Toolkit · International Trade
The Jurisdictional Analysis, Declaration, and Mitigation Agreement Toolkit
15 U.S.C. § 18
- Type
- Toolkit
- Jurisdiction
- National
- Date
- 2024-09-22
- Topic
- International Trade
This toolkit supplies the working documents for foreign investment review. It opens with a transaction screening sheet and a control rights inventory — the two instruments that determine whether the regime applies at all. Middle instruments cover the three sensitive categories: a critical technology worksheet, a critical infrastructure check, a data holdings inventory, and a facility proximity screen. An ownership chain trace and a fund exception test follow. The filing instruments are a documented decision memorandum, a route comparison, and a submission content index. Mitigation receives a term sheet and a cost model. Later instruments cover the deal term allocation, a non-notified inquiry response protocol, an integration compliance plan, and a structuring alternatives analysis for transactions that cannot clear as structured.
The Jurisdictional Analysis, Declaration, and Mitigation Agreement Toolkit
International Trade > Foreign Investment Review and National Security | Published 22 September 2024 - Updated 29 April 2026 | UpLaw - uplaw.us
Instrument 1: Transaction screening sheet
Complete before the letter of intent. It determines whether this is a routine acquisition or a twelve-month regulatory project.
| Field | Entry |
|---|---|
| Acquirer legal name and jurisdiction of organization | |
| Is the acquirer a foreign person? Basis | |
| Target legal name and jurisdiction | |
| Is the target a United States business engaged in interstate commerce? | |
| Does the target include United States operations of a foreign parent? | |
| Transaction structure: equity, asset, merger, joint venture, real estate | |
| Percentage acquired | |
| Is this greenfield? | |
| Control analysis result (Instrument 2) | |
| Critical technology business? (Instrument 3) | |
| Critical infrastructure? (Instrument 4) | |
| Sensitive personal data? (Instrument 5) | |
| Real estate proximity coverage? (Instrument 6) | |
| Foreign government interest in the acquirer? (Instrument 7) | |
| Covered transaction? | |
| Filing mandatory? | |
| Screened by, date |
The framework. 31 C.F.R. Part 800 for business transactions; 31 C.F.R. Part 802 for real estate.
Instrument 2: Control rights inventory
There is no percentage threshold. Control is functional.
| Right | Conferred? | Source document | Control indicator |
|---|---|---|---|
| Board seat or right to appoint a director | Strong | ||
| Board observer right | Significant for covered investments | ||
| Veto or consent over material decisions | Strong | ||
| Access to material non-public technical information | Independently significant | ||
| Influence over decisions on sensitive assets or personnel | Strong | ||
| Approval over budget, business plan, or line of business | Strong | ||
| Right to select or remove officers | Strong | ||
| Contractual rights conferring practical direction | Considered | ||
| Consent over amendments adverse to the holder's rights | Customary minority protection | ||
| Consent over dissolution | Customary minority protection | ||
| Consent over changes to the class of shares held | Customary minority protection |
Conclusion line. Control / covered investment without control / not covered — with the reasoning stated, because this is the determination everything else rests on.
Instrument 3: Critical technology worksheet
The first substantive diligence task, requiring engineering input and weeks rather than days.
| Product or technology | Description | Dual-use classification | Munitions list category | Nuclear item? | Select agent or toxin? | Authorization required for export to this acquirer? |
|---|
| Conclusion | Entry |
|---|---|
| Does the target produce, design, test, manufacture, fabricate, or develop any listed item? | |
| Is the target therefore a critical technology business? | |
| Does export authorization to this foreign person's country apply? | |
| Does that create a mandatory filing? | |
| Prepared by, with engineering sign-off, date |
Why this instrument comes third and matters first. Its answer determines whether a filing is mandatory and how the review will proceed, and deferring it to a compliance schedule produces the answer after the deal structure is fixed.
Instrument 4: Critical infrastructure check
| Question | Entry |
|---|---|
| Enumerated system or asset implicated | |
| The specific listed function performed with respect to it | |
| Sector: energy / telecommunications / financial services / transportation / water / defense industrial base / other | |
| Citation to the enumeration relied on | |
| Conclusion |
The discipline. Read against the enumeration, never against the ordinary meaning of the phrase. Businesses that feel like infrastructure are frequently outside it; businesses that do not feel like infrastructure are sometimes within it because of one listed function.
Instrument 5: Data holdings inventory
| Data category | Held? | Volume | Threshold | Above threshold? | Where held | Vendor access |
|---|---|---|---|---|---|---|
| Financial | ||||||
| Insurance | ||||||
| Health | ||||||
| Physical and mental health | ||||||
| Non-public electronic communications | ||||||
| Geolocation | ||||||
| Biometric | ||||||
| Security clearance related | ||||||
| Genetic |
| Additional question | Entry |
|---|---|
| Subsidiaries included in the count? | |
| Vendor-held systems included? | |
| Any targeting of sensitive populations, regardless of volume? | |
| Conclusion |
Why companies get this wrong. The data sits somewhere nobody counted — a small subsidiary, a legacy product, a vendor platform — and the estimate is made by someone who has never queried it.
Instrument 6: Facility proximity screen
| Site | Address | Owned / leased / concession | Rights conferred | Within proximity of a listed installation? | Basis |
|---|
Rights to record: physical access, exclusion of others, improvement or development, attachment of structures. Coverage under 31 C.F.R. Part 802 turns on location and rights, not on the business conducted there.
Include everything. Leases, long-term concessions, and sites held by subsidiaries — not only purchases by the named acquirer.
Instrument 7: Ownership chain trace
| Level | Entity | Jurisdiction | Percentage held | Government interest? | Source |
|---|---|---|---|---|---|
| Acquirer | |||||
| Tier 1 owners | |||||
| Tier 2 owners | |||||
| Tier 3 owners | |||||
| Ultimate beneficial owners |
| Additional item | Entry |
|---|---|
| Any foreign government interest at any level, with percentage | |
| Sovereign funds or state-owned enterprises identified | |
| Personal identifier information assembled for individuals with material interests | |
| Prior filings, mitigation agreements, or inquiries involving the acquirer or affiliates |
Why completeness here matters more than anywhere else. The government establishes this independently. A gap it finds is corrosive in a way an uncomfortable disclosed fact is not.
Instrument 8: Fund exception test
For a fund acquirer.
| Requirement | Satisfied | Evidence |
|---|---|---|
| Managed exclusively by a general partner that is not a foreign person | ||
| Foreign limited partner cannot control investment decisions | ||
| No access to material non-public technical information | ||
| No advisory board or committee seat with governance authority over sensitive assets | ||
| Cannot unilaterally dismiss, select, or determine compensation of the general partner | ||
| No side letters conferring information or governance rights | ||
| No co-investment placing the limited partner directly on a portfolio company cap table | ||
| No single dominant foreign investor with practical influence exceeding formal rights |
What this instrument implies at fund formation. Investor disclosure provisions and rights restrictions belong in the fund documents when the fund is raised, not when an acquisition is signed.
Instrument 9: Filing decision memorandum
The document that distinguishes a considered judgment from a silence.
| Section | Content |
|---|---|
| Transaction described | |
| Covered transaction analysis, with the instruments relied on | |
| Mandatory filing analysis, with the specific category addressed | |
| If not mandatory: the risk assessment | |
| Threat: acquirer identity and ownership | |
| Vulnerability: technology, infrastructure, data, contracts, locations, supply chain | |
| Consequence: what control could enable | |
| Likelihood of identification through the non-notified pipeline | |
| Value of the safe harbor to this transaction | |
| Recommendation: declaration / notice / no filing | |
| Decision, decisionmaker, and date |
Why it exists. An unreviewed transaction remains reviewable indefinitely. If an inquiry arrives in three years, this memorandum is the answer to what the parties considered.
Instrument 10: Route comparison
| Factor | Declaration | Notice |
|---|---|---|
| Length and cost | Abbreviated, low | Comprehensive, substantial |
| Assessment period | Thirty days | Forty-five day review plus forty-five day investigation, extendable |
| Possible outcomes | Clearance; request for full notice; unilateral review; no action | Clearance; clearance with mitigation; referral to the President |
| Safe harbor | Only on clearance | Yes on clearance |
| Suitability | Straightforward or low-risk mandatory filings | Anything contested or where certainty matters |
The recorded decision. State the route chosen and why. If a declaration is chosen, state what the parties will do if the agency declines to act — because that outcome leaves the transaction reviewable.
Instrument 11: Filing content index
| Item | Prepared | Location |
|---|---|---|
| Parties and transaction structure | ||
| Acquirer ownership traced to beneficial owners (Instrument 7) | ||
| Personal identifier information | ||
| Target business, products, and customers | ||
| Export control classifications (Instrument 3) | ||
| Critical infrastructure analysis (Instrument 4) | ||
| Data holdings (Instrument 5) | ||
| Real property (Instrument 6) | ||
| Government contracts and facility clearances | ||
| Supply chain map including subtier defense positions | ||
| Acquirer's plans for the business | ||
| Prior filing and enforcement history | ||
| Pre-filing consultation: draft submitted, comments received, corrections made |
Pre-filing consultation is not optional in practice. Deficient filings are not accepted, and the staff's comments improve both the submission and the review.
Instrument 12: Mitigation term sheet
Prepare before the government proposes anything, so the parties arrive with a considered package.
| Category | Proposed by the parties | Proposed by the government | Within the deal cap? | Operational cost |
|---|---|---|---|---|
| Proxy or voting trust | ||||
| Board composition limits | ||||
| Information rights restrictions | ||||
| Voting restrictions on defined matters | ||||
| Security officer requirement | ||||
| Citizenship requirements for defined roles | ||||
| Government approval of key appointments | ||||
| Network and data segregation | ||||
| Access control by nationality | ||||
| No relocation of specified operations | ||||
| Customer restrictions | ||||
| Technology transfer restrictions | ||||
| Supply assurance commitments | ||||
| Divestiture of a component | ||||
| Compliance officer, reporting, audits, site access | ||||
| Term and termination conditions |
Instrument 13: Mitigation cost model
| Item | Year 1 | Ongoing | Basis |
|---|---|---|---|
| Compliance staffing | |||
| Systems segregation and access controls | |||
| Audit and monitoring costs | |||
| Reporting infrastructure | |||
| Operational impact | |||
| Synergies foregone from relocation restrictions | |||
| Revenue foregone from customer restrictions | |||
| Development constrained by technology restrictions | |||
| Value of any divested component | |||
| Total cost of mitigation | |||
| Compared against transaction value and the negotiated cap |
The purpose of this instrument. A buyer that has not priced plausible mitigation has not priced the transaction, and the conditions can exceed the negotiated discount.
Instrument 14: Deal term allocation sheet
| Term | Position sought | Position agreed | Notes |
|---|---|---|---|
| Clearance as a condition precedent, and its definition | |||
| Efforts standard | |||
| Whether efforts extend to accepting mitigation | |||
| Mitigation cap: materiality threshold or enumeration | |||
| Measures the buyer must accept | |||
| Measures the buyer need not accept | |||
| Divestiture obligation and its limit | |||
| Reverse termination fee | |||
| Outside date, accommodating a refiling cycle | |||
| Process control and communications | |||
| Seller consultation or approval rights | |||
| Interim operating covenants | |||
| Information rights, bounded by confidentiality | |||
| Post-closing mitigation cooperation and cost allocation |
The term to fight over. The mitigation cap, drafted as an enumeration rather than a materiality standard wherever the parties can bear the negotiation.
Run the antitrust analysis separately. 15 U.S.C. § 18, with notification under 15 U.S.C. § 18a and 16 C.F.R. Part 801, is a different question on a different record before a different decisionmaker, and clearance there says nothing here.
Instrument 15: Non-notified inquiry response protocol
| Step | Status |
|---|---|
| Counsel engaged before any response | |
| Inquiry logged: date, agency, scope, deadline | |
| How the transaction was likely identified | |
| Original transaction file located and preserved | |
| Filing decision memorandum located (Instrument 9) | |
| Facts assembled: classifications, supply chain, data, proximity, ownership | |
| Response drafted and reviewed | |
| Voluntary filing evaluated as a response | |
| Single point of contact designated |
The realistic outcomes. No action, a request to file, or a unilateral review — the last being the worst posture because the parties lose the ability to shape the initial presentation.
Instrument 16: Integration compliance plan
| Element | Owner | Implemented | Tested |
|---|---|---|---|
| Named compliance owner inside the business | |||
| Reporting calendar and infrastructure | |||
| Network and data segregation | |||
| Access control by nationality | |||
| Personnel requirements satisfied | |||
| Business restrictions communicated to decisionmakers | |||
| Supply commitments tracked | |||
| Audit readiness and document retention | |||
| Training for engineering and information technology | |||
| Change-review process for relocations, outsourcing, customers, and technology transfers | |||
| Breach response protocol |
The failure this prevents. Someone who has never read the agreement proposing a change the agreement forbids — which is how a closed matter reopens.
Instrument 17: Structuring alternatives analysis
Available only before signing.
| Alternative | Viable? | What it costs |
|---|---|---|
| Carve out the sensitive component | ||
| Restructure to a non-controlling investment without triggering rights | ||
| Compliant fund structure with genuine passivity | ||
| Greenfield | ||
| License rather than acquire | ||
| Domestic partner holding control | ||
| Abandon |
When to complete this instrument. At the same time as Instrument 9, not after an adverse signal during the review. Every alternative here disappears once the agreement is executed, at which point the parties are negotiating with each other about a risk neither can now avoid.
And on review, if it comes to that. The substantive determination is largely committed to executive judgment — Webster v. Doe — with the procedural claim analyzed under Mathews v. Eldridge, the statutory authority question decided independently under Loper Bright Enterprises v. Raimondo, and the administrative framework supplied by 5 U.S.C. § 701, 5 U.S.C. § 702, and 5 U.S.C. § 706, on the record under Citizens to Preserve Overton Park, Inc. v. Volpe and requiring reasoned decisionmaking under Motor Vehicle Manufacturers Association of the United States, Inc. v. State Farm Mutual Automobile Insurance Co.. The background — United States v. Curtiss-Wright Export Corp., Youngstown Sheet & Tube Co. v. Sawyer, Dames & Moore v. Regan under 50 U.S.C. § 1701 and 50 U.S.C. § 1702, Trump v. Hawaii, and Holder v. Humanitarian Law Project — establishes that challenges to the authority itself fail predictably.
How the instruments fit together
Before the letter of intent. Instruments 1 through 8. They determine whether the regime applies and what the review will concentrate on, and they are the five facts a party usually does not know about itself.
Before signing. Instruments 9, 13, 14, and 17. The filing decision, the cost of mitigation, the risk allocation, and the alternatives — all of which disappear or become far more expensive once the agreement is executed.
At filing. Instruments 10, 11, and 12.
After clearance. Instrument 16, from day one of integration.
If nothing above was done. Instrument 15, which is the only instrument in this toolkit that cannot be prepared in advance — and the one whose outcome is determined almost entirely by whether the others were.
Related Documents
- The Deal Can Be Unwound After It Closes: How Foreign Investment Review Actually Works
- Foreign Investment Review: A Comprehensive Guide to Covered Transactions, Mandatory Filings, Mitigation, and Enforcement
- Assessing a Transaction for Foreign Investment Review: A Practical Checklist
- What It Is Called Decides What It Costs: How Customs Classification Actually Works
- Customs Law: A Comprehensive Guide to Classification, Valuation, Country of Origin, Marking, Penalties, and Protests
- Classifying an Import or Responding to a Customs Notice: A Practical Checklist
- The Classification Analysis, Ruling Request, and Prior Disclosure Toolkit
- Two Agencies Must Both Say Yes: How Trade Remedy Cases Actually Work
- Trade Remedies: A Comprehensive Guide to Antidumping, Countervailing Duties, Injury Determinations, Reviews, and Circumvention
- Participating in a Trade Remedy Investigation: A Practical Checklist
- The Questionnaire Response, Injury Evidence, and Administrative Review Toolkit
- The Item, the Destination, the Person, and the Use: How Export Controls Actually Work
- Export Controls and Sanctions: A Comprehensive Guide to Classification, Licensing, Deemed Exports, Sanctions Programs, and Voluntary Disclosure
- Screening an Export or Responding to a Potential Violation: A Practical Checklist
- The Jurisdiction and Classification Worksheet, Screening Protocol, and Voluntary Disclosure Toolkit
- Made Where Is a Legal Conclusion, Not a Fact: How Rules of Origin Actually Work
- Trade Preference Programs: A Comprehensive Guide to Rules of Origin, Regional Value Content, Certification, Verification, and Duty Savings
- Claiming Preferential Treatment or Answering a Verification: A Practical Checklist
- The Origin Determination, Bill of Materials Analysis, and Certification Recordkeeping Toolkit
- The Stamp That Makes a Paper Real: What Notarization Actually Proves
- Notarization and Document Authentication: A Comprehensive Guide to Acknowledgments, Jurats, Apostilles, and Remote Notarization
- Standards of Review in Second Circuit Trademark Appeals: A Practical Guide
- The Case Is Never About Whether the Doctor Was Good: How Hospital Peer Review Actually Works
- Drafting and Reviewing a Purchase Order and Terms of Sale: A Practical Checklist
- Drafting, Reviewing, and Enforcing a Contract: A Practical Checklist
- Facing a Privileges Action or Conducting Peer Review: A Practical Checklist
- Filing an Inter Partes Review Petition: A Practical Checklist
- Navigating a Landmark Designation, a Section 106 Review, or a Sign Permit: A Practical Checklist
- Negotiating or Reviewing an Employment Agreement: A Practical Checklist
- Responding to a Termination and Reviewing a Severance Agreement: A Practical Checklist
- Reviewing a Commercial Lease: A Practical Checklist
- Reviewing a Franchise Disclosure Document: A Practical Checklist
- Reviewing a Software License Agreement: A Practical Checklist