ Confirm scope. Is this issue within this proceeding, or was it resolved at design certification, early site permit, or by generic rule? Check before drafting, not after the answer. ☐ Confirm it is not a challenge to a regulation. A contention that a regulation is inadequate is inadmissible; the remedy is a petition for rulemaking or a waiver request, on a different track. ☐ Anticipate the applicant's answer. The most common successful response is that the application already addresses the point at a page the intervenor did not read. ☐ Plan for amendment. Contentions may be amended or supplemented when new information emerges, on a diligence standard; build the record of when you learned what. ☐ Prioritize. One admissible contention keeps the proceeding alive. Ten conclusory ones do not.
Part 15 — Supplier and contractor obligations
☐ Identify which party holds the license and therefore bears regulatory responsibility ☐ ☐ Access authorization and fitness-for-duty requirements allocated by contract, including cost and consequence of denial ☐ ☐ ⚠️ No allocation of nuclear liability inconsistent with statutory channeling ☐ The omnibus coverage is the point. ☐ Non-nuclear commercial indemnity drafted separately and explicitly ☐ ☐ Quality assurance flow-down where the work affects safety-related structures, systems, or components ☐ ☐ Defect and noncompliance reporting obligations included ☐ ☐ Commercial-grade dedication requirements understood and priced ☐ ☐ Records retention specified — regulatory periods exceed commercial ones, sometimes by decades ☐ ☐ Right of regulatory access to the supplier stated in the contract ☐ ☐ Export control and nonproliferation screening where equipment, material, or technical data crosses borders ☐ ☐ Change control: supplier substitution or design change may require licensee evaluation and prior approval ☐ Schedule accommodates it ☐ ☐ Employee protection program required of the supplier ☐ ☐ ⚠️ A supplier that treats a nuclear order as an ordinary industrial order should not bid. Documentation is the substance of the obligation, not paperwork around it.
Part 16 — Economic context to keep in view
☐ Capital dominates; marginal cost is near zero ☐ ☐ Schedule risk compounds financing cost on an enormous balance ☐ Which is why predictability is worth more here than almost anywhere. ☐ Merchant market design penalizes this cost structure ☐ Several plants closed for market reasons while operating safely and reliably. ☐ State support mechanisms and the wholesale-price boundary litigation they generated ☐ ☐ Decommissioning accrues during operation and is paid at the end ☐ ☐ Spent fuel storage is a cost the operator did not agree to bear ☐ ☐ ⚠️ Every current controversy is an argument about adjusting one part of an architecture built because ordinary commercial terms could not support the technology. ☐ Identify which part is at issue ______
Part 17 — Jurisdiction map for a hard question
When a question seems difficult, it is frequently addressed to the wrong decision-maker. Work down this list.
| Question | Decision-maker | Instrument | Review |
|---|---|---|---|
| May this reactor design be used? | Federal regulator | Design certification rule | Rulemaking record, judicial review |
| May a plant be built on this site? | Federal regulator | Construction permit / combined license / early site permit | Hearing, then judicial review |
| Should this plant be built at all? | State commission | Certificate of public convenience and necessity | State administrative and judicial review |
| Who pays for it? | State commission | Rate case | State review |
| Is the radiological dose acceptable? | Federal regulator | 10 C.F.R. Part 20 and license | Federal only |
| Is the thermal discharge acceptable? | State environmental agency | Water permit | State review |
| May the plant withdraw this water? | State water authority | Water right or permit | State review |
| Is the emergency plan adequate? | Federal regulator, with state and local execution | Plan and exercises | Federal, with practical state leverage |
| Who compensates an injured person? | Federal court, borrowing state law | Public liability action | Federal |
| May punitive damages be awarded? | State law, in a federal forum | Jury | Federal appeal |
| Who regulates this hospital's sources? | Agreement state agency, in most states | State license | State review |
| Who pays for decommissioning? | Federal funding assurance plus state rate treatment | Funding status reports and rate orders | Both |
| Who takes the spent fuel? | Federal department, by contract | Standard contract | Court of claims litigation |
☐ Question identified ______ ☐ Decision-maker identified ______ ☐ Instrument identified ______ ☐ ⚠️ Asking the right body usually simplifies a question that seemed hard.
Part 18 — Records retention
☐ Dose and monitoring records — retained for the period the regulations require, which outlasts employment ☐ ☐ Quality assurance records for safety-related work — often for the life of the facility ☐ ☐ Corrective action records ☐ Inspection and surveillance records ☐ ☐ Design basis documents and calculations ☐ ☐ Decommissioning cost estimates and funding status reports ☐ ☐ Spent fuel storage cost documentation, segregated for claim purposes ☐ ☐ Emergency exercise records and critiques ☐ ☐ Training and qualification records ☐ ☐ Contractor and supplier documentation received under quality flow-down ☐ ☐ ⚠️ Retention periods here exceed ordinary business policy by decades. Confirm the policy reflects them before a routine purge destroys a defense.
Related Documents
- Safety Is Federal, Money Is Not: How Nuclear Energy Law Divides Power
- Nuclear Energy and Radioactive Materials: A Comprehensive Guide to Licensing, Price-Anderson, Waste, and Decommissioning
- The NRC Intervention, Price-Anderson Claim, and Decommissioning Review Toolkit
- Developing a Renewable Energy Project: A Practical Checklist
- Energy Law: A Comprehensive Guide to Regulation, Markets, and Project Development
- The Energy and Utilities Toolkit
- Combining Design and Utility Patents: Concurrent Protection and Double-Patenting Pitfalls
- The Utility Billing Dispute and Service Protection Toolkit
- Electric Vehicles and Charging Infrastructure: A Comprehensive Guide to Right-to-Charge Laws, Utility Rules, Siting, and Consumer Protection
- Environmental Contamination and Cleanup: A Comprehensive Guide to Liability, Defenses, and Cost Recovery
- The Environmental Contamination and Cost Recovery Toolkit
- The Permit Is the Product: How Environmental Compliance Actually Works
- Solid Waste, Recycling, and Producer Responsibility: A Comprehensive Guide to RCRA, Landfills, Haulers, Electronics, and Packaging Programs
- Everything You Throw Away Belongs to Somebody: How Waste Law Actually Works
- Environmental Permitting and Compliance: A Comprehensive Guide to Air, Water, and Waste Authorizations
- The Chemical Reporting, Emergency Planning, and Community Information Toolkit
- Eminent Domain and Takings: A Comprehensive Guide to Public Use, Just Compensation, and Inverse Condemnation
- Responding to a Condemnation Offer and Valuing a Taking: A Practical Checklist
- The Route Objection, Easement Negotiation, and Condemnation Response Toolkit
- The Administrative Law Toolkit
- Administrative Law: A Comprehensive Guide to Agency Action and Judicial Review
- Administrative Law: A Comprehensive Guide to Rulemaking, Adjudication, and Judicial Review
- Five Steps and a Grid: How the Government Decides Whether You Are Disabled
- The Residential Solar and Home Energy Contract Toolkit
- Evaluating, Signing, or Unwinding a Residential Solar Agreement: A Practical Checklist
- Twenty-Five Years on Your Roof: What a Residential Solar Contract Actually Commits You To
- The Toxic Exposure Claim and Causation Toolkit
- Proving What Made You Sick: How Toxic Exposure Cases Are Actually Built
- Toxic Torts and Environmental Exposure: A Comprehensive Guide to Causation, Experts, and Damages
- Title, Survey, and Closing Problems: A Comprehensive Guide to Defects, Insurance, and Cures
- Home-Based Business, Cottage Food, and Street Vending: A Comprehensive Guide to Zoning, Permits, Food Rules, and Insurance
- Gig and Platform Work: A Comprehensive Guide to Classification, Deactivation, Insurance Gaps, and Pay Transparency
- Filing FEMA, Flood, and Disaster Loan Claims After a Catastrophe: A Practical Checklist
- The Water Line on the Wall: How Disaster Recovery Money Actually Reaches a Household
- The Disaster Assistance and Flood Claim Toolkit
- The Clinical Research Compliance and Human Subjects Toolkit
- Launching and Running a Compliant Clinical Study: A Practical Checklist
- Clinical Research and Human Subjects Protection: A Comprehensive Guide to the Common Rule, IRBs, FDA Requirements, and Trial Agreements