Toolkit · Maritime

The Laytime Calculation, Notice of Readiness, and Off-Hire Statement Toolkit

Type
Toolkit
Jurisdiction
National
Date
2024-08-13
Topic
Maritime

This toolkit provides the working documents a chartering practice runs on. It contains a notice of readiness template, a statement of facts framework, a laytime calculation worksheet, a demurrage claim letter, a despatch calculation, an off-hire statement, an underperformance calculation, a safe port enquiry record, a bunker survey form, a redelivery notice sequence, a time bar diary, and a clause negotiation grid. Each template is annotated with the reason each field exists and the failure mode it prevents. Adapt the wording to the charter in hand — these are frameworks for capturing the right facts at the right time, not substitutes for the contract.

The Laytime Calculation, Notice of Readiness, and Off-Hire Statement Toolkit

Maritime > Charter Parties, Laytime, and Demurrage | Published 13 August 2024 - Updated 30 December 2025 | UpLaw - uplaw.us

Tool 1: Notice of readiness

NOTICE OF READINESS

Vessel:                    [name / IMO number / flag]
Port:                      [port]
Berth or position:         [berth name, or anchorage with coordinates]
Charterparty dated:        [date] between [owner] and [charterer]
Cargo:                     [description and quantity]

TO: [charterer / named recipient per clause ___]
COPY: [agents, terminal, brokers]

The above vessel arrived at [port] on [date] at [time] hours
local and is in all respects ready to [load / discharge] the
above cargo in accordance with the terms of the above charterparty.

NOTICE OF READINESS IS HEREBY TENDERED at [date] [time] hours local.

Readiness confirmations:
  Holds / tanks inspected and passed:      [date, time, surveyor]
  Cargo gear tested and operational:       [date, time]
  Free pratique:                            [granted / applied for at ___]
  Customs clearance:                        [obtained / pending]
  Documentation on board and in order:      [yes]

Master:  ______________________   Date/time: __________

RECEIPT
Received on behalf of [recipient] at [date] [time] hours local.
Signature: ______________________  Name/capacity: __________

Why each field exists. The recipient line prevents tender to the wrong party. The position line establishes arrived ship status. The readiness confirmations pre-empt the "not ready in all respects" defense. The receipt block fixes the commencement calculation, which is the line most demurrage disputes begin at.

Instruction. Tender by every means the charter permits. If receipt is refused or unacknowledged, record the attempt and re-tender. Never allow the file to contain a notice with no receipt.

Tool 2: Statement of facts framework

STATEMENT OF FACTS

Vessel: ______________  Port: ______________  Berth: ______________
Charterparty dated: ______________
Cargo and quantity: ______________________________

  EVENT                                    DATE      TIME
  End of sea passage / arrival             ______    ______
  Anchored (position)                      ______    ______
  Notice of readiness tendered             ______    ______
  Notice of readiness accepted             ______    ______
  Free pratique granted                    ______    ______
  Pilot on board                           ______    ______
  All fast alongside                       ______    ______
  Surveyor on board / holds passed         ______    ______
  Commenced loading / discharging          ______    ______
  [interruptions logged below]
  Completed loading / discharging          ______    ______
  Documents on board                       ______    ______
  Pilot on board / departure               ______    ______
  Vessel sailed                            ______    ______

  INTERRUPTIONS
  From        To          Cause                  Evidence source
  ______      ______      ________________       ________________
  ______      ______      ________________       ________________

Signed for the vessel: ______________  Master / Agent
Signed for the terminal/shipper: ______________
Signed for the agents: ______________
Date: ______________

Remarks / protests attached: [yes / no]

Why the interruption table matters. A cause without an evidence source is an assertion. "Rain" is weak; "rain, port log ref 14/0900–1400" is strong.

Instruction. Have this signed before the vessel sails. If a party refuses to sign, record the refusal and issue a written protest attaching your version.

Tool 3: Laytime calculation worksheet

LAYTIME CALCULATION — [LOAD / DISCHARGE] PORT

Charter provisions applied
  Destination:            [berth / port] charter, clause ___
  Laytime allowed:        ___ [running / working / weather working] hours/days
                          or ___ tons per day on ___ tons cargo = ___ hours
  Reversible:             [yes / no]
  SHEX / SHINC:           ___________  unless used: [yes / no]
  Notice period:          ___ hours after [tender / acceptance]
  Exceptions clause:      clause ___
  Exceptions extend to demurrage: [yes / no]  clause ___

Commencement
  NOR tendered                        ____/____ at ______
  NOR valid (arrived + ready)         [confirmed — basis: __________]
  Laytime commenced                   ____/____ at ______

Running of laytime
  From        To          Elapsed     Deduction   Clause    Evidence
  ______      ______      ______      ______      ______    __________
  ______      ______      ______      ______      ______    __________
  ______      ______      ______      ______      ______    __________

  Total elapsed:                      ______ hours
  Total deductions:                   ______ hours
  Laytime used:                       ______ hours
  Laytime allowed:                    ______ hours
  Laytime expired at:                 ____/____ ______

Demurrage / despatch
  Operation completed:                ____/____ ______
  Time on demurrage:                  ______ hours
  Demurrage rate:                     ______ per day = ______ per hour
  DEMURRAGE DUE:                      ______

  or
  Time saved (all time / working time): ______ hours
  Despatch rate:                        ______ per day
  DESPATCH DUE:                         ______

The two lines to check first when reviewing someone else's calculation. Whether the notice was valid, and whether any deduction appears after the laytime expiry line. Those two account for most disputed figures.

Tool 4: Demurrage claim letter

[Date]
To: [Charterer]
Re: MV [vessel] — charterparty dated [date] — demurrage claim

We present the owners' claim for demurrage in respect of the above
voyage. Discharge completed on [date] at [time].

  Load port demurrage:        ______ hours    ______
  Discharge port demurrage:   ______ hours    ______
  Less despatch (if any):                     (______)
  TOTAL CLAIMED:                              ______

Enclosed, in accordance with clause ___ of the charterparty:
  1. Charterparty and rider clauses
  2. Notice of readiness, load port, with receipt
  3. Notice of readiness, discharge port, with receipt
  4. Statement of facts, load port, signed
  5. Statement of facts, discharge port, signed
  6. Laytime calculation, load port
  7. Laytime calculation, discharge port
  8. Pumping log / cargo log
  9. Master's protests [list]

Payment is requested within ___ days to the account below. Owners
reserve all rights, including the right to commence arbitration
under clause ___.

[Signature]

Instruction. Send before the time bar with proof of delivery, and confirm receipt in writing. Enclose every document the clause names, even those you consider irrelevant. A short claim with a complete package beats a persuasive claim with an incomplete one.

Tool 5: Off-hire statement

OFF-HIRE STATEMENT

Vessel: ______________  Charterparty dated: ______________
Off-hire clause: ___    Basis: [net loss of time / period]
"Any other cause" wording: [with / without "whatsoever"]

  Event start:              ____/____ ______
  Event end:                ____/____ ______
  Cause:                    ____________________________
  Clause trigger relied on: ____________________________
  Evidence:                 [engine log ref / class survey / repair invoice]

  Time actually lost (net loss of time basis)
    Passage as performed:              ______ hours
    Passage at warranted performance:  ______ hours
    TIME LOST:                         ______ hours

  or Period basis
    Full duration of event:            ______ hours

  Hire rate: ______ per day = ______ per hour
  OFF-HIRE DEDUCTION CLAIMED: ______

  Associated items
    Bunkers consumed during off-hire period: ______ mt @ ______
    Port charges attributable to the event:  ______

Why the basis line comes first. On a partial impairment the net loss of time and period figures differ by a large multiple, and calculating on the wrong basis produces a deduction the owner will treat as unauthorized — which can lead to withdrawal.

Tool 6: Speed and consumption underperformance calculation

PERFORMANCE CLAIM — MV [vessel], voyage [___] to [___]

Warranted performance (clause ___)
  Speed:            ___ knots
  Consumption:      ___ mt/day [fuel grade] at sea
                    ___ mt/day in port idle / working
  Good weather definition: wind up to Beaufort ___, sea state up to
    Douglas ___, no adverse current, minimum observation period ___ hours

Good weather periods identified (weather routing report ref ______)
  From        To          Distance    Time      Avg speed   Consumption
  ______      ______      ______      ______    ______      ______

  Weighted average good weather speed:        ______ knots
  Warranted speed:                            ______ knots
  SHORTFALL:                                  ______ knots

  Total voyage distance:                      ______ nm
  Time taken at actual performance:           ______ hours
  Time at warranted performance:              ______ hours
  TIME LOST:                                  ______ hours

  Hire rate ______ per day    = TIME LOSS CLAIM ______
  Excess consumption ______ mt @ ______        = ______
  TOTAL PERFORMANCE CLAIM:                     ______

Instruction. Base the good weather selection on an independent routing report, not deck logs. Where the charter names a particular weather provider, use it — a claim calculated on a different source invites a preliminary dispute about methodology that can consume more than the claim is worth.

Tool 7: Safe port and safe berth enquiry record

SAFE PORT / BERTH ENQUIRY — nomination of [port / berth]

Vessel particulars relied on
  LOA ___  Beam ___  Summer draft ___  Air draft ___  DWT ___

Port / berth data obtained
  Declared max LOA / beam / draft:      ______  Source: ______
  Tidal window required:                ______  Source: ______
  Under-keel clearance policy:          ______  Source: ______
  Berth structure and fendering:        ______  Source: ______
  Swell / surge history:                ______  Source: ______
  Ice / seasonal restrictions:          ______  Source: ______
  Pilotage and tug availability:        ______  Source: ______
  Recent incidents at berth:            ______  Source: ______

Assessment: berth prospectively safe for this vessel at the expected
time of call?  [yes / no / conditional on ______]

Nominated by: ______________  Date: ______  Retained by: ______

Why keep this. When a grounding or berth contact claim arrives two years later, the enquiry record is what distinguishes a charterer that exercised judgment from one that named a port off a list. Under a due diligence formulation it is close to dispositive; under an absolute warranty it still shapes the abnormal-occurrence argument.

Tool 8: Bunker survey and redelivery record

BUNKER SURVEY — [DELIVERY / REDELIVERY]

Vessel: ______  Date/time: ______  Place: ______
Attending: [owners' surveyor] ______  [charterers' surveyor] ______

  Grade        Tank        Sounded qty     Temp     Density    MT
  ______       ______      ______          ______   ______     ______

  TOTAL [grade 1]: ______ mt      Contract price: ______
  TOTAL [grade 2]: ______ mt      Contract price: ______

  Unpumpable quantity noted:      ______ mt
  Samples drawn and sealed:       [seal numbers ______]
  Samples retained by:            owners ___ charterers ___ vessel ___

Signed: ______________ (owners)   ______________ (charterers)

REDELIVERY
  Place of redelivery:            ______________
  Date and time of redelivery:    ______________
  Last permitted redelivery date: ______________
  Condition remarks:              ______________
  Outstanding items / protests:   ______________

Instruction. A joint survey with sealed samples eliminates the great majority of bunker disputes. Where the counterparty declines to attend, conduct the survey anyway, record the invitation and the declination, and retain the samples.

Tool 9: Redelivery notice sequence

REDELIVERY NOTICES — clause ___ requires: ___ / ___ / ___ / ___ days

  Notice          Due by          Given on        Estimated redelivery
  ___ days        ______          ______          ______
  ___ days        ______          ______          ______
  ___ days        ______          ______          ______
  Definite        ______          ______          ______

Final voyage legitimacy assessment
  Voyage ordered:                 ______________________
  Estimated duration:             ______ days
  Charter expiry:                 ______
  Expected redelivery:            ______
  Legitimate when ordered?        [yes / no]
  If no, owners' response:        [refused / performed under protest]

Why the legitimacy line matters. If the final voyage could not reasonably be expected to permit timely redelivery when it was ordered, the owner may refuse it. If the owner performs instead, the charterer pays the market rate for the overrun period, which in a rising market can exceed the charter rate substantially.

Tool 10: Time bar diary

TIME BAR DIARY — MV [vessel], charterparty [date]

  Event                              Date        Bar period    Deadline
  Load port operations completed     ______      ______        ______
  Discharge completed                ______      ______        ______
  Demurrage claim due (clause ___)   ______      ___ days      ______
  Internal target (deadline -14d)                              ______
  Documents required by clause ___:
     [ ] charterparty
     [ ] NOR load / receipt
     [ ] NOR discharge / receipt
     [ ] SOF load, signed
     [ ] SOF discharge, signed
     [ ] laytime calculations
     [ ] pumping log
     [ ] protests
  Claim sent:            ______   Method: ______  Delivery proof: ______
  Receipt confirmed:     ______
  Arbitration time bar (if separate): ______
  Arbitrator appointment deadline:     ______

Instruction. Open this diary the day the fixture is concluded and populate the deadlines the day discharge completes. The internal target exists because assembling the document package always takes longer than expected.

Tool 11: Clause negotiation grid

Use this at the fixture stage. For each row, record the position you want, the position offered, and the concession you will trade for it.

  Clause                      Owner wants        Charterer wants    Agreed
  Destination                 port charter       berth charter      ______
  Waiting for berth           counts in full     does not count     ______
  Laytime measure             running            weather working    ______
  Reversible                  no                 yes                ______
  SHEX unless used            yes                even if used       ______
  NOR: WIBON/WIPON            yes                no                 ______
  NOR hours                   any time           office hours       ______
  Notice period               none/short         12 hours           ______
  Free pratique precondition  no                 yes                ______
  Exceptions extend to
    demurrage                 no                 yes                ______
  Demurrage rate              ______             ______             ______
  Demurrage cap               none               ___ days           ______
  Despatch                    none/half rate     half rate ATS      ______
  Time bar                    120 days, short
                              document list      60 days, full      ______
  Cesser                      none/limited       full               ______
  Safe port standard          absolute warranty  due diligence      ______
  Off-hire basis              net loss of time   period             ______
  "Any other cause"           without whatsoever with whatsoever    ______
  Anti-technicality           none               3 banking days     ______
  Good weather definition     narrow             broad              ______
  Redelivery notices          more, earlier      fewer              ______

How to use it. The rows are not equally valuable. On a congested trade, the destination and waiting-for-berth rows are worth more than several points on the freight rate. On a long time charter in a volatile market, the off-hire basis and the good weather definition are worth more than the hire rate. Identify the two or three rows that matter for the specific trade and concede the rest deliberately.

Tool 12: Authority reference sheet

Keep this with the file. These are the provisions and decisions that recur.

Arbitration. 9 U.S.C. § 1 defines maritime transactions within the arbitration scheme. 9 U.S.C. § 2 makes written arbitration agreements valid, irrevocable, and enforceable. 9 U.S.C. § 3 provides for stays of litigation and 9 U.S.C. § 4 for orders compelling arbitration. 9 U.S.C. § 9 governs confirmation of awards and 9 U.S.C. § 10 the narrow grounds for vacatur. 9 U.S.C. § 201, 9 U.S.C. § 202, 9 U.S.C. § 203, and 9 U.S.C. § 207 implement the convention on recognition and enforcement of foreign arbitral awards.

Jurisdiction and venue. 28 U.S.C. § 1333 confers admiralty jurisdiction while preserving the savings-to-suitors clause. 28 U.S.C. § 1391 governs venue and 28 U.S.C. § 1404 transfer.

Carriage of goods. 46 U.S.C. § 30701, 46 U.S.C. § 30702, and 46 U.S.C. § 30705 supply the statutory carriage regime applicable to bills of lading in foreign trade — relevant whenever a charterer issues bills to third-party cargo.

Shipping regulation. 46 U.S.C. § 40102 supplies definitions and 46 U.S.C. § 40103 the scope of application. 46 U.S.C. § 41102 sets out core prohibitions; 46 U.S.C. § 41104 addresses common carrier tariff and service contract obligations; 46 U.S.C. § 41105 and 46 U.S.C. § 41106 supply related requirements; and 46 U.S.C. § 41109 provides enforcement and reparations. Implementing regulations appear at 46 C.F.R. Part 515 (intermediary licensing and financial responsibility), 46 C.F.R. Part 520 (publication of rates and terms), 46 C.F.R. Part 530, 46 C.F.R. Part 531, and 46 C.F.R. Part 532 (service contracts), and 46 C.F.R. Part 545 (prohibited practices).

Arbitration and forum decisions.

Admiralty jurisdiction and applicable law.

Through carriage.

How the twelve tools fit together

Before the fixture: Tool 11 (clause grid) and Tool 12 (authority sheet).

At nomination: Tool 7 (safe port enquiry).

At delivery, on a time charter: Tool 8 (bunker survey).

On arrival: Tool 1 (notice of readiness).

Throughout the port call: Tool 2 (statement of facts).

After sailing: Tool 3 (laytime calculation).

Within the time bar: Tool 4 (demurrage claim) and Tool 10 (time bar diary).

During a time charter: Tool 5 (off-hire statement) and Tool 6 (performance claim), monthly.

Approaching the end: Tool 9 (redelivery notices) and Tool 8 again (redelivery bunkers).

The sequence is the point. Each tool captures a fact at the only moment it is cheaply available, and every one of them exists because someone once tried to reconstruct that fact two years later and could not.