Statute · United States Code
10 U.S.C. § 6274 — General plant projects
10 U.S.C. § 6274
- Type
- Statute
- Source
- United States Code
- Jurisdiction
- Federal
- Date
- 2026-10-22
Plant or construction projects for which amounts are made available under this and subsequent appropriation Acts 1 with a current estimated cost of less than $10,000,000 are considered for purposes of section 6273 as a plant project for which the approved total estimated cost does not exceed the minor construction threshold and for purposes of section 6275 as a construction project with a current estimated cost of less than a minor construction threshold.
Citator
10 U.S.C. § 6274 — General plant projects is in force in the current edition of the Code, and nothing recorded condemns it.
Plant or construction projects for which amounts are made available under this and subsequent appropriation Acts 1 with a current estimated cost of less than $10,000,000 are considered for purposes of section 6273 as a plant project for which the approved total estimated cost does not exceed the minor construction threshold and for purposes of section 6275 as a construction project with a current estimated cost of less than a minor construction threshold.