Statute · United States Code

33 U.S.C. § 2315b — Transparency and accountability in cost sharing for water resources development projects

33 U.S.C. § 2315b

Type
Statute
Source
United States Code
Jurisdiction
Federal
Date
2025-01-06
Topic
bankruptcy

In this section, the term "balance sheet" means a document that describes— (1) the funds provided by each Federal and non-Federal interest for a water resources development project; and (2) the status of those funds. Each district of the Corps of Engineers shall, using the authority of the Secretary under section 2315 of this title— (1) maintain a balance sheet for each water resources development project carried out by the Secretary for which a non-Federal cost share is required; and (2) on request of a non-Federal interest that provided funds for the project, provide to the non-Federal interest a copy of the balance sheet. In the case of a water resources development project carried out by the Secretary that is completed at a cost less than the estimated cost, the Secretary shall transfer any excess non-Federal funds to the non-Federal interest in accordance with the cost-share requirement applicable to the project.

Citator

33 U.S.C. § 2315b — Transparency and accountability in cost sharing for water resources development projects is in force in the current edition of the Code, and nothing recorded condemns it.

In this section, the term "balance sheet" means a document that describes— (1) the funds provided by each Federal and non-Federal interest for a water resources development project; and (2) the status of those funds. Each district of the Corps of Engineers shall, using the authority of the Secretary under section 2315 of this title— (1) maintain a balance sheet for each water resources development project carried out by the Secretary for which a non-Federal cost share is required; and (2) on request of a non-Federal interest that provided funds for the project, provide to the non-Federal interest a copy of the balance sheet. In the case of a water resources development project carried out by the Secretary that is completed at a cost less than the estimated cost, the Secretary shall transfer any excess non-Federal funds to the non-Federal interest in accordance with the cost-share requirement applicable to the project.