Opinion · Supreme Court of the United States
Sunray Mid-Continent Oil Co. v. Federal Power Commission
4 L. Ed. 2d 1623
- Type
- Opinion
- Court
- Supreme Court of the United States
- Jurisdiction
- Federal
- Date
- 1960-06-27
- Topic
- general
explaining that an independent natural gas producer who obtains a certificate of public convenience and necessity under the NGA and agrees to place its gas in interstate commerce must obtain FERC’s approval in order to withdraw that gas supply from interstate commerce | applying § 19(b)’s requirement that all issues submitted for judicial review must be raised before the Commission to refuse to address an argument that the Commission’s order might violate the Natural Gas Act and thereby impermissibly extend its regulatory jurisdiction | applying § 19(b)'s requirement that all issues submitted for judicial review must be raised before the Commission to refuse to address an argument that the Commission's order might violate the Natural Gas Act and thereby impermissibly extend its regulatory jurisdiction | "[T]he primary aim of the [NGA is] to protect consumers against exploitation at the hands of natural gas companies." (quotations omitted) | “[T]he primary aim of the [NGA is] to protect consumers against exploitation at the hands of natural gas companies.” (quotations omitted) | FPC may issue certificate of unlimited duration because Natural Gas Act seeks to provide “permanent . . . bond of protection” to consumers | Section 7(b) of the Act “regulates the abandonment by natural-gas companies of their facilities and services subject to the jurisdiction of the Commission.” | “The obligation that petitioner will be under after the contract term will not be one imposed by contract but by the Act.” | “once want of power to do this directly were established, the existence of power to achieve the same end indirectly through the conditioning power might well be doubted” | referring to "great economic power of the pipeline companies" | referring to “great economic power of the pipeline companies”
Citator
- Cited by
- 87 opinions
delivered the opinion of the Court.
This case presents an important question under the Natural Gas Act.1 This question, central to the case, is: When a company, proposing to make, under contract, jurisdictional sales2 of natural gas in interstate commerce,
Petitioner, Sunray Mid-Continent Oil Company, an independent producer of natural gas, entered into a contract with United Gas Pipeline Company, an interstate transmission company. The contract covered considerable acreage owned by, or under mineral lease to, petitioner in Vermilion and Lafayette Parishes, Louisiana, in and about what is called the Ridge field. Under it, United agreed to take an annual amount of gas from petitioner equivalent to 4.5625 per cent of petitioner’s gas reserves in the area covered by the agreement;3 and United had the right, in addition, to call for any amount up to 150 per cent of the amount it had annually agreed to take. The term of the agreement was 20 years. The initial price provided was 20.5 cents per thousand cubic feet (Mcf.); and the price was to increase one cent per Mcf. every five years.4
Section 7 (c) of the Natural Gas Act provides that “no natural-gas company . . . shall engage in the transportation or sale of natural gas, subject to the jurisdiction of the Commission . . . unless there is in force with respect to such natural-gas company a certificate of public con
Petitioner’s application for the certificate contained the request that the certificate sought “provide for its own expiration on the expiration of the . . . contract term so as to authorize Applicant to cease the delivery and sale of gas thereunder at that time.” The Commission, upholding its examiner’s recommendations, rejected the contentions of petitioner that there should be issued to cover the contract only a certificate limited to the term of the contract itself, and tendered it a certificate without time limitation.6 19 F. P. C. 618. Petitioner applied for a rehearing of the Commission’s order. Basic to this application was the contention that “The Commission is without authority to issue a certificate to an applicant authorizing more than the whole or some part of the sale covered by the application for certificate of public convenience and necessity . . . .” The Commission denied the rehearing application. 19 F. P. C. 1107.
The practical reasons behind petitioner’s superficially self-abnegating desire to have a limited rather than an unlimited authorization from the Commission are obvious from a study of the Natural Gas Act’s provisions. Obvious also is the damaging effect that acceptance of petitioner’s central contention would have upon the policies of the Act.
I.
Section 7 (b) of the Natural Gas Act regulates the abandonment by natural-gas companies of their facilities and services subject to the jurisdiction of the Commission.8 The section follows a common pattern in federal
If petitioner’s contentions, as to the want of authority in the Commission to grant a permanent certificate where one of limited duration has been sought for, were to be sustained, the way would be clear for every independent producer of natural gas to seek certification only for the limited period of its initial contract with the transmission company, and thus automatically be free at a future date, untrammeled by Commission regulation, to reassess whether it desired to continue serving the interstate market. And contracts — as did the 1947 contract in the companion case to the one at bar, Sun Oil Co. v. Federal Power Comm’n, post, p. 170 — might provide for termination in the event of a rate reduction by the Commission. Petitioner’s theory, by tying the term of the certificate to the contract, would mean that such a reduction of rates would under those circumstances enable the producer to cease supplying gas, without obligation to justify its cessa
The consequences of petitioner’s argument do not stop there. The identical provisions of the Natural Gas Act. regulate pipeline companies as well as independent producers. If producers can insist in their certificates on the inclusion of a provision relieving them in advance from their obligation to continue the supply of gas, as of a date certain, pipeline companies — whose dealings with local distributing companies generally also take the form of a “sale” of gas to them — could insist on a similar provision. If an individual producer were thus left free to discontinue his supply, the transmission company would be forced to find a supplier of gas elsewhere, and make connection with him, to continue its service; and the consumer ultimately would pay the bill for the rearrangement. If the pipeline company were left free to cease its service to the local distribution company, a local economy which had grown dependent on natural gas as a fuel would be at its mercy. And this, though the primary practical problem that led to the passage of the Act was the great economic power of the pipeline companies as compared with that of communities seeking natural gas service. See Federal Power Comm’n v. Hope Natural Gas Co., 320 U. S. 591, 610.
And there are practical consequences, related to rate control, which are even more concrete. The companion case, Sun Oil Co. v. Federal Power Comm’n, post, p. 170, illustrates them. If petitioner’s certificate of public convenience must expire with its first contract with United, service after then — under a new contract or otherwise— will require a new certificate. And under that certificate, petitioner may file, pursuant to § 4 (c) of the Act,10 its
Clearly, the rate change provisions of §§ 4 (d) and 4 (e), rather than the “initial rate” provisions of § 4 (c), are better tailored to the situation that exists when an initial contract of sale of natural gas terminates, and the supply of gas continues, whether under a new contract or without one. When a producer commences interstate sales from a particular field, or when an interstate transmission company commences sales to a local distributing company, there are by definition no existing rates, and accordingly the protective provisions of §§ 4 (d) and (e), which are bottomed on delaying the effectiveness of, and suspending, changes, are not relevant. But of course this is not the case where one sales contract expires and service continues; in this situation, where a rate change is proposed, the protective provisions fit as well as they do in the case of a rate change made pursuant to a contract, during its term.
Thus it is apparent that petitioner’s position would enable it to make what in practical effect would be rate
This Court declared as early as the Hope Natural Gas case that the primary aim of the Natural Gas Act was “to protect consumers against exploitation at the hands of natural gas companies.” 320 U. S. 591, 610. We reiterated that declaration last Term in Cateo, and observed that “The Act was so framed as to afford consumers a complete, permanent and effective bond of protection from excessive rates and charges.” 360 U. S., at 388. Against the backdrop of the practical consequences of the petitioner’s claim and the purposes of the Act, we look to the details of its argument that the Commission is limited, in granting its certificate of public convenience and necessity, to a term certificate of the duration petitioner has proposed.
First. Petitioner’s argument is based primarily on its construction of § 7 (e) of the Act. That section provides
The argument seems to us unpersuasive even on the face of the statutory language. It depends in the first instance upon freighting the phrase “the whole or any part,” obviously intended to give the Commission power to grant less than the whole of an application, with a
Furthermore, within § 7 (e) itself, there is found the further requirement to which petitioner itself points— that with respect to an application for a certificate of any nature, a two-part finding must be made: that the applicant is willing and able “to do the acts and to perform the service proposed.” Thus, it is evident that all the matters for which a certificate is required — the construction of facilities or their extension, as well as the making of jurisdictional sales — must be justified in terms of a “service” to which they relate. Accordingly, § 7 (e)
Second. Once we pass beyond parsing the Act to a consideration of its purpose, and of the practice under it, the construction we have given it becomes inescapable. We have outlined the serious consequences for the regulatory scheme that acceptance of the petitioner’s argument would entail. These consequences cannot readily be averted by other means suggested by the Act.
It is urged that if it is in the public interest to award only an unlimited certificate, the Commission might attain this end by refusing all applications for a limited one, intimating that an unlimited application would be favorably regarded. But the action of the Commission in refusing the certificate as originally applied for would
The Commission’s practice supports its authority here in the terms of § 7 (e). It has long drawn a distinction between the underlying service to the public a natural gas company performs and the specific manifestation — the contractual relationship — which that service takes at a given moment. For example, an independent producer may file as its rate schedule its contract of sale with a
Further, the Power Commission has from an early date taken the view that there is a continuing obligation to perform “service” imposed by the Act which outlasts the term of a seller’s original contract of sale. As early as 1942 it held that an abandonment of service after the expiry of such a. contract had to have Commission approval under § 7 (b). United Gas Pipe Line Co.,
Third. But against these considerations, it is urged that United Gas Pipe Line Co. v. Mobile Gas Service Corp., 350 U. S. 332, establishes dominant factors which impel one to the construction petitioner would put on the Act. Petitioner claims that Mobile establishes a principle that the Act (unlike many other regulatory schemes) 21 in general preserves the integrity of private contracts, and that the judgment below is in conflict with that principle.
The petitioner states accurately enough the principle that Mobile establishes. See 350 U. S., at 338, 344. But the conclusion petitioner asserts does not follow. In Mobile, this Court held that where a seller of gas had entered into a contract for the sale, it could not, by virtue of the provision in § 4 for rate changes, file an increase in rates that violated the terms of the contract. This was because the scheme of the Act was one which built the regulatory system on a foundation of private contracts.
It is apparent that the Commission’s order in no way violates the integrity of petitioner’s contract with United. During its term, both parties are bound by it to the same extent as any members of this regulated industry. When it expires, petitioner, to be sure, will be under an obligation to continue to deliver gas to United on the latter’s request unless it can justify an abandonment before the Commission; but we do not see how this in any way disturbs the integrity of the contract during its term. The. obligation that petitioner will be under after the contract term will not be one imposed by contract but by the Act. It will be free then, as it was not free during the contract term under the contract here in question, to make rate changes under § 4 without United’s consent. It is said that petitioner will be in a position of inequality, because it must supply gas then to United without a corresponding obligation on United to take it. But United, subject to the Act in its sales to local distributors, has its obligations too; and if in fulfilling them it desires to have a continuing supply of gas with the stability of price protection which a contract furnishes under Mobile, it may be discovered that each side has its bargaining strength. In any event, we do not see how the prospect of this situation after the term of petitioner’s contract in any way impairs the integrity of any contract. Mobile is thus simply beside the point.
The short of the matter is that Mobile recognized that there were two sources of price and supply stability inherent in the regulatory system established by the Natural Gas Act — the provisions of private contracts and the public regulatory power. See 350 U. S., at 344. Petitioner now urges an application of that decision that could
II.
Once the power of the Commission to issue the certificate without time limitation is established, the other objections of the petitioner fall readily. It is contended that the Commission’s order, by requiring the petitioner to supply gas beyond the term of its contract, may, by requiring petitioner to produce more gas than it has contemplated, offend the provision of § 1 (b) of the Act that the Act does not apply “to the production or gath
Other objections seem primarily directed to the point that the Commission imposed the burden of proof on the petitioner to show that the certificate should be limited, in the public interest, rather than itself taking on the burden of supporting its issuance of an unlimited certificate. There is no contention that the Commission was again indulging in the erroneous notion that it had no power to issue a limited certificate. Cf. Sunray Mid-Continent Oil Co. v. Federal Power Comm’n, 239 F. 2d 97, reversed on other grounds, 353 U. S. 944. This procedural formulation seems to us well within the Commission’s discretion as an implementation of the Act’s protective provisions which we have discussed. And, though much urged by petitioner, the fact that the Commission has certificated pipeline operations despite their showing of gas resources of a shorter duration than petitioner’s contract term is not inconsistent with the Commission’s
Finally it is suggested that for various reasons which petitioner claims to be related to the public interest, it would be more advantageous if gas producers were given a free hand, after the completion of each contract, to determine for themselves whether they should continue to serve the interstate market. These considerations were not urged before the Commission, and hence we are not called upon to decide whether they would compel a different approach by the Commission to the question of time limitations in certificates, or even whether, in the light of the Act’s provisions — particularly the policy expressed in § 7 (b) — it would be proper for it so to rely on them. There is no contention made that petitioner demonstrated any specific circumstances in its own case indicating that, despite the Commission’s general policy, the public convenience and necessity warranted a limited certificate for it.
Affirmed.
52 Stat. 821, as amended, 15 U. S. C. §§ 717-717w.
Section 1 (b) of the Act provides that “The provisions of this Act shall apply to the transportation of natural gas in interstate commerce, to the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use, and to natural-gas companies engaged in such transportation or sale, but shall not apply to any other transportation or
The amount of the reserves was subject to redetermination during the term of the contract pursuant to its Article IV, but only prospective effect would be given the redeterminations.
Article IX of the contract also provided for adjustment of these prices, by way of upward or downward escalation, in accordance with a price index of the Department of Labor.
See note 2, supra.
The Commission reached this conclusion without dissent. There was one dissent, by Commissioner Connole, from the issuance of the certificate, but only insofar as the Commission failed to attach a rate condition for which the Commission staff had contended. This aspect of the case was not brought before the court below for review in these proceedings.
Of course the economics of the industry might preclude an unyielding assumption of such a position. See 360 U. S., at 394.
The text of the section provides: “No natural-gas company shall abandon all or any portion of its facilities subject to the jurisdiction of the Commission, or any service rendered by means of such facilities, without the permission and approval of the Commission first had and obtained, after due hearing, and a finding by the Commission that the available supply of natural gas is depleted to the extent that the continuance of service is unwarranted, or that the present or future public convenience or necessity permit such abandonment.” 52 Stat. 824, 15 U. S. C. §717f (b).
See § 1 (18) of the Interstate Commerce Act, as added by the Transportation Act of 1920, 41 Stat. 477, 49 U. S. C. § 1 (18) ; § 214 (a) of the Communications Act of 1934, as amended by the Act of March 6, 1943, 57 Stat. 11, 47 U. S. C. § 214 (a).
“Under such rules and regulations as the Commission may prescribe, every natural-gas company shall file with the Commission . . . schedules showing all rates and charges for any transportation or sale
In pertinent part, § 5 (a) of the Act provides: “Whenever the Commission, after a hearing had upon its own motion or upon complaint of any State, municipality, State commission, or gas distributing company, shall find that any rate, charge, or classification demanded, observed, charged, or collected by any natural-gas company in connection with any transportation or sale of natural gas, subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust', unreasonable, unduly discriminatory, or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order ...” 52 Stat. 823, 15 U. S. C. § 717d (a).
“Unless the Commission otherwise orders, no change shall be made by any natural-gas company in any such rate, charge, classification or service, or in any rule, regulation, or contract relating thereto, except after thirty days’ notice to the Commission and to the public. Such notice shall be given by filing with the Commission and keeping open for public inspection new schedules stating plainly the change or changes to be made in the schedule or schedules then in force and the time when the change or changes will go into effect. . . .” 52 Stat. 823, 15 U. S. C. § 717c (d).
“Whenever any such new schedule is filed the Commission shall have authority, either upon complaint of any State, municipality, or State commission, or upon its own initiative without complaint, at once, and if it so orders, without answer or formal pleading by the natural-gas company, but upon reasonable notice, to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon, the Commission, upon filing with such schedules and delivering to the natural-gas company affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect: Provided, That the Commission shall not have authority to suspend the rate, charge, classification, or service for the sale of natural gas for resale for industrial use only; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of the suspension period, on motion of the natural-gas company making the filing, the proposed change of rate, charge, classification, or service shall go into effect. Where increased rates or charges are thus made effective, the Commission may, by order, require the natural-gas company to furnish a bond, to be approved by the Commission, to refund any amounts ordered by the Commission, to keep
“Except in the cases governed by the provisos contained in subsection (c) of this section, a certificate shall be issued to any qualified applicant therefor, authorizing the whole or any part of the operation, sale, service, construction, extension, or acquisition covered by the application, if it is found that the applicant is able and willing properly to do the acts and to perform the service proposed and to conform to the provisions of the Act and the requirements, rules, and regulations of the Commission thereunder, and that the proposed service, sale, operation, construction, extension, or acquisition, to the extent authorized by the certificate, is or will be required by the present or future public convenience and necessity; otherwise such application shall be denied. The Commission shall have the power to attach to the issuance of the certificate and to the exercise of the rights granted thereunder such reasonable terms and conditions as the public convenience and necessity may require.” Added by the Act of February 7, 1942, 56 Stat. 84, 15 U. S. C. § 717f (e).
"No natural-gas company or person which will be a natural-gas company upon completion of any proposed construction or extension shall engage in the transportation or sale of natural gas, subject to the jurisdiction of the Commission, or undertake the construction or extension of any facilities therefor, or acquire or operate any such facilities or extensions thereof, unless there is in force with respect to such natural-gas company a certificate of public convenience and necessity issued by the Commission authorizing such acts or operations: Provided, however, That if any such natural-gas company or predecessor in interest was bona fide engaged in transportation or sale of natural gas, subject to the jurisdiction of the Commission, on the effective date of this amendatory Act, over the route or routes or within the area for which application is made and has so operated since that time, the Commission shall issue such certificate without requiring further proof that public convenience and necessity will be served by such operation, and without further proceedings, if application for such certificate is made to the Commission within ninety days after February 7, 1942. Pending the determination of any such application, the continuance of such operation shall be lawful.
“In all other cases the Commission shall set the matter for hearing and shall give such reasonable notice of the hearing thereon to all interested persons as in its judgment may be necessary under rules and regulations to be prescribed by the Commission; and the application shall be decided in accordance with the procedure provided
Not only does § 4 (c), note 10, supra, contain a reference to “services” in a context where the antecedent must be “transportation or sale,” but it recognizes that a “contract” may “affect or relate to” such services.
It will be noted that § 7 (b) does not refer to the abandonment of the continuation of sales, but rather to the abandonment of “services.” See note 8, supra. Accordingly, if petitioner was correct in saying that its contract did not involve a “service,” it would be difficult to see the applicability of the abandonment provision even during the term of the contract, when petitioner concedes it is applicable.
In fact, as to this contention, the examiner summarized the effect of petitioner’s position by saying that it amounted to a declaration that petitioner “would prefer not to be subject to regulation.” 19 F. P. C. 618, 635.
One Court of Appeals has described the granting of a permanent certificate upon an application for a limited one as a conditional certificate, but its discussion would appear to negate the inference that it meant a condition in the ordinary sense of one attached by authority of the last sentence of § 7 (e). See Sunray Mid-Continent Oil Co. v. Federal Power Comm’n, 239 F. 2d 97, 99, n. 3, reversed on other grounds, 353 U. S. 944. The Commission’s order here rested alternatively on the conditioning power, and on the ground we have supported above. 19 F. P. C., at 620. Once the power to grant a permanent certificate under the general provisions of § 7 (e) is established, resort to the conditioning power is superfluous.
Commissioners Manly, Draper, Scott, and Seavey, who signed the decision, were all on the Commission at the time of the passage of the 1938 Act.
See, e. g., Armour Packing Co. v. United States, 209 U. S. 56, 80-82.
“No objection to the order of the Commission shall be considered by the court unless such objection shall have been urged before the Commission in the application for rehearing unless there is reasonable ground for failure so to do.” Section 19 (b), 52 Stat. 831, as amended, 15 U. S. C. § 717r (b). Petitioner did not comply with this provision.
Petitioner makes an argument based on the limitations found in a proviso to §7 (a) of the Act, the Commission’s authority to require the extension of transportation facilities and the sale of gas to local distributors. 52 Stat. 824, 15 U. S. C. § 717f (a). But the Commission’s order in no way relied on § 7 (a), and accordingly this argument of petitioner must be rejected.
Primary reliance is put on Transwestern Pipeline Co., 22 F. P. C. 391, 395-396, and Trunkline Gas Co., 21 F. P. C. 704, 709, where the Commission certificated pipeline companies despite the fact that their presently established gas reserves were shown to have a deliv-erability life of about 13 years.
It might be observed that in these cases the Commission issued certificates without time limitations. Thus if the companies, failing to find new sources of gas supply, desired to abandon service because of a depletion of supply, they would have to make proof thereof before the Commission, under § 7 (b). The Commission thus, even though there may be physical problems beyond its control, kept legal control over the continuation of service by the applicants.