Statute · California Water Code

Cal. Water Code § 1491 — Priority of Applications for Hydroelectric Power

Cal. Water Code § 1491

Type
Statute
Source
California Water Code
Jurisdiction
California
Current through
Nov 2, 2026 (California Legislative Counsel)

Applications for hydroelectric powerplants with a generating capacity not to exceed five megawatts, which do not impound water during times of high waterflow to be used to generate power during times of low waterflow, and which will not have any significant adverse environmental impacts shall…

Citator

Cal. Water Code § 1491 — Priority of Applications for Hydroelectric Power is in force in the current edition of the Code, and nothing recorded condemns it.

Applications for hydroelectric powerplants with a generating capacity not to exceed five megawatts, which do not impound water during times of high waterflow to be used to generate power during times of low waterflow, and which will not have any significant adverse environmental impacts shall receive expedited processing by the board. The applicant shall not be required to show a need for the power that will be generated by the plant unless protests are filed against the project that are not resolved.