Cal. Water Code § 85089 — EARLY ACTIONS

Cal. Water Code § 85089

Type
Statute
Source
California Water Code
Jurisdiction
California
Date
2010-02-03
Current through
Nov 2, 2026 (California Legislative Counsel)

Construction of a new Delta conveyance facility shall not be initiated until the persons or entities that contract to receive water from the State Water Project and the federal Central Valley Project or a joint powers authority representing those entities have made arrangements or entered into…

Citator

Cal. Water Code § 85089 — EARLY ACTIONS is in force in the current edition of the Code, and nothing recorded condemns it.

Construction of a new Delta conveyance facility shall not be initiated until the persons or entities that contract to receive water from the State Water Project and the federal Central Valley Project or a joint powers authority representing those entities have made arrangements or entered into contracts to pay for both of the following:

(a) The costs of the environmental review, planning, design, construction, and mitigation, including mitigation required pursuant to Division 13 (commencing with Section 21000 of the Public Resources Code), required for the construction, operation, and maintenance of any new Delta water conveyance facility.

(b) Full mitigation of property tax or assessments levied by local governments or special districts for land used in the construction, location, mitigation, or operation of new Delta conveyance facilities.