Any electrical corporation serving agricultural customers that have multiple electric meters shall conduct research based on a statistically valid sample of those customers and meters to determine the typical simultaneous peak load of those customers. The results of the research shall be…

Citator

Cal. Pub. Util. Code § 374.5 — Requirements for the Public Utilities Commission is in force in the current edition of the Code, and nothing recorded condemns it.

Any electrical corporation serving agricultural customers that have multiple electric meters shall conduct research based on a statistically valid sample of those customers and meters to determine the typical simultaneous peak load of those customers. The results of the research shall be reported to the customers and the commission not later than July 1, 2001. The commission shall consider the research results in setting future electric distribution rates for those customers.