Statute · California Public Resources Code

Cal. Pub. Res. Code § 3907 — Manner of Locating Mining Claims, Tunnel Rights, and Millsites

Cal. Pub. Res. Code § 3907

Type
Statute
Source
California Public Resources Code
Jurisdiction
California
Current through
Nov 2, 2026 (California Legislative Counsel)

The boundary lines of the tunnel shall be established by conspicuous and substantial monuments placed along the lines on the surface at an interval of not more than 600 feet from the face or point of commencement of the tunnel to the terminus of 3,000 feet therefrom.

Citator

Cal. Pub. Res. Code § 3907 — Manner of Locating Mining Claims, Tunnel Rights, and Millsites is in force in the current edition of the Code, and nothing recorded condemns it.

The boundary lines of the tunnel shall be established by conspicuous and substantial monuments placed along the lines on the surface at an interval of not more than 600 feet from the face or point of commencement of the tunnel to the terminus of 3,000 feet therefrom.