This checklist walks a landowner, a local government, or a developer through a transmission or pipeline project from the first survey letter to the second growing season after construction. It opens with the jurisdiction question, because whether the line carries gas or electricity determines who decides and whether federal condemnation applies. It provides survey-permission conditions worth more than a refusal, the route deviation request that succeeds more often than any other ask, and an easement term list organized so terms are negotiated before price. It supplies a valuation section covering the categories the acreage formula misses, condemnation procedure with the deposit-withdrawal trap and the rehearing requirement, a restoration and tile inspection sequence, and separate sections for local governments limited by safety preemption and for developers who want the project energized on schedule.
Responding to a Transmission or Pipeline Project on Your Land: A Practical Checklist
Energy > Transmission Lines, Pipelines, and Linear Infrastructure Siting | Published 15 December 2024 - Updated 21 October 2025 | UpLaw - uplaw.us
Part 0 — Set expectations first
☐ ⚠️ You will almost certainly not stop the project. Projects are stopped by regulators, markets, financing, or a state permit — very rarely by a landowner. ☐ What you genuinely control: ☐ the route across your property ☐ the terms of the grant ☐ the price ☐ ⚠️ All three are worth more than most owners realize, and all three are routinely surrendered in the first week by someone who thought the fight was about whether the line gets built ☐
Part 1 — Which project is this?
☐ Interstate natural gas → federal certificate under 15 U.S.C. § 717f, framework 15 U.S.C. § 717, import/export 15 U.S.C. § 717b, procedures 18 C.F.R. Part 157 ⚠️ The certificate carries FEDERAL EMINENT DOMAIN, exercisable in federal court. ☐ Interstate electric transmission → siting is a STATE function. Federal authority under 16 U.S.C. § 824 and 16 U.S.C. § 824a covers rates and service — New York v. FERC — and reliability under 16 U.S.C. § 824o; narrow backstop at 16 U.S.C. § 824p ☐ Oil or hazardous liquid → no federal certificate; state law decides whether condemnation exists at all ☐ Intrastate → state commission, state need standard, state condemnation rules ☐ Does this developer actually have eminent domain in this state? ______ ⚠️ A merchant transmission developer often does not.
Part 2 — The survey request
☐ ⚠️ A conditioned YES is usually worth more than a bare NO. You may refuse; the company can usually then get a court order — and a court order gives you nothing. ☐ Conditions to attach in a written permission: • ☐ Advance notice of each entry ☐ ☐ Landowner or escort may accompany • ☐ No tree cutting or excavation ☐ ☐ Gates closed, biosecurity respected • ☐ Restoration of any survey damage ☐ ☐ Copy of all survey data and alignment sheets delivered to the landowner • ☐ Insurance and indemnity for the entry ☐ ☐ Permission is for survey only and grants no property right ☐ Written and dated; keep a copy ☐
Part 3 — Week one, before anything is signed
☐ ⚠️ SIGN NOTHING. Nothing offered will be withdrawn for taking two weeks, whatever is said. Early-signing bonuses are priced to acquire the grant before it is read. ☐ Obtain: alignment sheets ☐ workspace layout ☐ survey ☐ the certificate or state approval, if issued ☐ ☐ Pull your own title — ⚠️ is there an existing easement, and does it already authorize this? • "a pipeline" does NOT authorize a second one; "one or more pipelines" does ______ ☐ ⚠️ PHOTOGRAPH AND VIDEO EVERYTHING NOW, WITH DATES — fences ☐ gates ☐ drives ☐ drainage ☐ crop condition ☐ structures ☐ timber ☐ wells ☐ septic ☐ The cheapest thing you will do, and it determines every later damage claim. ☐ Locate the tile map ☐ Mark wells, septic fields, buried lines, and the building envelope ☐ ☐ ⚠️ FIND THE NEIGHBORS. Route organization is the highest-return action available — it defeats the confidentiality clause, spreads the cost of counsel and an appraiser, and changes the company's calculus. It only works before people sign individually. ☐ Retain counsel experienced in condemnation ☐ and an appraiser experienced in partial takings ☐ ☐ ⚠️ Does this jurisdiction shift fees where the award exceeds the offer? ______ If so, it transforms the economics of representation — establish it at the first meeting.
Part 4 — Ask for a route change
⚠️ This is the request most likely to be granted. Companies move lines to fence rows, property boundaries, and parallel to existing corridors, because minor deviations cost little and an unopposed parcel is worth a great deal to the schedule.
☐ Overlay the proposed centerline on the property's real features — tile map ☐ wells ☐ septic ☐ building envelope ☐ access drive ☐ timber stands ☐ pasture rotation ☐ irrigation ☐ ☐ Identify the specific conflict, not a general objection ______ ☐ Propose the alternative alignment with a drawing ☐ fence line ☐ property boundary ☐ parallel to an existing corridor ☐ along the road frontage ☐ ☐ Quantify what the deviation saves you and costs them ______ ☐ Submit in writing, early, before the route is filed ☐ ☐ Also propose: narrower permanent width ☐ relocated temporary workspace ☐ different access points ☐ bored crossing rather than open cut at a specific feature ☐
Part 5 — Negotiate terms before price
⚠️ The easement is perpetual, binds every future owner, and is read by every title examiner and lender who ever looks at the property. A good price on a bad grant is a bad deal.
☐ ⚠️ ONE LINE, NOT A CORRIDOR — a single specified facility of stated diameter or voltage; additional lines, loops, or expansions prohibited absent a new agreement and new compensation ☐ The most valuable term available. "One or more pipelines" surrenders every future project at the first project's price. ☐ ⚠️ FIXED, DESCRIBED LOCATION — metes and bounds ☐ stated width ☐ recorded as-built survey after construction ☐ Never a blanket easement or a route "to be determined by grantee." ☐ Depth of cover specified ☐ greater depth in cultivated ground and at crossings ☐ restored if grade changes ☐ ☐ Restoration standards, in detail: • ☐ Topsoil segregated and replaced in order ☐ Compaction relieved to a stated depth • ☐ ⚠️ Drain tile repaired to original grade, by a TILE CONTRACTOR, warranted across several growing seasons • ☐ Rock removed ☐ Seeding specified ☐ Fences restored to prior condition ☐ Timing — no construction during planting or harvest without agreement ☐ advance notice of entry ☐ no work in wet field conditions ☐ ☐ Access — designated points only, not "over the remainder as reasonably necessary" ☐ gates closed ☐ biosecurity ☐ ☐ Damage payment schedule — multi-year crop loss ☐ livestock ☐ merchantable timber ☐ structures ☐ separate from and additional to the easement consideration ☐ ☐ Abandonment and reversion on non-use for a stated period ☐ removal or make-safe ☐ recorded release ☐ ☐ Assignment restricted or noticed ☐ Indemnity and insurance with a duty to defend ☐ ☐ Landowner's reserved uses — crossing rights ☐ compatible cultivation ☐ right to grant other utilities across the strip ☐ ☐ ⚠️ Future vegetation management standard and process ☐ In twenty years a crew arrives. Whether they may spray, cut trees outside the easement, or drive across the pasture is decided by this document alone. ☐ Mortgagee consent or subordination obtained ☐ ⚠️ Signing without it may put you in default under your own loan. ☐ Third parties addressed — farm tenant ☐ hunting lessee ☐ mineral owner ☐ existing utility grantees ☐
Part 6 — Valuation
⚠️ The offer is almost always a percentage of fee value times easement acreage. That is a convenience formula, not a measure of loss.
☐ Correct measure: value of the property taken plus damages to the remainder, proved by a before-and-after appraisal of the entire property ☐ ☐ ⚠️ What is the parcel? — contiguous tracts acquired at different times may be measured together or separately, and Murr v. Wisconsin frames that question. It can double or halve the award. ______ ☐ Categories to develop: • ☐ The easement burden as written — an easement permitting cropping is worth less than one prohibiting it • ☐ Restrictions on the remainder — structures ☐ trees ☐ ponds ☐ grade changes ☐ deep-rooted vegetation ☐ which often extend beyond the easement line • ☐ Loss of development potential — highest and best use analysis; the largest awards come from here • ☐ Division and access — irregular remnants ☐ additional equipment turns ☐ stranded acreage ☐ • ☐ ⚠️ Drainage and soil — severed tile ☐ compaction ☐ topsoil mixed into subsoil ☐ • ☐ Proximity and stigma — ⚠️ admissibility varies dramatically by state; resolve this BEFORE retaining the appraiser • ☐ Temporary damages — workspace ☐ construction-season crop loss ☐ following-season yield ☐ fences ☐ roads ☐ livestock management ☐ Prejudgment interest from the date of taking ☐ ☐ Allocate the settlement expressly among easement consideration, severance damages, and crop or timber damages ☐ ⚠️ An unallocated lump sum invites the least favorable tax characterization. Involve the accountant before signing — condemnation proceeds and involuntary conversion have their own rules.
Part 7 — The regulatory proceeding
☐ Intervene to preserve standing for judicial review ☐ ☐ ⚠️ Federal gas project: rehearing under 15 U.S.C. § 717r is required before any court may review ☐ Deadline ______ ☐ ⚠️ THE TOLLING ORDER TRAP — where rehearing is granted solely for further consideration, the certificate stays effective, condemnation may proceed, and construction may begin, while no final order exists to appeal ☐ The practical window to affect a project closes well before the legal one formally does. ☐ Environmental review — 42 U.S.C. § 4321, 42 U.S.C. § 4331, 42 U.S.C. § 4332, 18 C.F.R. Part 380 ⚠️ It is PROCEDURAL. Under Baltimore Gas & Electric Co. v. NRDC, arguing the agency weighed impacts wrongly loses. Arguing it never considered a reasonable alternative, ignored a category of effect, or segmented the project can succeed. ☐ ⚠️ THE STATE WATER QUALITY CERTIFICATION under 33 U.S.C. § 1341 is the mechanism that has actually stopped projects ☐ Runs on its own timeline, separate from the federal docket, and is routinely missed. Related permits at 33 U.S.C. § 1344; framework 33 U.S.C. § 1251; definitions 33 U.S.C. § 1362. Note that Sackett v. EPA reduced the crossings requiring federal permits — and with them the state's hook. ☐ Species consultation 16 U.S.C. § 1536, framework 16 U.S.C. § 1531 ☐ Historic properties 16 U.S.C. § 470f ☐ These more often produce route adjustments and mitigation than denials — which, if your objective is a route change, is the actual win. ☐ Federal land crossings — 43 U.S.C. § 1761 or 30 U.S.C. § 185 ☐ ☐ Scope arguments framed as statutory authorization, not disagreement with agency judgment — Loper Bright Enterprises v. Raimondo ☐
Part 8 — If condemnation is filed
☐ Answer by the deadline ______ ⚠️ Missing it forfeits the compensation case, not just the objection. ☐ Public use challenge? — foreclosed federally by Kelo v. City of New London and Berman v. Parker; ⚠️ check the STATE constitutional or statutory restriction adopted after Kelo, which in a few states reaches private pipeline companies serving a single shipper ☐ ☐ Liability is generally not contestable — a permanent easement is a per se taking under Loretto v. Teleprompter Manhattan CATV Corp., and the right to exclude is what is being removed, Kaiser Aetna v. United States ☐ ☐ Temporary invasions are compensable too — construction workspace, induced flooding, drainage change — Arkansas Game & Fish Commission v. United States ☐ ☐ Federal forum available without state exhaustion where the taker is governmental — Knick v. Township of Scott ☐ ☐ Remainder effects framed as severance damages; regulatory framework at Penn Central Transportation Co. v. New York City ☐ ☐ Immediate possession — has the company deposited an estimate and taken possession? ☐ ☐ ⚠️ BEFORE TOUCHING THE DEPOSIT: in most jurisdictions withdrawal does not waive the right to more compensation — but in some it waives the right to contest the taking, and in a few it affects interest. Check the rule. ______ ☐ Valuation track — commissioners or appraisal board ☐ jury trial de novo ☐ ⚠️ The appraisal contest is the case. The choice of appraiser matters more than the choice of lawyer. ☐ Fee and cost shifting confirmed ______
Part 9 — During and after construction
☐ Monitor daily; photograph daily ☐ ☐ Report any deviation from the easement in writing, immediately ☐ ⚠️ Silence is the element the company needs. ☐ Confirm — width respected ☐ workspace within limits ☐ access points as designated ☐ depth of cover ☐ topsoil segregated ☐ gates closed ☐ ☐ One-call obligations respected in both directions — ⚠️ you must call before you trench across the easement too ☐ ☐ As-built survey recorded ☐ ☐ Restoration inspected across at least TWO growing seasons ☐ ☐ ⚠️ Verify drain tile function in a WET season, not a dry one ☐ Off-grade tile repair damages a field permanently and invisibly until a wet spring — the most contested item in agricultural corridors. ☐ Compaction relieved; yield monitored against comparable ground ☐ ☐ Damage claims presented under the easement's schedule before resorting to litigation ☐ ☐ Weed and invasive species control performed as specified ☐
Part 10 — If you are a local government
☐ ⚠️ What you CANNOT do: safety conditions on interstate pipelines — setbacks, depth, design — are preempted by 49 U.S.C. § 60104 ☐ Framework at 49 U.S.C. § 60101, standards at 49 U.S.C. § 60102, rules at 49 C.F.R. Part 192 and 49 C.F.R. Part 195. ☐ What you CAN do: • ☐ Land use authority over aboveground facilities — compressor and pump stations, substations: setbacks ☐ screening ☐ lighting ☐ construction hours ☐ access routing ☐ noise • ☐ Road crossing, franchise, and haul agreements with restoration bonds • ☐ Floodplain and stormwater review ☐ Emergency response planning and mutual aid • ☐ Intervention in the regulatory proceeding ☐ Coordination with the state certification authority under 33 U.S.C. § 1341 ☐ Air permitting for station engines is a separate state proceeding — ⚠️ often the only one in which a non-crossed neighbor has standing ☐ ☐ Document pre-existing sound levels before construction ☐ The baseline is the whole case in any later nuisance claim. ☐ Assessment and tax base addressed early — valuation of the completed facility ☐ payment in lieu arrangements ☐ treatment of encumbered remainder parcels ☐
Part 11 — If you are the developer
☐ Route around problem parcels early ☐ ⚠️ A deviation costs a survey and a few weeks. A contested condemnation costs a year, organizes the opposition, and leaves a record that follows the project through later approvals. ☐ Offer terms, not only money — restoration standards ☐ qualified tile repair with a multi-season warranty ☐ timing restrictions ☐ a genuine single-line limitation ☐ They cost little, resolve most objections, and the landowner who gets them tells the neighbors. ☐ ⚠️ Pre-construction tile survey and repair specification ☐ The most common source of post-construction litigation, and nearly always preventable. ☐ Document pre-existing conditions as thoroughly as the landowner should ☐ ☐ Design the crossing count — crossings drive state leverage under 33 U.S.C. § 1341 ☐ ☐ Build the need record on more than affiliate precedent agreements ☐ ⚠️ After Loper Bright Enterprises v. Raimondo, a thin need showing is more vulnerable — and the vulnerability matures after the capital is committed. ☐ Confirm condemnation authority actually exists in every state on the route ☐
Part 12 — Twelve failure modes
☐ Signing in the first meeting ☐ ☐ Negotiating price and ignoring terms ☐ ☐ Accepting a blanket or undescribed easement ☐ ☐ ⚠️ Accepting "one or more" facilities ☐ ☐ Signing before the route is fixed ☐ ☐ Not organizing along the route ☐ ☐ Missing the state certification process ☐ ☐ Framing local requirements as safety regulation ☐ ☐ Withdrawing the deposit without checking the rule ☐ ☐ Skipping pre-construction documentation ☐ ☐ Ignoring drain tile ☐ ☐ Failing to allocate the settlement for tax purposes ☐
Part 13 — Existing easement on the property
☐ Pull the recorded instrument and read the granting language ☐ • ☐ "a pipeline" → does not authorize a second one • ☐ "one or more pipelines" → does • ☐ "for the transmission of electricity" → may or may not permit rebuilding at higher voltage with taller structures ______ ☐ Is the easement blanket — no described location? ☐ ⚠️ Many states hold the location becomes fixed by the facility as actually built, which converts a blanket grant into a defined one. Raise this before an expansion is constructed, not after. ☐ Is any facility outside the described width? ☐ → respond promptly and in writing; silence is the element a prescriptive claim needs ☐ ☐ Where expansion IS authorized, enforce what the grant already requires — width ☐ location ☐ restoration ☐ access ☐ damage payments ☐ structure and vegetation limits ☐ ☐ Where expansion is NOT authorized, the company needs a new agreement — ⚠️ that is a negotiation, not a notification. Return to Part 5 ☐ ☐ Check the title commitment for how the exception reads ☐ ⚠️ A blanket or undescribed easement is what a future buyer's counsel will object to, and by then the company has no obligation to cure it.
Related Documents
- The Line That Has to Cross Somebody's Land: How Transmission and Pipeline Siting Actually Works
- Linear Infrastructure Siting: A Comprehensive Guide to Certificates, Routing, Eminent Domain, Easements, and Landowner Rights
- The Route Objection, Easement Negotiation, and Condemnation Response Toolkit
- They Want Your Land: How Eminent Domain and Takings Claims Actually Work
- Eminent Domain and Takings: A Comprehensive Guide to Public Use, Just Compensation, and Inverse Condemnation
- The Eminent Domain and Just Compensation Toolkit
- Responding to a Condemnation Offer and Valuing a Taking: A Practical Checklist
- Boundaries, Easements, and Neighbor Disputes: A Comprehensive Guide to Surveys, Adverse Possession, Access, Trees, and Nuisance
- Neighbor Law: A Comprehensive Guide to Boundaries, Easements, Nuisance, and Adverse Possession
- The Boundary Survey, Easement, and Neighbor Dispute Toolkit
- Resolving a Boundary, Easement, or Tree Dispute With a Neighbor: A Practical Checklist
- Energy Law: A Comprehensive Guide to Regulation, Markets, and Project Development
- The Energy and Utilities Toolkit
- Developing a Renewable Energy Project: A Practical Checklist
- Electric Vehicles and Charging Infrastructure: A Comprehensive Guide to Right-to-Charge Laws, Utility Rules, Siting, and Consumer Protection
- Who Owns the River: How Water Rights and Wetlands Law Actually Work
- Water, Wetlands, and Conservation: A Comprehensive Guide to Rights, Permits, and Easements
- The Water Rights and Wetlands Permitting Toolkit
- Securing a Water Right, a Wetlands Permit, or a Conservation Easement: A Practical Checklist
- What You May Build and Who Decides: How Zoning Actually Constrains Property
- Zoning and Land Use: A Comprehensive Guide to Districts, Variances, Nonconforming Uses, and Appeals
- Land Use and Zoning Law: A Comprehensive Guide
- The Zoning, Variance, and Land Use Appeal Toolkit
- Securing Land Use Entitlements for a Development Project: A Practical Checklist
- The Land Use and Development Toolkit
- Environmental Contamination and Cleanup: A Comprehensive Guide to Liability, Defenses, and Cost Recovery
- The Environmental Contamination and Cost Recovery Toolkit
- The Farm Is Also a Business: How Agricultural Law Actually Works
- The Orange Sticker on the Door: How Code Enforcement Actually Works
- Code Enforcement and Municipal Citations: A Comprehensive Guide to Inspections, Notices, Hearings, Liens, and Abatement
- It Was Wet and Nobody Said So: How Premises Liability Cases Are Won and Lost
- Premises Liability: A Comprehensive Guide to Duty, Notice, Dog Bites, and Negligent Security
- Expert Witnesses and Scientific Evidence: A Comprehensive Guide to Qualification, Reliability, and Challenge
- The Expert Witness and Daubert Challenge Toolkit
- The Hazard Inside the Walls: How Lead, Mold, and Habitability Law Actually Works
- The Illness That Arrives Thirty Years Late: How Occupational Disease Claims Actually Work
- Residential Construction and Home Improvement: A Comprehensive Guide to Contracts, Change Orders, Liens, and Defects
- The Notice Before the Dark: How Utility Shutoffs Are Actually Stopped
- Utility Service, Billing, and Shutoff Protections: A Comprehensive Guide to Rights, Disputes, and Assistance
- One Case for Ten Thousand People: How Class Actions Actually Work