Opinion · Court of Appeals for the Fifth Circuit

Ondrusek v. United States Army Corps

Ondrusek v. United States Army Corps, 123 F.4th 720 (5th Cir. 2024)

Type
Opinion
Court
Court of Appeals for the Fifth Circuit
Jurisdiction
Federal
Date
2024-12-13
Topic
general

Case: 23-10892 Document: 87-1 Page: 1 Date Filed: 12/13/2024 United States Court of Appeals for the Fifth Circuit United States Court of Appeals Fifth Circuit ____________ FILED December 13, 2024 No. 23-10892 Lyle W. Cayce ____________ Clerk Timpy Ondrusek; Barbara Ann Ondrusek Wolfe, Plaintiffs—Appellants, versus United States Army Corps of Engineers; Jonathan S. Stover, District Commander, Fort Worth District, United States Army Corps of Engineers; The City of Dallas, Defendants—Appellees. ______________________________ Appeal from the United States District Court for the Northern District of Texas USDC No. 3:22-CV-1874 ______________________________ Before Higginbotham, Stewart, and Higginson, Circuit Judges. Stephen A. Higginson, Circuit Judge: The United States Army Corps of Engineers, Defendant-Appellee, partnered with the City of Dallas, Texas, also a Defendant-Appellee, on a project called the Dallas Floodway Extension (“DFE”).

Citator

UpLaw has not yet analyzed Ondrusek v. United States Army Corps. The absence of a flag is not a finding that it is good law.

Case: 23-10892      Document: 87-1     Page: 1    Date Filed: 12/13/2024




        United States Court of Appeals
             for the Fifth Circuit                            United States Court of Appeals
                                                                       Fifth Circuit

                            ____________                             FILED
                                                              December 13, 2024
                              No. 23-10892                      Lyle W. Cayce
                            ____________                             Clerk

Timpy Ondrusek; Barbara Ann Ondrusek Wolfe,

                                                    Plaintiffs—Appellants,

                                  versus

United States Army Corps of Engineers; Jonathan S.
Stover, District Commander, Fort Worth District, United States Army
Corps of Engineers; The City of Dallas,

                                        Defendants—Appellees.
               ______________________________

               Appeal from the United States District Court
                   for the Northern District of Texas
                        USDC No. 3:22-CV-1874
               ______________________________

Before Higginbotham, Stewart, and Higginson, Circuit Judges.
Stephen A. Higginson, Circuit Judge:
       The United States Army Corps of Engineers, Defendant-Appellee,
partnered with the City of Dallas, Texas, also a Defendant-Appellee, on a
project called the Dallas Floodway Extension (“DFE”). The project plan
was issued in 1999, as was an environmental impact statement (“EIS”) under
the National Environmental Policy Act, 42 U.S.C. §§ 4321–4347
(“NEPA”). The EIS was supplemented in 2003. Design and implementa-
tion are ongoing.
Case: 23-10892       Document: 87-1          Page: 2   Date Filed: 12/13/2024




                                 No. 23-10892


       Plaintiffs-Appellants Timpy Ondrusek and Barbara Ann Ondrusek
Wolfe are the owners of real property that Dallas attempted to condemn for
the DFE. They sued in federal district court for declaratory and injunctive
relief under the Administrative Procedure Act, 5 U.S.C. §§ 551–559, 701–
706 (“APA”), claiming that the Corps’ failure to prepare a supplemental en-
vironmental impact statement (“SEIS”) to account for new information,
such as flood risk updates related to climate change and changes to engineer-
ing guidance following Hurricane Katrina, violated NEPA and the Clean Wa-
ter Act, 33 U.S.C. §§ 1251–1389 (“CWA”).
       The district court determined on the pleadings that the case was not
justiciable and dismissed the claims. We REVERSE and REMAND with
respect to the Army Corps of Engineers, and AFFIRM with respect to the
City of Dallas.
                                        I.
                                     A.
       The Trinity River cuts across the City of Dallas. Several years ago,
the Corps and the City embarked on the Trinity River Corridor Project,
which was intended to assist with “flood protection, recreation,
environmental restoration, [and] economic development.” The City’s roles
included funding a portion of the project, as well as assisting with acquiring
and providing land and rights of way.
       One of the main components of the project was the DFE, which
“include[d] the implementation of a chain of wetlands, as well as two
levees—the Cadillac Heights Levee and the Lamar Levee.”               Though
originally authorized in 1965, the DFE was deactivated; it was reactivated in
1990 following a severe flood on the condition of reevaluation “due to new
environmental and economic criteria, as well as significant land use changes
within the study area.”     As a result, the Corps published a General




                                        2
Case: 23-10892        Document: 87-1       Page: 3   Date Filed: 12/13/2024




                                 No. 23-10892


Reevaluation Report and Integrated EIS in 1999. The Corps approved the
plans described in the 1999 EIS in December 1999.
         Environmental associations sued the Corps over the plan. See Tex.
Comm. on Nat. Res. v. Van Winkle, 
197 F. Supp. 2d 586
, 591 n.2, 595 (N.D.
Tex. 2002). It was determined that the Corps failed to address certain
cumulative impacts as required under 
40 C.F.R. § 1508
. 
Id.
 at 618–19. The
district court remanded to the Corps and enjoined construction. 
Id. at 622
.
The Corps issued a final SEIS in 2003. The district court dissolved the
injunction, and the project resumed. See Tex. Comm. on Nat. Res. v. Van
Winkle, No. 4:00-CV-384-Y, 
2004 WL 980392
, at *4 (N.D. Tex. May 5,
2004).
         It became clear that the DFE would intersect with the Appellants’
property. In September 2021, the City of Dallas sent a letter informing the
Appellants that a portion of their vacant lot was needed for the Cadillac
Heights Levee. The City offered $497,034 in compensation, but agreement
was not reached. The City initiated condemnation proceedings.
                                      B.
         In August 2022, Ondrusek and Wolfe filed suit against the Corps and
the City of Dallas for declaratory and injunctive relief under the APA,
claiming that the Corps’ ongoing work on the DFE failed to comply with
NEPA and the CWA. With respect to NEPA, the plaintiffs alleged that the
Corps was required to prepare another SEIS to account for additional
information, including changes to engineering guidance following Hurricane
Katrina. They further alleged that the Corps did not complete the analysis
required under 
40 C.F.R. § 230
.11—a regulation implementing § 404 of the
CWA—including an investigation of “secondary effects” on the Trinity
River ecosystem.




                                       3
Case: 23-10892       Document: 87-1         Page: 4   Date Filed: 12/13/2024




                                 No. 23-10892


       These failures, the plaintiffs alleged, caused “a serious risk that
environmental impacts will be overlooked,” which would harm them because
their property had a “geographical nexus to the project,” “such that they can
expect to suffer the environmental consequences the project may have.”
The alleged environmental consequences included threats of “unnecessary
flooding, damage to surface and subsurface soils, surface and groundwater,
and surrounding land contiguous to the completed DFE Project.” The
plaintiffs requested a remand to the Corps for additional factfinding and
preparation of an SEIS, and a halt to construction in the interim.
       The plaintiffs moved for preliminary relief. The district court denied
the motion on the ground that the plaintiffs had not shown Article III
standing, and dismissed the complaint without prejudice. The plaintiffs then
filed an amended complaint, alleging additional theories of injury including
“migration of the contaminants of concern” from flooding and thus
“potential worsening of the environmental condition at the Property.” They
again sought preliminary relief. Again, the district court concluded that the
case was not justiciable, noting that the levee design phase was “only 35
percent complete.” The district court dismissed the case as unripe, without
prejudice but denying leave to amend. The plaintiffs timely appealed.
                                      II.
       “Questions of subject matter jurisdiction are reviewed de novo.”
Harrison Cnty. v. U.S. Army Corps of Eng’rs, 
63 F.4th 458, 462
 (5th Cir.
2023). To assess justiciability “on the basis of the pleadings, we must accept
as true all material allegations of the complaint and . . . construe the
complaint in favor of the complaining party.” La. Fair Hous. Action Ctr., Inc.
v. Azalea Garden Props., L.L.C., 
82 F.4th 345, 350
 (5th Cir. 2023) (quoting
Ass’n of Am. Physicians & Surgeons, Inc. v. Tex. Med. Bd., 
627 F.3d 547, 550
(5th Cir. 2010)). “[A] suit will not be dismissed for lack of standing if there




                                      4
Case: 23-10892          Document: 87-1       Page: 5   Date Filed: 12/13/2024




                                  No. 23-10892


are sufficient ‘allegations of fact’—not proof—in the complaint or
supporting affidavits.” Gwaltney of Smithfield, Ltd. v. Chesapeake Bay Found.,
Inc., 
484 U.S. 49, 65
 (1987) (quoting Warth v. Seldin, 
422 U.S. 490, 501
(1975)).
                                      III.
       The issues are whether the claims are ripe for adjudication, whether
the plaintiffs have standing, and whether the complaint was untimely under
the six-year statute of limitations codified at 
28 U.S.C. § 2401
(a). We
address each in turn.
                                       A.
       We start with ripeness. Article III of the Constitution limits the
jurisdiction of the federal courts to “Cases” and “Controversies.” U.S.
Const. art. III, § 2. “A case or controversy must be ripe for decision,
meaning that it must not be premature or speculative.” Shields v. Norton, 
289 F.3d 832, 835
 (5th Cir. 2002). “The ripeness doctrine is ‘drawn both from
Article III limitations on judicial power and from prudential reasons for
refusing to exercise jurisdiction.’” Nat’l Park Hosp. Ass’n v. Dep’t of Interior,
538 U.S. 803, 808
 (2003) (quoting Reno v. Catholic Social Servs., Inc., 
509 U.S. 43
, 57 n.18 (1993)).
       To evaluate ripeness, we “balance[]” “the fitness of the issues for
judicial decision” against “the hardship to the parties of withholding court
consideration.” Texas v. United States, 
497 F.3d 491, 498
 (5th Cir. 2007)
(citing Abbott Lab’ys v. Gardner, 
387 U.S. 136, 149
 (1967)). In a challenge to
agency action, we consider “whether the courts would benefit from further
factual development of the issues presented,” “whether judicial intervention
would inappropriately interfere with further administrative action,” and
“whether delayed review would cause hardship to the plaintiffs.” Coliseum
Square Ass’n, Inc. v. Jackson, 
465 F.3d 215
, 245 (5th Cir. 2006) (quoting Ohio




                                         5
Case: 23-10892        Document: 87-1        Page: 6   Date Filed: 12/13/2024




                                 No. 23-10892


Forestry Ass’n, Inc. v. Sierra Club, 
523 U.S. 726, 733
 (1998)). In a declaratory
judgment action, we consider “whether the facts alleged, under all the
circumstances, show that there is a substantial controversy, between parties
having adverse legal interests, of sufficient immediacy and reality to warrant
the issuance of a declaratory judgment.” Md. Cas. Co. v. Pac. Coal & Oil Co.,
312 U.S. 270, 273
 (1941).
       The district court determined that the case was unripe and dismissed
for lack of Article III jurisdiction. On appeal, the Appellees do not defend
the district court’s ripeness ruling and focus instead on standing, and the
Corps agreed at oral argument that the case was ripe. See Oral Argument at
19:15, Ondrusek v. U.S. Army Corps of Eng’rs, No. 23-10892 (5th Cir. June 5,
2024), https://www.ca5.uscourts.gov/OralArgRecordings/23/23-10892_6-
5-2024.mp3 [hereinafter Oral Arg.]. Nonetheless, we must satisfy ourselves
that there was original jurisdiction of the cause. See Orix Credit All., Inc. v.
Wolfe, 
212 F.3d 891, 895
 (5th Cir. 2000).
       In our view, the claims are ripe for decision. The Corps’ purported
failure to comply with its NEPA obligations presents a present controversy
that requires no “further factual development.” Coliseum Square, 465 F.3d
at 245; cf. Duke Power Co. v. Carolina Env’t Study Grp., Inc., 
438 U.S. 59
, 81–
82 (1978) (“Although it is true that no nuclear accident has yet occurred and
that such an occurrence would eliminate much of the existing scientific
uncertainty surrounding this subject, it would not, in our view, significantly
advance our ability to deal with the legal issues presented nor aid us in their
resolution.”). “[A] person with standing who is injured by a failure to
comply with the NEPA procedure may complain of that failure at the time the
failure takes place, for the claim can never get riper.” Ohio Forestry, 
523 U.S. at 737
 (emphasis added). That is because “NEPA . . . simply guarantees a
particular procedure, not a particular result.” 
Id.
 (emphases added).




                                       6
 Case: 23-10892          Document: 87-1          Page: 7       Date Filed: 12/13/2024




                                       No. 23-10892


        NEPA does not work by mandating that agencies achieve
        particular substantive environmental results. Rather, NEPA
        promotes its sweeping commitment to “prevent or eliminate
        damage to the environment and biosphere” by focusing
        Government and public attention on the environmental effects
        of proposed agency action. 
42 U.S.C. § 4321
. By so focusing
        agency attention, NEPA ensures that the agency will not act on
        incomplete information, only to regret its decision after it is too
        late to correct.

Marsh v. Or. Nat. Res. Council, 
490 U.S. 360, 371
 (1989).
        The procedural requirement at issue here is that “in certain
circumstances an EIS must be supplemented.” Norton v. S. Utah Wilderness
All., 
542 U.S. 55, 72
 (2004) [hereinafter SUWA]. This duty is implicit in
NEPA § 102(2).          Marsh, 490 U.S. at 370–71 (“Preparation of [SEIS]
statements . . . is at times necessary to satisfy the Act’s ‘action-forcing’
purpose.”); see also id. at 371 n.14. “This reading of the statute is supported
by Council on Environmental Quality (CEQ) and Corps regulations.” Id. at
372.    “[T]he CEQ’s regulations” impose “binding” duties on federal
agencies. Sierra Club v. Sigler, 
695 F.2d 957, 972
 (5th Cir. 1983). In
particular, 
40 C.F.R. § 1502.09
 “impose[s] a duty on all federal agencies to
prepare supplements to either draft or final EIS’s” when sufficiently
substantial “new circumstances or information” about environmental
impacts bear on the agency’s analysis. Marsh, 
490 U.S. at 372
 (quoting 
40 C.F.R. § 1502.9
(c) (1987)). 1 And the Corps has adopted the CEQ’s rules in

        _____________________
        1
          The 2024 revisions to the CEQ regulations further clarified that “ongoing”
action could require supplemental review. Compare Marsh, 
490 U.S. at 372
 n.16 (citing 
40 C.F.R. § 1502.9
(c) (1987)), with 
40 C.F.R. § 1502.9
(d) (2024). If the regulations had been
substantially revised over the time period implicated in this suit, we might need to parse
out applicability, since standing focuses on the time a suit is filed, Davis v. FEC, 
554 U.S. 724, 734
 (2008), ripeness focuses on “the situation now,” Reg’l Rail Reorganization Act




                                             7
 Case: 23-10892          Document: 87-1          Page: 8      Date Filed: 12/13/2024




                                       No. 23-10892


its own regulations. 
33 C.F.R. § 230.13
(b); see Marsh, 490 U.S. at 372–73, 373
n.17. Thus, “[i]f there remains ‘major Federal actio[n]’ to occur, and if the
new information is sufficient to show that the remaining action will ‘affec[t]
the quality of the human environment’ in a significant manner or to a
significant extent not already considered, a supplemental EIS must be
prepared.” 
Id. at 374
.
        In asserting that the Corps has not complied with this duty, the
plaintiffs alleged a “failure to comply with NEPA procedure” which has
already “take[n] place.” Ohio Forestry, 
523 U.S. at 737
. On their theory, the
DFE is an “ongoing ‘major Federal action’ that could require
supplementation.” SUWA, 
542 U.S. at 73
. But, they say, the Corps has
unlawfully failed to prepare the SEIS required by NEPA, CEQ regulations,
and the Corps’ own rules in the face of new information (including the
Corps’ own standards and studies) about flood planning and climate risks.
“In certain circumstances, agency inaction may be sufficiently final to make
judicial review appropriate.” Sierra Club v. Peterson, 
228 F.3d 559, 568
 (5th
Cir. 2000) (en banc); see also City of Seabrook v. Costle, 
659 F.2d 1371, 1373
(5th Cir. 1981). After all, a plaintiff who sues on a procedural right to
challenge a “failure to prepare an environmental impact statement” may
maintain a suit “even though the [major federal action] will not be completed
for many years.” Lujan v. Defs. of Wildlife, 
504 U.S. 555
, 572 n.7 (1992).
        The district court determined that any injury to the plaintiffs was
speculative. The court reasoned that “Plaintiffs have not pointed to any
specific flaws in the plans for the Levee, nor explained why they believe such
flaws would lead to inadequate flood protection”—and “[b]ecause much is

        _____________________
Cases, 
419 U.S. 102, 140
 (1974), and on the merits the claim is that the Corps has failed to
act. However, our analysis holds for any version of the regulations at issue.




                                             8
Case: 23-10892        Document: 87-1       Page: 9     Date Filed: 12/13/2024




                                  No. 23-10892


still unknown about the Levee’s design, Plaintiffs can offer only an
‘attenuated chain of inferences’ to support their claim that the Federal
Defendants’ actions put their environmental interests at risk.” See Clapper
v. Amnesty Int’l USA, 
568 U.S. 398
, 414 n.5 (2013).
       There is something to this reasoning, but at least at this point in the
proceedings we think the level of conjecture is not too great. A plaintiff’s
interest in a case cannot be “too speculative for Article III purposes.” Defs.
of Wildlife, 
504 U.S. at 564
 n.2. But this bar against speculation does not
mean that the courts are closed to claims based on potential risks of injury.
Babbitt v. United Farm Workers Nat. Union, 
442 U.S. 289, 298
 (1979); see
Spokeo, Inc. v. Robins, 
578 U.S. 330
, 341–42 (2016). This is why we have said
that in any NEPA case “the fact of actual damage . . . is somewhat
speculative”—the whole “point of the lawsuit” is “to compel a completion
of an environmental impact statement about the consequences of the
project.” Save Our Wetlands, Inc. v. Sands, 
711 F.2d 634, 640
 (5th Cir. 1983)
(emphasis omitted).      A plaintiff need only show “a risk that serious
environmental impacts will be overlooked,” Sabine River Auth. v. U.S. Dep’t
of Interior, 
951 F.2d 669
, 674 (5th Cir. 1992) (quoting City of Davis v. Coleman,
521 F.2d 661, 671
 (9th Cir. 1975)); accord Fla. Audubon Soc’y v. Bentsen, 
94 F.3d 658
, 665–66 (D.C. Cir. 1996) (en banc)—he need not present the court
with the results of “the same environmental investigation that he seeks in his
suit to compel the agency to undertake,” 
id.
 (quoting City of Davis, 
521 F.2d at 671
).
       Here, the plaintiffs have demonstrated “a sufficient geographical
nexus to the site of the challenged project [such that they can] expect [] to
suffer whatever environmental consequences the project may have.” Sabine
River Auth., 951 F.2d at 674 (quoting City of Davis, 
521 F.2d at 671
).
Moreover, the plaintiffs have explained those potential consequences at
length. The amended complaint alleges that if updated climate models and



                                       9
Case: 23-10892           Document: 87-1           Page: 10      Date Filed: 12/13/2024




                                       No. 23-10892


engineering standards are not used, the resulting deficiency in flood
protection will result in flooding of the plaintiffs’ land and migration of
contaminants. The Corps is welcome to flyspeck these assertions later on,
but at par value they state a plausible theory of a risk to the plaintiffs’
environmental interests. 2
        Judicial decision in this case would not “inappropriately interfere with
further administrative action.” Ohio Forestry, 
523 U.S. at 733
. NEPA
generally requires that the Corps consider the impacts of major actions before
concluding them. Cf. 
id.
 at 735–36. If anything, delayed review poses a
greater risk of interference by potentially forcing a reconsideration of plans
even further underway. There has been no allegation that the Corps has
reopened environmental review on its own as might imply a tentative or
contingent judicial pronouncement on conclusions soon likely to shift. Cf.
Coliseum Square, 465 F.3d at 245. Accordingly, enforcing NEPA’s mandate
now may “foster effective administration of the statute.” Texas, 
497 F.3d at 499
 (quoting Merchs. Fast Motor Lines, Inc. v. ICC, 
5 F.3d 911, 920
 (5th Cir.
1993)).
        Furthermore, delaying review would impose hardship on the
plaintiffs. The district court viewed delay as unlikely to prove prejudicial,
since “construction cannot go forward without a design.” We understand
the premise but respectfully part ways with the conclusion. We do not think
the plaintiffs must wait to ask the Corps to reassess its plans until
construction is a fait accompli.


        _____________________
        2
          “This is not to say . . . that such allegations may not be challenged.” Gwaltney of
Smithfield, 484 U.S. at 65–66. It is of course open to the Corps to controvert the allegations
and move for summary judgment on jurisdiction, or to put the plaintiffs to their burden of
proof at a hearing on the issue (should one be held) or at trial. See id. at 66.




                                             10
Case: 23-10892          Document: 87-1           Page: 11      Date Filed: 12/13/2024




                                       No. 23-10892


        Ongoing resource commitments suggest that the DFE is moving
ahead. It has been asserted that the Corps and Dallas made material changes
to the DFE after the 2003 SEIS. And an agreement between Dallas and the
Corps, as amended in 2019, required Dallas to undertake actions to
implement the DFE at the Corps’ direction and provided federal funding
from the Bipartisan Budget Act of 2018, 
Pub. L. No. 115-123, 132
 Stat. 64
(2018).
        That the Corps may be pressing ahead without full consideration of
environmental impacts, posing risks to the plaintiffs’ environmental
interests, indicates prejudice from delay.             “[B]y focusing the agency’s
attention on the environmental consequences of a proposed project, NEPA
ensures that important effects will not be overlooked or underestimated only
to be discovered after resources have been committed or the die otherwise
cast.” Robertson v. Methow Valley Citizens Council, 
490 U.S. 332, 349
 (1989).
Review is thus appropriate now, before the Rubicon has been crossed (or
subjected to dredge/fill discharges).
                                            B.
        We turn now to Article III standing. 3 To present a case or controversy
suitable for determination by a federal court, a plaintiff must “claim to have
suffered an injury that the defendant caused and the court can remedy.”
TransUnion LLC v. Ramirez, 
594 U.S. 413, 423
 (2021) (quoting Casillas v.
Madison Ave. Associates, Inc., 
926 F.3d 329, 333
 (7th Cir. 2019) (Barrett, J.)).
So “to establish standing, a plaintiff must show (i) that he suffered an injury
in fact that is concrete, particularized, and actual or imminent; (ii) that the
        _____________________
        3
         While the district court’s July 2023 order dismissed the case primarily on ripeness
grounds, the order alluded to the elements of standing. Because the parties dispute
standing, a jurisdictional issue, we choose to address it. See Lang v. French, 
154 F.3d 217
,
222 & n.28 (5th Cir. 1998).




                                            11
Case: 23-10892       Document: 87-1          Page: 12   Date Filed: 12/13/2024




                                  No. 23-10892


injury was likely caused by the defendant; and (iii) that the injury would likely
be redressed by judicial relief.” 
Id.
       “[A]n individual can enforce a procedural right in court ‘so long as
the procedures in question are designed to protect some threatened concrete
interest of his that is the ultimate basis of his standing.’” Ctr. for Biological
Diversity v. EPA, 
937 F.3d 533, 543
 (5th Cir. 2019) (quoting Defs. of Wildlife,
504 U.S. at 573
 n.8). “[D]eprivation of a procedural right without some
concrete interest that is affected by the deprivation—a procedural right in
vacuo—is insufficient to create Article III standing.” Summers v. Earth Island
Inst., 
555 U.S. 488, 496
 (2009). But “a ‘person who has been accorded a
procedural right to protect his concrete interests can assert that right without
meeting all the normal standards for redressability and immediacy.’” 
Id.
(quoting Defs. of Wildlife, 
504 U.S. at 572
 n.7). Thus, “one living adjacent to
the site for proposed construction of a federally licensed dam has standing to
challenge the licensing agency’s failure to prepare an environmental impact
statement, even though he cannot establish with any certainty that the
statement will cause the license to be withheld or altered, and even though
the dam will not be completed for many years.” Defs. of Wildlife, 
504 U.S. at 572
 n.7.
                                        i.
       The “injury in fact” requirement “is designed to limit access to the
courts to those ‘who have a direct stake in the outcome.’” Sierra Club, Lone
Star Chapter v. Cedar Point Oil Co. Inc., 
73 F.3d 546, 556
 (5th Cir. 1996)
(quoting Valley Forge Christian Coll. v. Americans United for Separation of
Church & State, Inc., 
454 U.S. 464, 473
 (1982)). “[A] ‘threatened injury’ will
satisfy the ‘injury in fact’ requirement for standing.” Citizens for Clean Air
& Clean Water in Brazoria Cnty. v. United States Dep’t of Transp., 
98 F.4th 178, 187
 (5th Cir. 2024) (quoting Cedar Point Oil, 
73 F.3d at 556
). An




                                        12
Case: 23-10892       Document: 87-1         Page: 13   Date Filed: 12/13/2024




                                  No. 23-10892


allegation that an administrative agency has “fail[ed] to satisfy a procedural
requirement,” 
id.
 (quoting Ctr. for Biological Diversity, 
937 F.3d at 542
), can
thus establish standing when the failure “threatens [a] ‘concrete interest,’”
id.
 (quoting Shrimpers & Fishermen of RGV v. Tex. Comm’n on Env’t Quality,
968 F.3d 419, 426
 (5th Cir. 2020)).
       “[E]stablished precedent” recognizes concrete injury “in the context
of animals and the environment.” La. Fair Hous. Action Ctr., 
82 F.4th at 358
n.2 (Ho, J., concurring).       Injuries to “aesthetic, conservational, and
recreational” interests can provide the requisite concrete and justiciable
stake. Sierra Club v. Morton, 
405 U.S. 727, 738
 (1972) (quoting Ass’n of Data
Processing Serv. Orgs., Inc. v. Camp, 
397 U.S. 150, 154
 (1970)). That includes
future, and thus contingent, risks to such interests. Citizens in Brazoria
Cnty., 
98 F.4th at 187
; see Spokeo, 578 U.S. at 341–42. A plaintiff who
plausibly alleges that failure to comply with NEPA presents “a risk that
serious environmental impacts will be overlooked” has thus alleged a
concrete stake in having the agency reassess its decision. Sabine River Auth.,
951 F.2d at 674 (quoting City of Davis, 
521 F.2d at 671
).
       As noted above, we do not require NEPA plaintiffs to show “actual
damage” to their interests to a certainty. Save Our Wetlands, 
711 F.2d at 640
;
see also Nat’l Infusion Ctr. Ass’n v. Becerra, 
116 F.4th 488, 503
 (5th Cir. 2024)
(“[T]he plaintiff need not ‘establish with any certainty’ that the procedural
defect ‘will cause’ harm.” (quoting Defs. of Wildlife, 
504 U.S. at 572
 n.7)).
On the contrary, the whole “point of the lawsuit” is “to compel a completion
of an environmental impact statement about the consequences of the
project.” Save Our Wetlands, 
711 F.2d at 640
.
       But at the same time, “the party seeking review must himself have
suffered an injury.” Morton, 
405 U.S. at 735
. “The relevant showing for
Article III standing is not injury to the environment but injury to the




                                       13
Case: 23-10892           Document: 87-1           Page: 14      Date Filed: 12/13/2024




                                       No. 23-10892


plaintiff.” Friends of the Earth, 528 U.S. at 169. Like one harmed by a
cotenant’s waste, however, a plaintiff can be individually injured on account
of an interest in the environment “shared by the many rather than the few.”
Morton, 
405 U.S. at 734
; see also Spokeo, 
578 U.S. at 339
 n.7.
“[E]nvironmental plaintiffs adequately allege injury in fact when they aver
that they use the affected area and are persons ‘for whom the aesthetic and
recreational values of the area will be lessened’ by the challenged activity.”
Friends of the Earth, 528 U.S. at 183 (quoting Morton, 
405 U.S. at 735
). Thus,
in a NEPA suit, a typical way of demonstrating particularized injury is for a
plaintiff to allege “a sufficient geographical nexus to the site of the challenged
project [such that they can] expect [] to suffer whatever environmental
consequences the project may have.” Sabine River Auth., 951 F.2d at 674
(quoting City of Davis, 
521 F.2d at 671
); see also, e.g., Citizens in Brazoria
Cnty., 
98 F.4th at 187
.
        That is the type of concrete and particularized risk alleged by the
plaintiffs. The plaintiffs allege that the Corps’ failure to prepare an SEIS
creates “a serious risk that environmental impacts will be overlooked.” The
plaintiffs allege they would suffer the potential environmental consequences
given the location of their property, which might include “unnecessary
flooding, damage to surface and subsurface soils, surface and groundwater,
and surrounding land contiguous to the completed DFE Project which
Plaintiffs will continue to own” as well as “migration of the contaminants of
concern” from the extra flooding and thus “potential worsening of the
environmental condition at the Property.” 4                 Flooding, subsidence, and
        _____________________
        4
           The Corps, citing Florida Audubon Society, 
94 F.3d at 669
, argues that since the
risks of flooding “already existed . . . the Corps has done nothing to increase the flood risk
on Plaintiffs’ property.” But, even assuming the relevant legal propositions, the complaint
plausibly alleges the contrary and at this stage we accept those contentions. See La. Fair
Hous. Action Ctr., 
82 F.4th at 350
 (majority opinion).




                                             14
Case: 23-10892        Document: 87-1         Page: 15   Date Filed: 12/13/2024




                                  No. 23-10892


migration of contaminants are concrete injuries to the plaintiffs’
conservational interests in the environmental state of their own property.
These injuries are particularized to the plaintiffs, who own the land. See, e.g.,
Save Our Cmty. v. EPA, 
971 F.2d 1155
, 1160–61 (5th Cir. 1992). It would have
been enough if the land in issue were merely open to the public and they
sometimes used it. See, e.g., Friends of the Earth, 528 U.S. at 183; Defs. of
Wildlife, 504 U.S. at 562–63; Morton, 
405 U.S. at 735
.
       It does not foreclose the plaintiffs’ standing that their asserted
interests involve risks that may be some distance in the future. To be sure,
“environmental interests cannot support an injury in fact unless they have
been actually harmed or imminently will be.” Ctr. for Biological Diversity, 
937 F.3d at 537
. But this rule must be understood in view of the principle that
someone “accorded a procedural right . . . can assert that right without
meeting all the normal standards for redressability and immediacy.” Defs. of
Wildlife, 
504 U.S. at 572
 n.7. Thus, while some degree of contingency is
involved in alleging injury based on the unassessed risks of agency action,
“the plaintiff need not ‘establish with any certainty’ that the procedural
defect ‘will cause’ harm.” Nat’l Infusion Ctr. Ass’n, 
116 F.4th at 503
(quoting Defs. of Wildlife, 
504 U.S. at 572
 n.7). Nor does the fact that the
DFE may not be completed for some time make this case unsuited for
adjudication. See Defs. of Wildlife, 
504 U.S. at 572
 n.7. These black-letter
propositions from note 7 of Defenders make clear that the plaintiffs plausibly
alleged injury in fact.
                                       ii.
       We now consider whether the plaintiffs sufficiently alleged traceabil-
ity and redressability. “As in all cases, standing in an EIS suit requires ade-
quate proof of causation. The conceptual difficulty with this requirement,
in this type of case, is that an adequate causal chain must contain at least




                                       15
Case: 23-10892         Document: 87-1        Page: 16   Date Filed: 12/13/2024




                                   No. 23-10892


two links: one connecting the omitted EIS to some substantive government
decision that may have been wrongly decided because of the lack of an EIS
and one connecting that substantive decision to the plaintiff’s particularized
injury.” Ctr. for Biological Diversity, 
937 F.3d at 543
 (quoting Fla. Audubon
Soc’y, 
94 F.3d at 668
). The injury is redressable by judicial review as long as
there is some prospect that “fixing the alleged procedural violation could
cause the agency to ‘change its position’ on the substantive action.” 
Id.
(quoting Sierra Club v. FERC, 
827 F.3d 59, 67
 (D.C. Cir. 2016)). That
standard is not demanding. A NEPA plaintiff need not “establish with any
certainty” that complying with NEPA will cause an agency’s decision to be
“withheld or altered.” Defs. of Wildlife, 
504 U.S. at 572
 n.7. It is enough
for a plaintiff to “show that there is a possibility that the procedural remedy
will redress his injury.” Sierra Club v. Glickman, 
156 F.3d 606, 613
 (5th Cir.
1998).
         The plaintiffs have shown sufficient traceability and redressability to
proceed past the pleading stage. As described above, the plaintiffs alleged
that the Corps’ failure to account for updated flood, climate, and engineer-
ing information could lead to a deficient levee design, risking the particular-
ized injury of environmental harm to their land—because, for example, the
levees might not be tall enough to account for subsidence. But, they say,
“[i]t is certainly possible” that “a supplemental EIS would cause the Corps
to decide not to proceed under its current plans, [since they] are based on
outdated design and engineering criteria.” Thus the “alleged procedural
failures” may “lead to the construction of a project, causing [plaintiffs’] in-
juries.” Citizens in Brazoria Cnty., 
98 F.4th at 188
 n.5. And preparing an
SEIS “may at least force the Government to reconsider its decision, which
satisfies the redressability element.” 
Id.
 So the plaintiffs properly alleged
Article III standing for their claims against the Army Corps of Engineers.




                                        16
Case: 23-10892        Document: 87-1         Page: 17   Date Filed: 12/13/2024




                                  No. 23-10892


                                       C.
       The parties also dispute statutory standing. “[A] statutory cause of
action extends only to plaintiffs whose interests ‘fall within the zone of
interests protected by the law invoked.’” Lexmark Int’l, Inc. v. Static Control
Components, Inc., 
572 U.S. 118, 129
 (2014) (quoting Allen v. Wright, 
468 U.S. 737, 751
 (1984)). “[I]n the APA context, . . . the test is not ‘especially
demanding.’”      
Id.
 at 130 (quoting Match-E-Be-Nash-She-Wish Band of
Pottawatomi Indians v. Patchak, 
567 U.S. 118, 130
 (2012)). We assume
without deciding that similar principles as in our NEPA cases, see, e.g., Sabine
River Auth., 951 F.2d at 675–76, apply to APA claims for violation of the
CWA, noting that the amended complaint does not substantially rely on the
CWA’s citizen-suit provision, 
33 U.S.C. § 1365
.
       “Unlike constitutional standing, prudential standing arguments may
be waived.” Bd. of Mississippi Levee Com’rs v. EPA, 
674 F.3d 409, 417
 (5th
Cir. 2012); see, e.g., Chavez v. Plan Benefit Servs., Inc., 
108 F.4th 297
, 314 n.5
(5th Cir. 2024). The Corps admits that allegations such as “unnecessary
flooding, damage to surface and subsurface soils, surface and groundwater,
and surrounding land contiguous to the completed DFE Project which
Plaintiffs will continue to own,” as well as “migration of . . . contaminants,”
generally fall within the zones of interests protected by the statutory
provisions at issue. The Corps argues only that “protecting . . . property
from eminent domain” falls outside the zones. See Gunpowder Riverkeeper v.
FERC, 
807 F.3d 267, 273
 (D.C. Cir. 2015). But as described in the next
section, on appeal the Appellants do not stand any claim on that interest.
And the Corps’ own authority states that the mere presence of economic
interest alongside environmental interest is not “disqualif[ying].” 
Id. at 274
.
We conclude accordingly that at least the claims against the Army Corps of
Engineers are not disqualified.




                                        17
Case: 23-10892        Document: 87-1          Page: 18   Date Filed: 12/13/2024




                                   No. 23-10892


                                        D.
       On the other hand, we have no reason to disturb the dismissal of the
City of Dallas from the proceedings. Appellants clarified at oral argument
that they were not seeking to invoke federal jurisdiction for any claims
relating to the City’s condemnation. Oral Arg. at 1:27, 3:11, 3:28, 4:42. With
these claims abandoned, we do not reach the “difficult question” of whether
the Anti-Injunction Act, 
28 U.S.C. § 2283
, would bar relief in this case. See
Boerschig v. Trans-Pecos Pipeline, L.L.C., 
872 F.3d 701, 705
 (5th Cir. 2017).
                                        E.
       The district court did not reach the question of whether the suit was
barred by the statute of limitations in 
28 U.S.C. § 2401
(a). The Supreme
Court recently instructed that the statute of limitations for APA claims
“begins to run only when the plaintiff has a complete and present cause of
action.” Corner Post, Inc. v. Bd. of Governors of Fed. Rsrv. Sys., 
144 S. Ct. 2440
, 2452 (2024). This statement invites further analysis, particularly in
the context of claims that an agency has unlawfully failed to act or delayed
acting. See, e.g., Harrison Cnty., 
63 F.4th at 464
 n.8 (addressing claims based
on agency action); Wyo-Ben Inc. v. Haaland, 
63 F.4th 857, 868
 (10th Cir.
2023) (noting diverging approaches). We reserve such discussion for the
district court in the first instance.
                                        IV.
       For the foregoing reasons, we REVERSE the district court’s
dismissal of the suit with respect to the Army Corps of Engineers, AFFIRM
the dismissal with respect to the City of Dallas, and REMAND for further
proceedings consistent with this opinion.




                                        18