Article · Construction
The Schedule Is the Evidence: How Construction Delay Claims Are Actually Won and Lost
41 U.S.C. § 7101
- Type
- Article
- Jurisdiction
- National
- Date
- 2025-10-18
- Topic
- Construction
A contractor and an owner can agree on every fact about a project — what happened, when, and why — and still disagree entirely about whether the project was delayed. The reason is that delay is not measured against the calendar but against a network of activities in which only some paths matter, and the party who controls the schedule controls the analysis. This article explains why the critical path is the unit of measurement, what makes a delay excusable, compensable, or neither, and how concurrency usually leaves both parties with nothing. It then covers acceleration and its constructive variant, the notice provisions that defeat meritorious claims, the no-damages-for-delay clause and its exceptions, disruption claims that are distinct from delay, and the damages methods courts actually accept.
The full text of this document is available to Executive subscribers and above. See plans.