Statute · California Public Resources Code

Cal. Pub. Res. Code § 2727.1 — Definitions

Cal. Pub. Res. Code § 2727.1

Type
Statute
Source
California Public Resources Code
Jurisdiction
California
Date
2012-01-01
Current through
Nov 2, 2026 (California Legislative Counsel)

“Idle” means that an operator of a surface mining operation has curtailed production at the surface mining operation, with the intent to resume the surface mining operation at a future date, for a period of one year or more by more than 90 percent of its maximum annual mineral production within…

Citator

Cal. Pub. Res. Code § 2727.1 — Definitions is in force in the current edition of the Code, and nothing recorded condemns it.

“Idle” means that an operator of a surface mining operation has curtailed production at the surface mining operation, with the intent to resume the surface mining operation at a future date, for a period of one year or more by more than 90 percent of its maximum annual mineral production within any of the last five years during which an interim management plan has not been approved.