Toolkit · Maritime
The Laytime Calculation, Notice of Readiness, and Off-Hire Statement Toolkit
- Type
- Toolkit
- Jurisdiction
- National
- Date
- 2024-08-13
- Topic
- Maritime
This toolkit provides the working documents a chartering practice runs on. It contains a notice of readiness template, a statement of facts framework, a laytime calculation worksheet, a demurrage claim letter, a despatch calculation, an off-hire statement, an underperformance calculation, a safe port enquiry record, a bunker survey form, a redelivery notice sequence, a time bar diary, and a clause negotiation grid. Each template is annotated with the reason each field exists and the failure mode it prevents. Adapt the wording to the charter in hand — these are frameworks for capturing the right facts at the right time, not substitutes for the contract.
The Laytime Calculation, Notice of Readiness, and Off-Hire Statement Toolkit
Maritime > Charter Parties, Laytime, and Demurrage | Published 13 August 2024 - Updated 30 December 2025 | UpLaw - uplaw.us
Tool 1: Notice of readiness
NOTICE OF READINESS
Vessel: [name / IMO number / flag]
Port: [port]
Berth or position: [berth name, or anchorage with coordinates]
Charterparty dated: [date] between [owner] and [charterer]
Cargo: [description and quantity]
TO: [charterer / named recipient per clause ___]
COPY: [agents, terminal, brokers]
The above vessel arrived at [port] on [date] at [time] hours
local and is in all respects ready to [load / discharge] the
above cargo in accordance with the terms of the above charterparty.
NOTICE OF READINESS IS HEREBY TENDERED at [date] [time] hours local.
Readiness confirmations:
Holds / tanks inspected and passed: [date, time, surveyor]
Cargo gear tested and operational: [date, time]
Free pratique: [granted / applied for at ___]
Customs clearance: [obtained / pending]
Documentation on board and in order: [yes]
Master: ______________________ Date/time: __________
RECEIPT
Received on behalf of [recipient] at [date] [time] hours local.
Signature: ______________________ Name/capacity: __________
Why each field exists. The recipient line prevents tender to the wrong party. The position line establishes arrived ship status. The readiness confirmations pre-empt the "not ready in all respects" defense. The receipt block fixes the commencement calculation, which is the line most demurrage disputes begin at.
Instruction. Tender by every means the charter permits. If receipt is refused or unacknowledged, record the attempt and re-tender. Never allow the file to contain a notice with no receipt.
Tool 2: Statement of facts framework
STATEMENT OF FACTS
Vessel: ______________ Port: ______________ Berth: ______________
Charterparty dated: ______________
Cargo and quantity: ______________________________
EVENT DATE TIME
End of sea passage / arrival ______ ______
Anchored (position) ______ ______
Notice of readiness tendered ______ ______
Notice of readiness accepted ______ ______
Free pratique granted ______ ______
Pilot on board ______ ______
All fast alongside ______ ______
Surveyor on board / holds passed ______ ______
Commenced loading / discharging ______ ______
[interruptions logged below]
Completed loading / discharging ______ ______
Documents on board ______ ______
Pilot on board / departure ______ ______
Vessel sailed ______ ______
INTERRUPTIONS
From To Cause Evidence source
______ ______ ________________ ________________
______ ______ ________________ ________________
Signed for the vessel: ______________ Master / Agent
Signed for the terminal/shipper: ______________
Signed for the agents: ______________
Date: ______________
Remarks / protests attached: [yes / no]
Why the interruption table matters. A cause without an evidence source is an assertion. "Rain" is weak; "rain, port log ref 14/0900–1400" is strong.
Instruction. Have this signed before the vessel sails. If a party refuses to sign, record the refusal and issue a written protest attaching your version.
Tool 3: Laytime calculation worksheet
LAYTIME CALCULATION — [LOAD / DISCHARGE] PORT
Charter provisions applied
Destination: [berth / port] charter, clause ___
Laytime allowed: ___ [running / working / weather working] hours/days
or ___ tons per day on ___ tons cargo = ___ hours
Reversible: [yes / no]
SHEX / SHINC: ___________ unless used: [yes / no]
Notice period: ___ hours after [tender / acceptance]
Exceptions clause: clause ___
Exceptions extend to demurrage: [yes / no] clause ___
Commencement
NOR tendered ____/____ at ______
NOR valid (arrived + ready) [confirmed — basis: __________]
Laytime commenced ____/____ at ______
Running of laytime
From To Elapsed Deduction Clause Evidence
______ ______ ______ ______ ______ __________
______ ______ ______ ______ ______ __________
______ ______ ______ ______ ______ __________
Total elapsed: ______ hours
Total deductions: ______ hours
Laytime used: ______ hours
Laytime allowed: ______ hours
Laytime expired at: ____/____ ______
Demurrage / despatch
Operation completed: ____/____ ______
Time on demurrage: ______ hours
Demurrage rate: ______ per day = ______ per hour
DEMURRAGE DUE: ______
or
Time saved (all time / working time): ______ hours
Despatch rate: ______ per day
DESPATCH DUE: ______
The two lines to check first when reviewing someone else's calculation. Whether the notice was valid, and whether any deduction appears after the laytime expiry line. Those two account for most disputed figures.
Tool 4: Demurrage claim letter
[Date]
To: [Charterer]
Re: MV [vessel] — charterparty dated [date] — demurrage claim
We present the owners' claim for demurrage in respect of the above
voyage. Discharge completed on [date] at [time].
Load port demurrage: ______ hours ______
Discharge port demurrage: ______ hours ______
Less despatch (if any): (______)
TOTAL CLAIMED: ______
Enclosed, in accordance with clause ___ of the charterparty:
1. Charterparty and rider clauses
2. Notice of readiness, load port, with receipt
3. Notice of readiness, discharge port, with receipt
4. Statement of facts, load port, signed
5. Statement of facts, discharge port, signed
6. Laytime calculation, load port
7. Laytime calculation, discharge port
8. Pumping log / cargo log
9. Master's protests [list]
Payment is requested within ___ days to the account below. Owners
reserve all rights, including the right to commence arbitration
under clause ___.
[Signature]
Instruction. Send before the time bar with proof of delivery, and confirm receipt in writing. Enclose every document the clause names, even those you consider irrelevant. A short claim with a complete package beats a persuasive claim with an incomplete one.
Tool 5: Off-hire statement
OFF-HIRE STATEMENT
Vessel: ______________ Charterparty dated: ______________
Off-hire clause: ___ Basis: [net loss of time / period]
"Any other cause" wording: [with / without "whatsoever"]
Event start: ____/____ ______
Event end: ____/____ ______
Cause: ____________________________
Clause trigger relied on: ____________________________
Evidence: [engine log ref / class survey / repair invoice]
Time actually lost (net loss of time basis)
Passage as performed: ______ hours
Passage at warranted performance: ______ hours
TIME LOST: ______ hours
or Period basis
Full duration of event: ______ hours
Hire rate: ______ per day = ______ per hour
OFF-HIRE DEDUCTION CLAIMED: ______
Associated items
Bunkers consumed during off-hire period: ______ mt @ ______
Port charges attributable to the event: ______
Why the basis line comes first. On a partial impairment the net loss of time and period figures differ by a large multiple, and calculating on the wrong basis produces a deduction the owner will treat as unauthorized — which can lead to withdrawal.
Tool 6: Speed and consumption underperformance calculation
PERFORMANCE CLAIM — MV [vessel], voyage [___] to [___]
Warranted performance (clause ___)
Speed: ___ knots
Consumption: ___ mt/day [fuel grade] at sea
___ mt/day in port idle / working
Good weather definition: wind up to Beaufort ___, sea state up to
Douglas ___, no adverse current, minimum observation period ___ hours
Good weather periods identified (weather routing report ref ______)
From To Distance Time Avg speed Consumption
______ ______ ______ ______ ______ ______
Weighted average good weather speed: ______ knots
Warranted speed: ______ knots
SHORTFALL: ______ knots
Total voyage distance: ______ nm
Time taken at actual performance: ______ hours
Time at warranted performance: ______ hours
TIME LOST: ______ hours
Hire rate ______ per day = TIME LOSS CLAIM ______
Excess consumption ______ mt @ ______ = ______
TOTAL PERFORMANCE CLAIM: ______
Instruction. Base the good weather selection on an independent routing report, not deck logs. Where the charter names a particular weather provider, use it — a claim calculated on a different source invites a preliminary dispute about methodology that can consume more than the claim is worth.
Tool 7: Safe port and safe berth enquiry record
SAFE PORT / BERTH ENQUIRY — nomination of [port / berth]
Vessel particulars relied on
LOA ___ Beam ___ Summer draft ___ Air draft ___ DWT ___
Port / berth data obtained
Declared max LOA / beam / draft: ______ Source: ______
Tidal window required: ______ Source: ______
Under-keel clearance policy: ______ Source: ______
Berth structure and fendering: ______ Source: ______
Swell / surge history: ______ Source: ______
Ice / seasonal restrictions: ______ Source: ______
Pilotage and tug availability: ______ Source: ______
Recent incidents at berth: ______ Source: ______
Assessment: berth prospectively safe for this vessel at the expected
time of call? [yes / no / conditional on ______]
Nominated by: ______________ Date: ______ Retained by: ______
Why keep this. When a grounding or berth contact claim arrives two years later, the enquiry record is what distinguishes a charterer that exercised judgment from one that named a port off a list. Under a due diligence formulation it is close to dispositive; under an absolute warranty it still shapes the abnormal-occurrence argument.
Tool 8: Bunker survey and redelivery record
BUNKER SURVEY — [DELIVERY / REDELIVERY]
Vessel: ______ Date/time: ______ Place: ______
Attending: [owners' surveyor] ______ [charterers' surveyor] ______
Grade Tank Sounded qty Temp Density MT
______ ______ ______ ______ ______ ______
TOTAL [grade 1]: ______ mt Contract price: ______
TOTAL [grade 2]: ______ mt Contract price: ______
Unpumpable quantity noted: ______ mt
Samples drawn and sealed: [seal numbers ______]
Samples retained by: owners ___ charterers ___ vessel ___
Signed: ______________ (owners) ______________ (charterers)
REDELIVERY
Place of redelivery: ______________
Date and time of redelivery: ______________
Last permitted redelivery date: ______________
Condition remarks: ______________
Outstanding items / protests: ______________
Instruction. A joint survey with sealed samples eliminates the great majority of bunker disputes. Where the counterparty declines to attend, conduct the survey anyway, record the invitation and the declination, and retain the samples.
Tool 9: Redelivery notice sequence
REDELIVERY NOTICES — clause ___ requires: ___ / ___ / ___ / ___ days
Notice Due by Given on Estimated redelivery
___ days ______ ______ ______
___ days ______ ______ ______
___ days ______ ______ ______
Definite ______ ______ ______
Final voyage legitimacy assessment
Voyage ordered: ______________________
Estimated duration: ______ days
Charter expiry: ______
Expected redelivery: ______
Legitimate when ordered? [yes / no]
If no, owners' response: [refused / performed under protest]
Why the legitimacy line matters. If the final voyage could not reasonably be expected to permit timely redelivery when it was ordered, the owner may refuse it. If the owner performs instead, the charterer pays the market rate for the overrun period, which in a rising market can exceed the charter rate substantially.
Tool 10: Time bar diary
TIME BAR DIARY — MV [vessel], charterparty [date]
Event Date Bar period Deadline
Load port operations completed ______ ______ ______
Discharge completed ______ ______ ______
Demurrage claim due (clause ___) ______ ___ days ______
Internal target (deadline -14d) ______
Documents required by clause ___:
[ ] charterparty
[ ] NOR load / receipt
[ ] NOR discharge / receipt
[ ] SOF load, signed
[ ] SOF discharge, signed
[ ] laytime calculations
[ ] pumping log
[ ] protests
Claim sent: ______ Method: ______ Delivery proof: ______
Receipt confirmed: ______
Arbitration time bar (if separate): ______
Arbitrator appointment deadline: ______
Instruction. Open this diary the day the fixture is concluded and populate the deadlines the day discharge completes. The internal target exists because assembling the document package always takes longer than expected.
Tool 11: Clause negotiation grid
Use this at the fixture stage. For each row, record the position you want, the position offered, and the concession you will trade for it.
Clause Owner wants Charterer wants Agreed
Destination port charter berth charter ______
Waiting for berth counts in full does not count ______
Laytime measure running weather working ______
Reversible no yes ______
SHEX unless used yes even if used ______
NOR: WIBON/WIPON yes no ______
NOR hours any time office hours ______
Notice period none/short 12 hours ______
Free pratique precondition no yes ______
Exceptions extend to
demurrage no yes ______
Demurrage rate ______ ______ ______
Demurrage cap none ___ days ______
Despatch none/half rate half rate ATS ______
Time bar 120 days, short
document list 60 days, full ______
Cesser none/limited full ______
Safe port standard absolute warranty due diligence ______
Off-hire basis net loss of time period ______
"Any other cause" without whatsoever with whatsoever ______
Anti-technicality none 3 banking days ______
Good weather definition narrow broad ______
Redelivery notices more, earlier fewer ______
How to use it. The rows are not equally valuable. On a congested trade, the destination and waiting-for-berth rows are worth more than several points on the freight rate. On a long time charter in a volatile market, the off-hire basis and the good weather definition are worth more than the hire rate. Identify the two or three rows that matter for the specific trade and concede the rest deliberately.
Tool 12: Authority reference sheet
Keep this with the file. These are the provisions and decisions that recur.
Arbitration. 9 U.S.C. § 1 defines maritime transactions within the arbitration scheme. 9 U.S.C. § 2 makes written arbitration agreements valid, irrevocable, and enforceable. 9 U.S.C. § 3 provides for stays of litigation and 9 U.S.C. § 4 for orders compelling arbitration. 9 U.S.C. § 9 governs confirmation of awards and 9 U.S.C. § 10 the narrow grounds for vacatur. 9 U.S.C. § 201, 9 U.S.C. § 202, 9 U.S.C. § 203, and 9 U.S.C. § 207 implement the convention on recognition and enforcement of foreign arbitral awards.
Jurisdiction and venue. 28 U.S.C. § 1333 confers admiralty jurisdiction while preserving the savings-to-suitors clause. 28 U.S.C. § 1391 governs venue and 28 U.S.C. § 1404 transfer.
Carriage of goods. 46 U.S.C. § 30701, 46 U.S.C. § 30702, and 46 U.S.C. § 30705 supply the statutory carriage regime applicable to bills of lading in foreign trade — relevant whenever a charterer issues bills to third-party cargo.
Shipping regulation. 46 U.S.C. § 40102 supplies definitions and 46 U.S.C. § 40103 the scope of application. 46 U.S.C. § 41102 sets out core prohibitions; 46 U.S.C. § 41104 addresses common carrier tariff and service contract obligations; 46 U.S.C. § 41105 and 46 U.S.C. § 41106 supply related requirements; and 46 U.S.C. § 41109 provides enforcement and reparations. Implementing regulations appear at 46 C.F.R. Part 515 (intermediary licensing and financial responsibility), 46 C.F.R. Part 520 (publication of rates and terms), 46 C.F.R. Part 530, 46 C.F.R. Part 531, and 46 C.F.R. Part 532 (service contracts), and 46 C.F.R. Part 545 (prohibited practices).
Arbitration and forum decisions.
- Vimar Seguros Y Reaseguros, S. A. v. M/V Sky Reefer — foreign arbitration clause in a bill of lading enforceable; forum selection is not a lessening of liability.
- Scherk v. Alberto-Culver Co. — international arbitration agreement enforced notwithstanding a statutory claim.
- Mitsubishi Motors Corp. v. Soler Chrysler-Plymouth, Inc. — statutory claims arbitrable in the international context.
- GE Energy Power Conversion France SAS, Corp. v. Outokumpu Stainless USA, LLC — nonsignatory may enforce through equitable estoppel.
- The Bremen v. Zapata Off-Shore Co. — international forum clauses prima facie valid.
- Carnival Cruise Lines, Inc. v. Shute — forum clause upheld in a non-negotiated contract.
- Atlantic Marine Constr. Co. v. United States Dist. Court for Western Dist. of Tex. — valid forum clause controls in all but exceptional cases.
Admiralty jurisdiction and applicable law.
- Exxon Corp. v. Central Gulf Lines, Inc. — admiralty jurisdiction reaches agency contracts with maritime subject matter.
- Jerome B. Grubart, Inc. v. Great Lakes Dredge & Dock Co. and Sisson v. Ruby — maritime tort jurisdiction test.
- American Dredging Co. v. Miller — forum non conveniens is not a characteristic admiralty feature preempting state law.
- Wilburn Boat Co. v. Fireman's Fund Insurance — state law governs marine insurance absent a controlling federal rule.
- Shady Grove Orthopedic Associates, P.A. v. Allstate Insurance Co. — federal procedural rules displace conflicting state law in federal court.
Through carriage.
- Norfolk Southern Railway Co. v. James N. Kirby, Pty Ltd. — intermediary can bind cargo owner; inland carrier may invoke the ocean bill's limitation.
- Kawasaki Kisen Kaisha Ltd. v. Regal-Beloit Corp. — the domestic land carriage regime does not govern the inland leg of a continuous intermodal shipment under a through bill.
How the twelve tools fit together
Before the fixture: Tool 11 (clause grid) and Tool 12 (authority sheet).
At nomination: Tool 7 (safe port enquiry).
At delivery, on a time charter: Tool 8 (bunker survey).
On arrival: Tool 1 (notice of readiness).
Throughout the port call: Tool 2 (statement of facts).
After sailing: Tool 3 (laytime calculation).
Within the time bar: Tool 4 (demurrage claim) and Tool 10 (time bar diary).
During a time charter: Tool 5 (off-hire statement) and Tool 6 (performance claim), monthly.
Approaching the end: Tool 9 (redelivery notices) and Tool 8 again (redelivery bunkers).
The sequence is the point. Each tool captures a fact at the only moment it is cheaply available, and every one of them exists because someone once tried to reconstruct that fact two years later and could not.
Related Documents
- The Clock Runs Whether Anyone Is Working: How Charter Parties and Demurrage Actually Work
- Charter Parties: A Comprehensive Guide to Voyage and Time Charters, Laytime, Demurrage, Off-Hire, and Safe Berth Warranties
- Negotiating a Charter or Pursuing a Demurrage Claim: A Practical Checklist
- Rent-a-Charter: The Bank Partnership Model and the Law That Keeps Testing It
- Credit Unions and Community Banks: A Comprehensive Guide to Charters, Membership, Deposit Insurance, and Member Rights
- Homeschooling and School Choice: A Comprehensive Guide to Home Instruction, Charters, Vouchers, and Education Savings Accounts
- The Liquor License, Trade Practice, and Direct Shipping Toolkit
- Alcohol Beverage Licensing: A Comprehensive Guide to the Three-Tier System, Permits, Trade Practices, and Direct Shipping
- Hazardous Materials Transportation: A Comprehensive Guide to Classification, Packaging, Shipping Papers, Training, and Enforcement
- Residential Construction and Home Improvement: A Comprehensive Guide to Contracts, Change Orders, Liens, and Defects
- Buying and Selling a Home: A Comprehensive Legal Guide from Contract to Closing
- The Freight Contract, Cargo Claim, and Broker Liability Toolkit
- Contracts: A Comprehensive Guide to Formation, Interpretation, Breach, Defenses, and Remedies
- The Company Setting the Price Is Not in Your Contract: How Pharmacy Benefit Managers Actually Work
- How the Law Protects Software: Copyright, Patents, Trade Secrets, and Contract Rights
- The Investor Claim and Securities Arbitration Toolkit
- Arbitration in Practice: A Comprehensive Guide to Alternative Dispute Resolution
- Filing an Arbitration Demand and Preparing for the Hearing: A Practical Checklist
- Investor Rights and Securities Claims: A Comprehensive Guide to Suitability, Fraud, Arbitration, and Remedies
- Compelling, Resisting, or Preparing for Arbitration: A Practical Checklist
- The Arbitration Agreement and Award Toolkit
- The Pallet That Never Arrived: How Freight and Cargo Claim Law Actually Works
- Freight, Cargo Claims, and Logistics: A Comprehensive Guide to Carmack, Bills of Lading, Broker Liability, and Warehouse Law
- Commercial Motor Vehicle Law: A Comprehensive Guide to Federal Safety Regulation, Carrier Liability, and Trucking Claims
- Commercial Drone Operations Under Part 107: A Compliance Checklist
- Who Owns the Moon? Property, Liability, and Debris in the Commercial Space Era
- The Oldest Duty in Commercial Law: How Innkeeper and Hotel Liability Actually Works
- CAN-SPAM Compliance for Commercial Email: A Comprehensive Guide for Businesses and Marketers
- Licensing a Commercial Launch and Satellite Operation: A Practical Checklist
- Firearms Law: A Comprehensive Guide to Purchase, Possession, Prohibited Persons, Transport, and Restoration
- Operating a School Transportation Program or Pursuing a Bus Injury Claim: A Practical Checklist
- The Bus With the Flashing Red Lights: How School Transportation Law Actually Works
- Travel and Transportation Rights: A Comprehensive Guide to Airlines, Refunds, Baggage, and Disruption
- Offering a Hazardous Material for Transport or Answering a Violation: A Practical Checklist
- The Paperwork Is the Safety System: How Hazardous Materials Transportation Actually Works