USCA4 Appeal: 21-1039 Doc: 89 Filed: 01/25/2022 Pg: 1 of 29 PUBLISHED UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT No. 21-1039 WILD VIRGINIA; SIERRA CLUB; APPALACHIAN VOICES; WILDERNESS SOCIETY; PRESERVE CRAIG; SAVE MONROE; INDIAN CREEK WATERSHED ASSOCIATION, Petitioners, v. UNITED STATES FOREST SERVICE, an agency of the U.S. Department of Agriculture; JIM HUBBARD, in his official capacity as Under Secretary for Natural Resources and Environment, United States Department of Agriculture; KEN ARNEY, in his official capacity as Regional Forester of the Southern Region, Respondents, MOUNTAIN VALLEY PIPELINE, LLC, Intervenor. ------------------------------ CHEROKEE FOREST VOICES; GEORGIA FORESTWATCH; MOUNTAINTRUE; THE CLINCH COALITION; VIRGINIA WILDERNESS COMMITTEE, Amici Supporting Petitioner. AMERICAN FOREST RESOURCE COUNCIL; BLACK HILLS FOREST RESOURCE ASSOCIATION; COLORADO TIMBER INDUSTRY ASSOCIATION; FEDERAL FOREST RESOURCE COALITION; INTERMOUNTAIN FOREST ASSOCIATION; MONTANA WOOD PRODUCTS ASSOCIATION, Amici Supporting Respondent. USCA4 Appeal: 21-1039 Doc: 89 Filed: 01/25/2022 Pg: 2 of 29 On Petition for Review of an Order of the Department of Agriculture.

Citator

UpLaw has not yet analyzed Wild Virginia v. United States Forest Service. The absence of a flag is not a finding that it is good law.

Cited by
5 opinions
USCA4 Appeal: 21-1039         Doc: 89          Filed: 01/25/2022   Pg: 1 of 29




                                                 PUBLISHED

                                   UNITED STATES COURT OF APPEALS
                                       FOR THE FOURTH CIRCUIT


                                                  No. 21-1039


        WILD VIRGINIA; SIERRA CLUB; APPALACHIAN VOICES; WILDERNESS
        SOCIETY; PRESERVE CRAIG; SAVE MONROE; INDIAN CREEK
        WATERSHED ASSOCIATION,

                                Petitioners,

                        v.

        UNITED STATES FOREST SERVICE, an agency of the U.S. Department of
        Agriculture; JIM HUBBARD, in his official capacity as Under Secretary for
        Natural Resources and Environment, United States Department of Agriculture;
        KEN ARNEY, in his official capacity as Regional Forester of the Southern Region,

                                Respondents,

        MOUNTAIN VALLEY PIPELINE, LLC,

                                Intervenor.

        ------------------------------

        CHEROKEE   FOREST    VOICES;   GEORGIA     FORESTWATCH;
        MOUNTAINTRUE; THE CLINCH COALITION; VIRGINIA WILDERNESS
        COMMITTEE,

                                Amici Supporting Petitioner.

        AMERICAN FOREST RESOURCE COUNCIL; BLACK HILLS FOREST
        RESOURCE     ASSOCIATION;  COLORADO    TIMBER   INDUSTRY
        ASSOCIATION;    FEDERAL   FOREST   RESOURCE    COALITION;
        INTERMOUNTAIN     FOREST  ASSOCIATION;   MONTANA   WOOD
        PRODUCTS ASSOCIATION,

                                Amici Supporting Respondent.
USCA4 Appeal: 21-1039         Doc: 89          Filed: 01/25/2022   Pg: 2 of 29




        On Petition for Review of an Order of the Department of Agriculture. (AGRI-1).


                                                  No. 21-1082


        WILD VIRGINIA; SIERRA CLUB; APPALACHIAN VOICES; THE
        WILDERNESS SOCIETY; PRESERVE CRAIG; SAVE MONROE; INDIAN
        CREEK WATERSHED ASSOCIATION,

                                Petitioners,

        v.

        UNITED STATES BUREAU OF LAND MANAGEMENT, an agency of the U.S.
        Department of Interior; DEB HAALAND, in her official capacity as Secretary of
        the Interior; MITCHELL LEVERETTE, in his official capacity as State Director,
        Bureau of Land Management, Eastern States,

                                Respondents,

        MOUNTAIN VALLEY PIPELINE, LLC,

                                Intervenor.

        ------------------------------

        CHEROKEE   FOREST    VOICES;   GEORGIA     FORESTWATCH;
        MOUNTAINTRUE; THE CLINCH COALITION; VIRGINIA WILDERNESS
        COMMITTEE,

                                Amici Supporting Petitioner,

        AMERICAN FOREST RESOURCE COUNCIL; BLACK HILLS FOREST
        RESOURCE     ASSOCIATION;  COLORADO    TIMBER   INDUSTRY
        ASSOCIATION;    FEDERAL   FOREST   RESOURCE    COALITION;
        INTERMOUNTAIN     FOREST  ASSOCIATION;   MONTANA   WOOD
        PRODUCTS ASSOCIATION,

                                Amici Supporting Respondent.


                                                        2
USCA4 Appeal: 21-1039     Doc: 89         Filed: 01/25/2022    Pg: 3 of 29




        On Petition for Review of an Order of the Department of Interior. (DOI-1).


        Argued: October 29, 2021                                     Decided: January 25, 2022


        Before GREGORY, Chief Judge, and WYNN and THACKER, Circuit Judges.


        Petitions granted in part and denied in part, vacated and remanded by published opinion.
        Judge Thacker wrote the opinion, in which Chief Judge Gregory and Judge Wynn joined.


        ARGUED: Nathan Matthews, SIERRA CLUB, Oakland, California, for Petitioners.
        Brian C. Toth, UNITED STATES DEPARTMENT OF JUSTICE, Washington, D.C., for
        Respondents. Donald B. Verrilli, Jr., MUNGER, TOLLES & OLSON LLP, Washington,
        D.C., for Intervenor. ON BRIEF: Ankit Jain, SIERRA CLUB, Washington, D.C.;
        Derek O. Teaney, Benjamin Luckett, APPALACHIAN MOUNTAIN ADVOCATES,
        INC., Lewisburg, West Virginia, for Petitioners Wild Virginia, Sierra Club, Appalachian
        Voices, The Wilderness Society, Preserve Craig, Save Monroe, and Indian Creek
        Watershed Association. William J. Cook, Special Counsel, CULTURAL HERITAGE
        PARTNERS, PLLC, Washington, D.C., for Petitioner Monacan Indian Nation. Jean E.
        Williams, Acting Assistant Attorney General, Todd Kim, Acting Assistant Attorney
        General, Justin D. Hemminger, Environment and Natural Resources Division, UNITED
        STATES DEPARTMENT OF JUSTICE, Washington, D.C.; Michael D. Smith, Office of
        the Solicitor, UNITED STATES DEPARTMENT OF THE INTERIOR, Washington,
        D.C.; Sarah Kathmann, Office of the General Counsel, UNITED STATES
        DEPARTMENT OF AGRICULTURE, Washington, D.C., for Respondents. George P.
        Sibley, III, J. Pierce Lamberson, Brian R. Levey, HUNTON ANDREWS KURTH LLP,
        Richmond, Virginia; Sandra A. Snodgrass, HOLLAND & HART LLP, Denver,
        Colorado; Thomas C. Jensen, Stacey M. Bosshardt, PERKINS COIE LLP, Washington,
        D.C., for Intervenor. J. Patrick Hunter, Asheville, North Carolina, Spencer Gall, Kristin
        Davis, Gregory Buppert, SOUTHERN ENVIRONMENTAL LAW CENTER,
        Charlottesville, Virginia, for Amici Cherokee Forest Voices, Georgia ForestWatch,
        MountainTrue, The Clinch Coalition, and Virginia Wilderness Committee. Lawson E.
        Fite, AMERICAN FOREST RESOURCE COUNCIL, Portland, Oregon, for Amici
        American Forest Resource Council, Black Hills Forest Resource Association, Colorado
        Timber Industry Association, Federal Forest Resource Coalition, Intermountain Forest
        Association, and Montana Wood Products Association.



                                                   3
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 4 of 29




        THACKER, Circuit Judge:

               In these two consolidated cases, several environmental advocacy organizations --

        Wild Virginia, the Sierra Club, Appalachian Voices, the Wilderness Society, Preserve

        Craig, Save Monroe, and the Indian Creek Watershed Association (collectively,

        “Petitioners”) -- seek review of the renewed decisions of the United States Forest Service

        (the “Forest Service”) and the Bureau of Land Management (the “BLM”) to allow the

        Mountain Valley Pipeline (the “Pipeline”), an interstate natural gas pipeline system, to

        cross three and a half miles of the Jefferson National Forest in Virginia and West

        Virginia. This is the second time Petitioners have challenged the agencies’ approval of

        the Pipeline. We previously vacated the agencies’ records of decision (“RODs”) because

        the Forest Service and the BLM failed to comply with the National Environmental Policy

        Act (“NEPA”), the National Forest Management Act (the “NFMA”), and the Mineral

        Leasing Act (the “MLA”). We directed the agencies to re-evaluate certain aspects of the

        Pipeline’s potential environmental impact. Sierra Club, Inc. v. U.S. Forest Serv., 
897 F.3d 582
 (4th Cir. 2018).

               Petitioners contend that the agencies’ renewed RODs after remand also violate

        NEPA, the NFMA, and the MLA. As more fully explained below, we agree with

        Petitioners in part, so we grant their petitions as to three errors, deny the petitions with

        regard to Petitioners’ remaining arguments, vacate the RODs of the Forest Service and

        the BLM, and remand for further proceedings consistent with this opinion.




                                                     4
USCA4 Appeal: 21-1039      Doc: 89        Filed: 01/25/2022     Pg: 5 of 29




                                                    I.

                                                   A.

                            Governing Statutory and Regulatory Framework

                                                    1.

                                                 NEPA

              NEPA is a federal environmental protection statute that “declares a national policy

        of protecting and promoting environmental quality” and requires federal agencies to

        scrutinize the potential environmental impacts of their projects. Hughes River Watershed

        Conservancy v. Glickman, 
81 F.3d 437, 443
 (4th Cir. 1996); see 
42 U.S.C. § 4331
.

        Notably, NEPA does not require the agencies to reach particular substantive results.

        Hughes River, 
81 F.3d at 443
. Rather, NEPA imposes procedural requirements that

        obligate federal agencies “to undertake analyses of the environmental impact of their

        proposals and actions.” Dep’t of Transp. v. Pub. Citizen, 
541 U.S. 752
, 756–57 (2004)

        (citing Robertson v. Methow Valley Citizens Council, 
490 U.S. 332
, 349–50 (1989)). In

        order to accomplish this objective, NEPA mandates that federal agencies prepare an

        environmental impact statement (“EIS”) as part of “every recommendation or report on

        proposals for . . . major Federal actions significantly affecting the quality of the human

        environment.” 
42 U.S.C. § 4332
(2)(C). The primary purpose of an EIS is “to ensure

        agencies consider the environmental impacts of their actions in decision making.” 
40 C.F.R. § 1502.1
. Accordingly, the EIS must analyze the proposed project’s “significant

        environmental impacts” and discuss “reasonable alternatives that would avoid or

        minimize adverse impacts or enhance the quality of the human environment.” 
Id.
 Of

                                                    5
USCA4 Appeal: 21-1039      Doc: 89        Filed: 01/25/2022     Pg: 6 of 29




        note, “if significant new information or environmental changes come to light after the

        agency prepares an EIS,” the agency must prepare a supplemental EIS to address them.

        Save Our Sound OBX, Inc. v. N.C. Dep’t of Transp., 
914 F.3d 213, 218
 (4th Cir. 2019)

        (citing 
40 C.F.R. § 1502.9
).

              “Multiple agencies may cooperate to issue an EIS, but a ‘lead agency’ is usually

        designated.” Sierra Club, Inc. v. U.S. Forest Serv., 
897 F.3d 582, 588
 (4th Cir. 2018)

        (citing 
7 C.F.R. § 3407.11
(a)). The Federal Energy Regulatory Commission (“FERC”) is

        the lead NEPA agency when the proposed project involves an interstate gas pipeline. 
Id.
        (citing 15 U.S.C. § 717n(b)(1); EarthReports, Inc. v. FERC, 
828 F.3d 949, 953
 (D.C. Cir.

        2016)).

               “[A]fter the agency makes a decision regarding the action [based on its

        consideration of the proposal’s environmental impacts laid out in the EIS], it must

        publish a [ROD], at which point it may then finalize its action.” Webster v. U.S. Dep’t of

        Agric., 
685 F.3d 411, 418
 (4th Cir. 2012) (citing Nat’l Audubon Soc’y v. Dep’t of the

        Navy, 
422 F.3d 174
, 185 (4th Cir. 2005)); see 
40 C.F.R. § 1505.2
.

                                                    2.

                                               The NFMA

               The NFMA provides substantive and procedural guidance to the Forest Service for

        the management of National Forest System lands. Pursuant to the NFMA, the Forest

        Service “develops land and resource management plans” -- known as forest plans -- “and

        uses [them] to ‘guide all natural resource management activities’” within the national

        forests. Ohio Forestry Ass’n v. Sierra Club, 
523 U.S. 726, 729
 (1998). To that end, “the

                                                    6
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 7 of 29




        Forest Service must ensure that all resource plans and permits, contracts, and other

        instruments for the use and occupancy of National Forest System lands . . . are consistent

        with the Forest Plans.” Sierra Club, 
897 F.3d at 600
 (alteration and internal quotation

        marks omitted); see 
16 U.S.C. § 1604
(i). When a proposed project is not consistent with

        the applicable forest plan, the Forest Service must decide whether to modify the project

        to ensure consistency with the forest plan, reject the proposal or terminate the project, or

        amend the forest plan to accommodate the project. 
36 C.F.R. § 219.15
(c).

               In 2012, pursuant to the NFMA, the Forest Service promulgated a rule governing

        amendments to forest plans (the “2012 Planning Rule”). See National Forest System

        Land Management Planning, 
77 Fed. Reg. 21,162
 (Apr. 9, 2012) (to be codified at 36

        C.F.R. pt. 219).    The 2012 Planning Rule imposes “substantive requirements” for

        sustainability, diversity of plant and animal communities, multiple land uses, and

        timbering that are intended to “maintain or restore” ecological integrity and ecosystem

        diversity in national forests while preserving those forests for multiple uses. Id.; see 
36 C.F.R. §§ 219
.8–219.11. The 2012 Planning Rule further provides that a forest plan

        “may be amended at any time,” 
36 C.F.R. § 219.13
(a), but it requires that any such

        amendment be “consistent with Forest Service NEPA procedures,” 
id.
 § 219.13(b)(3).

               Due to confusion about how to apply the 2012 Planning Rule’s substantive

        requirements to forest plans developed pursuant to a 1982 forest planning rule with




                                                     7
USCA4 Appeal: 21-1039     Doc: 89         Filed: 01/25/2022    Pg: 8 of 29




        different requirements, 1 the Forest Service revised its 2012 Planning Rule in 2016 (the

        “2016 Revised Rule”). See National Forest System Land Management Planning, 
81 Fed. Reg. 90,723
 (Dec. 16, 2016) (to be codified at 36 C.F.R. pt. 219). The 2016 Revised

        Rule requires the Forest Service, when amending a forest plan, to determine which

        “substantive requirements” of the 2012 Planning Rule are “directly related” to the forest

        plan amendment and “apply” those requirements “within the scope and scale of the

        amendment.” 
36 C.F.R. § 219.13
(b)(5).

                                                   3.

                                               The MLA

              The MLA “authorizes the Secretary of the Interior to lease public-domain lands to

        private parties for the production of oil and gas.” BP Am. Prod. Co. v. Burton, 
549 U.S. 84, 87
 (2006); see 
30 U.S.C. § 185
(a). “The MLA regulates the location of interstate

        pipelines across most federal lands,” which “includes approving rights of way and

        easements for the siting of those pipelines.” Sierra Club, 
897 F.3d at 604
 (emphasis

        deleted). “In order to minimize adverse environmental impacts and the proliferation of



              1
                 Forest plans developed pursuant to the 1982 forest planning rule are guided by
        fourteen overarching “principles,” and in addition to procedural standards, the rule
        includes substantive standards for timbering, wilderness management, and resource
        preservation. 
36 C.F.R. §§ 219
.1–219.29 (1982), https://www.fs.fed.us/emc/nfma/
        includes/nfmareg.html. When proposing the 2012 Planning Rule, the Forest Service
        acknowledged that “most 1982 rule [forest] plans will not be consistent with all of the
        [substantive] requirements of the 2012 [P]lanning [R]ule.” National Forest System Land
        Management Planning, 
81 Fed. Reg. 70,373
, 70,376 (proposed Oct. 12, 2016) (to be
        codified at 36 C.F.R. pt. 219).


                                                   8
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022      Pg: 9 of 29




        separate rights-of-way across Federal lands,” the MLA requires that rights of way in

        common be utilized “to the extent practical.” 
30 U.S.C. § 185
(p).

               When multiple federal agencies administer the federal lands traversed by an

        interstate pipeline, the MLA authorizes the Secretary of the Interior, “after consultation

        with the agencies involved, to grant or renew rights-of-way or permits through the

        Federal lands involved.” 
30 U.S.C. § 185
(c)(2).        The Secretary of the Interior has

        delegated her authority to the BLM. 
36 C.F.R. § 251.54
(b)(3) (“Proposals for oil and gas

        pipeline rights-of-way crossing Federal lands under the jurisdiction of two or more

        Federal agencies must be filed with the [BLM] . . . .”); 
43 C.F.R. § 2884.26
 (“If the

        application involves lands managed by two or more Federal agencies, BLM will not issue

        or renew [a right of way or temporary use permit] until the heads of the agencies

        administering the lands involved have concurred.”).

                                                    B.

                                           The Pipeline Project

               The Pipeline, a project of Mountain Valley Pipeline, LLC (“MVP”), is planned to

        extend for more than 300 miles from Wetzel County, West Virginia, to Pittsylvania

        County, Virginia, upon its completion. On October 13, 2017, FERC issued a Certificate

        of Public Convenience and Necessity 2 (the “FERC Certificate”) authorizing MVP to



               2
                  Pursuant to the Natural Gas Act, a natural gas company is prohibited from
        “engag[ing] in the transportation or sale of natural gas . . . or undertak[ing] the
        construction or extension of any facilities therefor, or acquir[ing] or operat[ing] any such
        facilities or extensions thereof, unless there is in force with respect to such natural-gas
        (Continued)
                                                     9
USCA4 Appeal: 21-1039        Doc: 89        Filed: 01/25/2022    Pg: 10 of 29




        construct, operate, and maintain the Pipeline, new compressor stations, and new

        regulation stations and interconnections. Per NEPA, FERC also prepared an EIS for the

        Pipeline. The EIS purportedly considered the Pipeline’s projected impact on geology and

        soils; groundwater, surface waters, and wetlands; vegetation and wildlife; land use and

        visual resources; socioeconomics and transportation; cultural resources; air quality and

        noise; and reliability and safety. It also purportedly analyzed the Pipeline’s cumulative

        impacts and considered alternatives. Ultimately, FERC concluded that “construction and

        operation of the [Pipeline] would result in limited adverse environmental impacts, with

        the exception of impacts on forest” and that “approval of the [Pipeline] would result in

        some adverse environmental impacts, but the majority of these impacts would be reduced

        to less-than-significant levels.” J.A. 2015. 3

               The Pipeline’s projected route crosses a 3.5-mile swath of the Jefferson National

        Forest in Giles and Montgomery Counties in Virginia and Monroe County in West

        Virginia. This section of the projected route includes four stream crossings. In order to

        construct the Pipeline on these lands, MVP must obtain rights of way and temporary use

        permits from the BLM, in consultation with the Forest Service. The Pipeline must also

        be consistent with the forest plan developed by the Forest Service for the Jefferson




        company a certificate of public convenience and necessity issued by [FERC] authorizing
        such acts or operations.” 15 U.S.C. § 717f(c)(1)(A).
               3
                   Citations to the “J.A.” refer to the Joint Appendix filed by the parties in this
        appeal.


                                                         10
USCA4 Appeal: 21-1039       Doc: 89         Filed: 01/25/2022      Pg: 11 of 29




        National Forest (the “Jefferson Forest Plan”). The Jefferson Forest Plan “[e]stablishes

        the management direction and associated long-range goals and objectives of the Jefferson

        National Forest” and “[s]pecifies [certain] standards, which set the sideboards for

        achieving the goals, objectives and desired conditions, as well as provide meaningful

        direction when implementing projects” within the Jefferson National Forest. J.A. 1937.

        The Pipeline, as proposed, and as detailed more specifically below, would be inconsistent

        with 11 standards from five categories -- utility corridors, soil and riparian resources, old

        growth management areas, Appalachian National Scenic Trail areas, and scenery

        integrity objectives -- in the Jefferson Forest Plan.

                                                      C.

                                              Prior Proceedings

               In December 2017, the Forest Service, using FERC’s EIS, initially decided to

        amend the Jefferson Forest Plan to accommodate the Pipeline but limit the amendments’

        applicability only to the Pipeline project.        Consequently, the Forest Service’s ROD

        modified 11 standards in the Jefferson Forest Plan that were inconsistent with the

        Pipeline project and waived 3 of those 11 standards. For example, the ROD relaxed one

        of the standards for soil and riparian resources as follows (with the modification in bold):

                      Standard FW-5: On all soils dedicated to growing vegetation,
                      the organic layers, topsoil and root mat will be left in place
                      over at least 85% of the activity area and revegetation is
                      accomplished within 5 years, with the exception of the
                      operational right-of-way and the construction zone for the
                      Mountain Valley Pipeline, for which the applicable
                      mitigation measures [MVP proposed] must be
                      implemented.
                                                      11
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 12 of 29




        J.A. 2231 (emphasis in original).     However, we vacated the Forest Service’s ROD

        because the Forest Service did not conduct an “independent review” of the EIS’s

        sedimentation analysis. 4 Sierra Club, 
897 F.3d at 594
. In addition, we rejected the

        Forest Service’s conclusion that the soil and riparian resources requirements set forth in

        the 2012 Planning Rule were not “directly related” to the amendments to the Jefferson

        Forest Plan to accommodate the Pipeline, principally because the Forest Service itself

        acknowledged that those requirements could not be met absent the amendments. 
Id. at 603
.

               The BLM also initially adopted FERC’s EIS and, “with the concurrence of the

        Forest Service and the [United States Army] Corps of Engineers . . . issued a [ROD]

        granting a 30 year, 50-foot operational right of way and associated temporary use

        permits” for the Pipeline’s projected route through the Jefferson National Forest. Sierra

        Club, 
897 F.3d at 589
. But, we held that the BLM failed to determine whether “the



               4
                 “Sedimentation is defined as the ‘process of deposition of a solid material,’ or
        sediment, ‘from a state of suspension or solution in a fluid’ . . . .” Sierra Club, 
897 F.3d at 590
 n.5. Specifically, in rejecting the EIS’s sedimentation analysis, we took issue with
        the Forest Service’s acceptance of the EIS’s estimation that sedimentation control
        measures would result in 79% containment of sediment -- a figure derived from a
        hydrological analysis MVP provided to FERC -- despite the Forest Service’s estimation
        in comments on a draft of the hydrological analysis that 48% containment was a more
        appropriate figure. See 
id. at 595
. We also questioned the Forest Service’s acceptance of
        the EIS’s conclusion that the Pipeline would increase sedimentation to levels in excess of
        10% above the baseline, despite its earlier concerns -- again in comments on a draft of the
        hydrological analysis -- that such levels could negatively affect sensitive aquatic species.
        See 
id.
 at 595–96.


                                                    12
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 13 of 29




        utilization of an existing right of way would be impractical,” in violation of the MLA. 
Id. at 605
 (emphasis deleted).

               Therefore, we vacated the RODs of the Forest Service and the BLM and remanded

        this matter to the agencies. We directed the Forest Service to more thoroughly analyze

        the Pipeline’s sedimentation impacts and apply the 2012 Planning Rule’s soil and riparian

        resources requirements to the proposed Jefferson Forest Plan amendments for the

        Pipeline. Sierra Club, 
897 F.3d at 596, 603
. And we instructed the BLM to make a

        specific finding about the practicality of utilizing an existing right of way for the

        Pipeline. 
Id. at 605
.

                                                    D.

                                       Proceedings Since Remand

                                                    1.

                                           The Forest Service

               On remand, the Forest Service and the BLM prepared a supplemental EIS which

        sought to address the Pipeline’s sedimentation impacts utilizing two hydrological

        analyses provided by MVP.        But neither of these hydrological analyses, nor the

        supplemental EIS, considered water quality monitoring data from the United States

        Geological Survey (“USGS”) monitoring stations fifteen miles outside the Jefferson

        National Forest, where construction of the Pipeline has occurred near the Roanoke River.




                                                    13
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 14 of 29




        The USGS data showed water turbidity 5 values that were 20% higher downstream from

        the Pipeline’s construction than upstream -- a significant difference from the 2.1%

        increase in sedimentation the hydrologic analyses predicted for the Roanoke River.

               The Forest Service also elaborated on its analysis of the 2012 Planning Rule’s

        application to the Pipeline. In particular, it determined that 10 of the 2012 Planning

        Rule’s substantive requirements were directly related to the amendments to the Jefferson

        Forest Plan for the Pipeline:

                      § 219.8(a)(2)(ii)    –    Soils     and     soil   productivity;
                      § 219.8(a)(2)(iii) – Water quality; § 219.8(a)(2)(iv) – Water
                      resources in the plan area; § 219.8(a)(3)(i) – Ecological
                      integrity of riparian areas; § 219.8(b)(3) – Multiple uses that
                      contribute to local, regional, and national economies;
                      § 219.9(a)(2) – Ecosystem diversity of terrestrial and aquatic
                      ecosystems; § 219.10(a)(3) – Appropriate placement and
                      sustainable management of infrastructure, such as recreational
                      facilities and transportation and utility corridors;
                      § 219.10(b)(1)(i) – Sustainable recreation, including
                      recreation setting, opportunities, access, and scenic character;
                      § 219.10(b)(1)(iv) – Other designated areas or recommended
                      designated areas; and § 219.11(c) – Timber harvest for
                      purposes other than timber production.

        J.A. 582. The supplemental EIS provides that the amendments to accommodate the

        Pipeline are “in full compliance with the [2012] Planning Rule because all applicable

        substantive requirements are applied to provide protection to resources without

               5
                “Turbidity refers to cloudiness caused by very small particles of silt, clay, and
        other substances suspended in water.” Water Supply System: Health Concerns,
        Encyclopaedia Britannica – Technology, https://www.britannica.com/technology/water-
        supply-system/Health-concerns#ref1084761.


                                                    14
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 15 of 29




        substantial lessening of protections for those resources across the [Jefferson National

        Forest].” Id.

                                                     2.

                                                The BLM

               As part of the supplemental EIS it prepared in conjunction with the Forest Service,

        the BLM evaluated whether existing rights of way on federal lands could accommodate

        the Pipeline without issuing a new right of way. In doing so, the BLM considered

        alternative routes collocating the Pipeline with the proposed route of the since-cancelled

        Atlantic Coast Pipeline, 6 with existing public roads, and with electric transmission lines.

        The BLM also considered several route variations. The BLM made specific findings

        about whether each alternative route or route variation was practical and concluded that

        “none . . . would [both] result in greater collocation on federal lands and be practical.”

        J.A. 819. It determined that those alternative routes that would increase collocation


               6
                 On July 5, 2020, the energy companies behind the Atlantic Coast Pipeline
        announced that they would no longer move forward “due to ongoing delays and
        increasing cost uncertainty which threaten the economic viability of the project.” Press
        Release, Dominion Energy, Dominion Energy and Duke Energy Cancel the Atlantic
        Coast Pipeline (July 5, 2020), https://news.dominionenergy.com/2020-07-05-Dominion-
        Energy-and-Duke-Energy-Cancel-the-Atlantic-Coast-Pipeline. The companies’ decision
        came after we vacated several decisions of state and federal agencies approving the
        project. See, e.g., Friends of Buckingham v. State Air Pollution Control Bd., 
947 F.3d 68
        (4th Cir. 2020) (vacating Virginia environmental regulator’s decision issuing permit to
        construct Atlantic Coast Pipeline compressor station); Defs. of Wildlife v. U.S. Dep’t of
        the Interior, 
931 F.3d 339
 (4th Cir. 2019) (vacating Fish and Wildlife Service’s
        biological opinion for Atlantic Coast Pipeline); Sierra Club v. U.S. Dep’t of the Interior,
        
899 F.3d 260
 (4th Cir. 2018) (vacating Fish and Wildlife Service’s and National Park
        Service’s approval of Atlantic Coast Pipeline).


                                                    15
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 16 of 29




        “would be impractical due to a combination of constructability and safety challenges,

        increased environmental impacts, increased length and footprint, increased cost, and

        inability to serve the purposes of the [Pipeline] or the specific purpose of the route

        alternative in question.” 
Id.
 at 819–20 (footnote omitted).

                                                    3.

                                                  FERC

               In the meantime, FERC partially authorized MVP to use the “conventional bore

        method” to cross under the bodies of water along the Pipeline’s projected route, including

        the four streams in the Jefferson National Forest, pending FERC’s evaluation of the

        potential environmental impact of that method.

                                                    4.

                                             Renewed RODs

               Ultimately, on January 11, 2021, the Forest Service, via the United States

        Department of Agriculture’s Under Secretary for Natural Resources and Environment,

        issued a second ROD approving the Pipeline. The renewed ROD adopted the Forest

        Service’s environmental analysis in the supplemental EIS and again amended the

        Jefferson Forest Plan by modifying 11 plan standards to accommodate the Pipeline and

        limited the amendments only to the Pipeline. Petitioners sought review of the ROD in

        this court the same day it was issued.

               Three days later, on January 14, 2021, the Secretary of the Interior issued a ROD

        granting the Pipeline a right of way in the Jefferson National Forest.       The BLM’s

        renewed ROD also adopted the supplemental EIS and again authorized a 30-year right of

                                                    16
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 17 of 29




        way and associated temporary use permits for the Pipeline’s proposed route through the

        Jefferson National Forest. Petitioners also filed a petition for review of that decision in

        this court on January 20, 2021. We consolidated the cases on appeal.

                                                    II.

               “We may hold unlawful and set aside a federal agency action for certain specified

        reasons, including whenever the challenged act is arbitrary, capricious, an abuse of

        discretion, or otherwise not in accordance with the law.” Sierra Club, Inc. v. U.S. Forest

        Serv., 
897 F.3d 582
, 589–90 (4th Cir. 2018) (alteration and internal quotation marks

        omitted); see 
5 U.S.C. § 706
(2).

                      An agency’s decision is arbitrary and capricious if the agency
                      relied on factors which Congress has not intended it to
                      consider, entirely failed to consider an important aspect of the
                      problem, offered an explanation for its decision that runs
                      counter to the evidence before the agency, or is so
                      implausible that it could not be ascribed to a difference in
                      view or the product of agency expertise.

        
Id.
 at 590 (quoting Defs. of Wildlife v. N.C. Dep’t of Transp., 
762 F.3d 374, 396
 (4th Cir.

        2014)). “[O]ur oversight [of agency action is] ‘highly deferential, with a presumption in

        favor of finding the agency action valid,’ yet the arbitrary-and-capricious standard does

        not ‘reduce judicial review to a rubber stamp of agency action.’” Friends of Back Bay v.

        U.S. Army Corps of Eng’rs, 
681 F.3d 581, 587
 (4th Cir. 2012) (quoting Ohio Valley Env’t

        Coal. v. Aracoma Coal Co., 
556 F.3d 177, 192
 (4th Cir. 2009)).




                                                    17
USCA4 Appeal: 21-1039       Doc: 89        Filed: 01/25/2022      Pg: 18 of 29




                                                    III.

               Petitioners once again argue that the Forest Service and the BLM violated NEPA,

        the NFMA, and the MLA in permitting MVP to construct the Pipeline in the Jefferson

        National Forest. We address each of Petitioners’ arguments in turn.

                                                    A.

                                           Predecisional Review

               Petitioners first argue that the Forest Service violated its own regulations by

        failing to undertake the administrative “predecisional review” process before authorizing

        the Pipeline’s route through the Jefferson National Forest. On this point, we disagree

        with Petitioners.

               The predecisional review process effectually prohibits the Forest Service from

        issuing a final decision on a matter without first offering an opportunity for eligible

        parties to object to the draft ROD and responding to each objection in writing. See 
36 C.F.R. §§ 218.7
, 218.12. It applies to “proposed actions of the Forest Service concerning

        projects and activities implementing [forest plans] documented with a [ROD].”         
Id.
        § 218.1. The “reviewing officer” charged with responding to the objections is a Forest

        Service or Department of Agriculture official with more authority than the official

        responsible for making the decision. See id. §§ 218.3(a), 218.11. But, significantly,

        “[p]rojects and activities proposed by the Secretary of Agriculture or the Under

        Secretary, Natural Resources and Environment, are not subject to” the predecisional

        review process. Id. § 218.13(b).    This exception applies in this case.



                                                    18
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022      Pg: 19 of 29




               In an attempt to evade this exception to the predecisional process, Petitioners

        assert that MVP, not the Under Secretary for Natural Resources and Environment,

        “proposed” the Pipeline project. But Petitioners’ interpretation of the term “proposed” as

        it is used in the exception is too narrow and ignores the broader regulatory scheme. The

        regulations governing the predecisional review process make clear that a proposal, for

        purposes of the exception, does not mean the application triggering action by the Forest

        Service but, rather, how the Forest Service decides to act in response to that application.

               The structure of the predecisional review process -- which essentially provides for

        an additional level of scrutiny of a decision by an official of higher rank than the

        decisionmaking official -- and the language of the regulation defining “reviewing officer”

        presume that officers within the agency make proposals. 
36 C.F.R. § 218.3
(a). There is

        no distinction based on the source of the project’s application. The Forest Service’s

        internal guidance reinforces this interpretation: “A proposed action is a proposal by the

        Forest Service to authorize, recommend, or implement an action to meet a specific

        purpose and need. . . . When the Forest Service accepts an external proponent’s proposal

        (like a powerline or ski resort) it becomes an Agency proposal to authorize the action.”

        U.S. Forest Serv., FSH 1909.15 – National Environmental Policy Act Handbook, ch. 10,

        § 11.2 (2012), https://www.fs.fed.us/emc/nepa/nepa_procedures/index.shtml.

               The Under Secretary for Natural Resources and Environment signed the ROD

        amending the Jefferson Forest Plan to accommodate the Pipeline. The Under Secretary’s

        approval “constitutes the final administrative determination of the U.S. Department of

        Agriculture.” 
36 C.F.R. § 218.13
(b). Therefore, the proposal was not subject to the

                                                     19
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 20 of 29




        predecisional review process. See Project-Level Predecisional Administrative Review

        Process, 
77 Fed. Reg. 47,337
, 47,341 (proposed Aug. 8, 2012) (to be codified at 36

        C.F.R. pt. 218) (“[
36 C.F.R. § 218.13
(b)] identifies that projects and activities authorized

        by the Secretary or Under Secretary of Agriculture are not subject to [the predecisional

        review] procedures.”).

                                                    B.

                                  Actual Sediment and Erosion Impacts

               Next, Petitioners contend that the Forest Service and the BLM violated NEPA, the

        NFMA, and the MLA by inadequately considering the Pipeline’s sediment and erosion

        impacts. Specifically, Petitioners assert that 1) the sediment modeling MVP used in its

        hydrological analyses relied on unsupported and implausible assumptions; 2) evidence of

        the Pipeline’s actual impacts indicates the modeling is unreasonable, and the Forest

        Service and the BLM did not address such evidence; and 3) the agencies failed to address

        whether erosion and sedimentation caused by the Pipeline would violate water quality

        standards. We agree with Petitioners only as to the second of these assertions.

               The Forest Service and the BLM erroneously failed to account for real-world data

        suggesting increased sedimentation along the Pipeline route. There is no evidence that

        the agencies reviewed the USGS water quality monitoring data from the Roanoke River,

        which may indicate a significant increase in sedimentation beyond that predicted in the

        modeling used for the supplemental EIS. At the very least, the supplemental EIS should

        have acknowledged this disparity and explained its impact on the agencies’ reliance on

        the sedimentation data in the hydrological analyses.

                                                    20
USCA4 Appeal: 21-1039      Doc: 89          Filed: 01/25/2022     Pg: 21 of 29




               But the Forest Service and the BLM suggest that the USGS data is not useful to

        their analysis for two reasons. First, they argue that the sediment modeling utilized in the

        supplemental EIS is not designed for site-specific comparisons. This argument begs the

        question -- how is the modeling useful to predict the Pipeline’s environmental impact if it

        does not somehow reflect real-world data and scenarios demonstrating that impact?

               Second, the agencies assert that Petitioners have not demonstrated how the USGS

        data is “relevant to the choice among alternatives with different environmental effects,”

        which is the key consideration for their NEPA cost-benefit analysis.              
40 C.F.R. § 1502.22
. But this is an improper effort to shift the agencies’ burden onto Petitioners.

        The Forest Service and the BLM, not Petitioners, are charged with fully considering the

        Pipeline’s potential environmental impact before approving it.

               The same is true of the agencies’ argument that the USGS data should be

        discounted because it derives from locations outside the Jefferson National Forest. The

        Forest Service and the BLM suggest that the USGS data is unreliable because Petitioners

        “do not suggest that the land use [in the areas outside the forest where the USGS

        monitoring stations are located] is identical to the Forest sites,” nor do Petitioners account

        for soil-loss mitigation measures or “the corresponding climactic conditions during the

        stream-gauge measurements.” Resp’ts’ Br. at 28. Again, the Forest Service and the

        BLM attempt to place the burden on Petitioners to demonstrate the similarities between

        the areas outside and inside the forest, rather than recognizing MVP’s shortcomings.

        There is no reason to think (and the agencies have provided none) that the factors that

        could affect sedimentation in the four streams inside the forest that the Pipeline’s

                                                     21
USCA4 Appeal: 21-1039          Doc: 89      Filed: 01/25/2022   Pg: 22 of 29




        proposed route will cross will be any different inside the Jefferson National Forest than

        outside it, such that data from nearby locations outside the forest would not reflect the

        conditions within the forest.

                By creating a false dichotomy between the impacts of construction inside and

        outside the Jefferson National Forest, placing the burden on Petitioners to explain the

        similarities between these two areas, and failing to address the USGS modeling that

        occurred nearby in the Roanoke River, the Forest Service and the BLM “entirely failed to

        consider an important aspect of the problem.” Sierra Club, Inc. v. U.S. Forest Serv., 
897 F.3d 582, 590
 (4th Cir. 2018) (quoting Defs. of Wildlife v. N.C. Dep’t of Transp., 
762 F.3d 374, 396
 (4th Cir. 2014)). Therefore, we remand for the agencies to consider the

        USGS data and any other relevant information indicating that the modeling used in the

        EIS may not be consistent with data about the actual impacts of the Pipeline and its

        construction.

                                                    C.

                                         Conventional Bore Method

                Third, Petitioners argue that the Forest Service and the BLM violated NEPA by

        approving the use of the conventional bore method to cross the four streams within the

        Jefferson National Forest without first analyzing the method’s environmental effects.

        Here again, we agree with Petitioners. “It would be one thing if the Forest Service had

        adopted a new alternative that was actually within the range of previously considered

        alternatives . . . .   It is quite another thing to adopt a proposal that is configured



                                                    22
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 23 of 29




        differently . . . .” Dubois v. U.S. Dep’t of Agric., 
102 F.3d 1273
, 1292–93 (1st Cir. 1996).

        The Forest Service and the BLM have done the latter here.

               Although the supplemental EIS includes information about method, impact, safety,

        and environmental concerns related to conventional boring, the agencies’ assent to

        MVP’s use of conventional boring to construct the stream crossings is premature.

        Because MVP originally planned to use dry-ditch open cutting and wet cutting to

        construct the stream crossings, FERC’s initial EIS considered the environmental impact

        of these methods. It did not extensively consider the conventional bore method because

        no stream crossings were to be constructed using that method.

               Since then, MVP received authorization from FERC to modify how it would

        construct the stream crossings in the Jefferson National Forest. Specifically, FERC

        conducted a cursory review of MVP’s request to switch to the conventional bore method

        and, after “informally consult[ing]” with the Fish and Wildlife Service, concluded that

        the change “is feasible and . . . will reduce [environmental] impacts on aquatic

        resources.” J.A. 1200. However, FERC did not authorize MVP to construct any of the

        stream crossings using the conventional bore method because at the time, the Forest

        Service and the BLM had not yet approved the Pipeline’s crossing through the Jefferson

        National Forest.

               MVP has also requested to use the conventional bore method to construct other

        stream crossings outside the Jefferson National Forest. In response, FERC issued a

        notice indicating that it “will prepare an environmental document[] that will discuss the

        environmental impacts of” the requested change in the construction method for the

                                                    23
USCA4 Appeal: 21-1039       Doc: 89          Filed: 01/25/2022   Pg: 24 of 29




        stream crossings.    Mountain Valley Pipeline, LLC; Notice of Scoping Period and

        Requesting Comments on Environmental Issues for the Proposed Amendment to the

        Certificate of Public Convenience and Necessity for the Mountain Valley Pipeline

        Project, 
86 Fed. Reg. 15,215
, 15,215 (Mar. 22, 2021).

              FERC characterizes MVP’s request to switch to the conventional bore method as a

        request to amend the FERC Certificate for the Pipeline. 
Id.
 Without a FERC Certificate

        authorizing it to do so, MVP cannot “engage in the transportation or sale of natural gas

        . . . or undertake the construction or extension of any facilities therefor, or acquire or

        operate any such facilities or extensions thereof.” 15 U.S.C. § 717f(c)(1)(A). Therefore,

        it follows that MVP cannot construct the stream crossings outside the Jefferson National

        Forest using the conventional bore method until FERC actually fully approves the

        amendment to the FERC Certificate to authorize that method.

              In this regard, although FERC has given notice that it will issue a document

        assessing the environmental impacts of the change in the stream crossing construction

        method, it has not yet done so.   Despite FERC’s approval of the use of the conventional

        bore method for the stream crossings inside the Jefferson National Forest, the Forest

        Service and the BLM, in deciding whether to approve the Pipeline’s route over those

        lands, would surely benefit from FERC’s environmental analysis of the use of the

        conventional bore method for other stream crossings outside the Jefferson National

        Forest. As a result, the Forest Service and the BLM improperly approved the use of the

        conventional bore method for the four streams in the Jefferson National Forest without

        first considering FERC’s analysis.

                                                     24
USCA4 Appeal: 21-1039       Doc: 89            Filed: 01/25/2022    Pg: 25 of 29




                                                       D.

                                               Alternative Routes

               Petitioners also argue that the Forest Service and the BLM insufficiently evaluated

        alternative routes for the Pipeline that do not pass through national forests, in violation of

        the MLA. We reject this argument for essentially the same reason we rejected it in the

        prior iteration of this case. See Sierra Club, 897 F.3d at 599–600. The supplemental EIS

        amply demonstrates that the agencies did, in fact, consider alternative routes but

        concluded that the environmental impacts would simply be shifted to other lands and the

        increased length of the Pipeline’s route would affect more acreage, incorporate additional

        privately owned parcels, and increase the number of residences in close proximity to the

        Pipeline. Therefore, the record reveals that the BLM and the Forest Service complied

        with their obligations to assess alternative routes.

                                                       E.

                                  Increased Collocation of Rights of Way

               Relatedly, Petitioners assert that the BLM violated the MLA because it did not

        demonstrate that route alternatives that would increase collocation within the Jefferson

        National Forest were impractical. This argument likewise fails.

               Pipeline routes crossing national forest lands must indeed be collocated with

        existing rights of way “to the extent practical.” 
30 U.S.C. § 185
(p). But the BLM’s

        interpretation of this standard is reasonable, and its framework for evaluating whether

        collocation is “practical” is sound.



                                                       25
USCA4 Appeal: 21-1039        Doc: 89       Filed: 01/25/2022      Pg: 26 of 29




               Because neither the MLA nor its accompanying regulations define the meaning of

        “practical” as it is used in this provision, the BLM has interpreted it to mean “the

        suitability of a route alternative for achieving [the project’s] purpose” -- here,

        “construct[ing] a pipeline to deliver natural gas from the [Pipeline’s] beginning point to

        its endpoint, via its mid-route delivery points, in a safe, environmentally responsible, and

        cost-effective manner.” J.A. 806. The BLM justified this interpretation by considering

        the term’s common usage and legal definition, the MLA’s implementing regulations, 7 the

        only decision applying the term, 8 and interpretations of the term “practicable” in other

        environmental regulations. 9 The BLM also enumerated and explained six factors for



               7
                 Specifically, the supplemental EIS reasons, “The BLM’s regulations note that
        one of the objectives of the BLM’s pipeline [right of way] program is to ‘[p]romote[] the
        use of rights-of-way in common considering engineering and technological
        compatibility,’ and that the use of [rights of way] in common may be required ‘where
        safety and other considerations allow.’” J.A. 805 (quoting 
43 C.F.R. §§ 2881.2
(c),
        2882.10(b)).
               8
                   Wyo. Indep. Producers Ass’n, 133 IBLA 65, 82 (1995).
               9
                  Citing 
40 C.F.R. §§ 230.3
(l) and 230.10(a), the supplemental EIS states, “[A]
        regulation issued to implement section 404 of the Clean Water Act prohibits the issuance
        of a . . . permit ‘if there is a practicable alternative to the proposed discharge’ that is
        environmentally preferable, and defines ‘practicable’ as including ‘consideration [of]
        cost, existing technology, and logistics in light of overall project purposes.’” J.A. 806.
        The supplemental EIS continues, “In reviewing decisions made under this regulation by
        the U.S. Army Corps of Engineers . . . courts have deferred to the agency’s practicability
        determinations, and upheld its consideration of factors including cost, construction
        delays, logistical feasibility, and ‘the objectives of the applicant’s project.’” 
Id.
 (citing
        Friends of Santa Clara River v. U.S Army Corps of Eng’rs, 
887 F.3d 906, 912
, 921–22
        (9th Cir. 2018); Friends of the Earth v. Hintz, 
800 F.2d 822
, 833–34 (9th Cir. 1986);
        Nat’l Parks Conservation Ass’n v. Semonite, 
311 F. Supp. 3d 350
, 377–78 (D.D.C. 2018),
        rev’d, 
916 F.3d 1075
 (D.C. Cir. 2019)).


                                                     26
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022      Pg: 27 of 29




        assessing “practicality”: 1) “construction challenges and potential safety hazards”; 2)

        “environmental consequences”; 3) “increase[s] in the pipeline’s length and footprint”; 4)

        “the ability . . . to serve MVP’s mid-route delivery points”; 5) “additional costs”; and 6)

        “the likelihood that the route would achieve any specific purpose.” 
Id.
 at 806–07.

               At its core, Petitioners’ assertion that the BLM failed to apply the test it developed

        to the Pipeline boils down to no more than their disagreement with the outcome of the

        BLM’s analysis. But, for the reasons outlined, we conclude the BLM did not err when

        assessing the Pipeline route’s collocation with existing rights of way in the Jefferson

        National Forest.

                                                     F.

                                            2012 Planning Rule

               Finally, Petitioners argue that the Forest Service again failed to apply its 2012

        Planning Rule’s directly related substantive requirements within the scope and scale of

        the amendments to the Jefferson Forest Plan to accommodate the Pipeline, as the 2016

        Revised Rule requires. Petitioners assert that the amendments do not actually comply

        with any of the corresponding substantive requirements set forth in the 2012 Planning

        Rule and that the Forest Service applied an incorrect legal standard when it determined

        that the amendments did comply with the substantive requirements. We agree.

               We previously concluded that the 2012 Planning Rule’s soil and riparian resources

        requirements apply to the proposed amendments for the Pipeline. Sierra Club, 
897 F.3d at 603
. In its renewed ROD, the Forest Service acknowledges that the amendments are

        “directly related” to these requirements, but it maintains that it has complied with the

                                                     27
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 28 of 29




        requirements because it “applied [them] to provide protection to resources without

        substantial lessening of protections for these resources.” J.A. 582.

               This conclusion is not sound. First, the 2012 Planning Rule does not demand that

        the amendments protect forest resources without substantial lessening of protections.

        Rather, a forest plan “must include . . . components . . . to maintain or restore the

        ecological integrity of terrestrial and aquatic ecosystems and watersheds in the plan

        area.” 
36 C.F.R. § 219.8
(a)(1) (emphasis supplied). Because the Forest Service did not

        sufficiently consider the Pipeline’s actual sediment and erosion impacts, as we have

        already explained, the amendments to the Jefferson Forest Plan may not “maintain” soil

        and riparian resources within the scope of the 2012 Planning Rule. And because the

        Forest Service does not have a clear indication from FERC about the environmental

        impacts of the use of the conventional bore method to cross the four streams within the

        Jefferson National Forest, it is unclear whether the amendments to the Jefferson Forest

        Plan for the Pipeline will even “maintain” the forest’s resources, as the 2012 Planning

        Rule intended.

               Further, the Forest Service cannot rely on the notion that because the Pipeline will

        affect only a minimal fraction of the entire Jefferson National Forest, application of the

        existing forest plan (i.e., without Pipeline-related amendments) outside this area will

        continue to provide adequate protections. “If the Forest Service could circumvent the

        requirements of the 2012 Planning Rule simply by passing project-specific amendments

        on an ad hoc basis . . . the substantive requirements in the 2012 Planning Rule . . . would

        be meaningless.” Cowpasture River Pres. Ass’n v. Forest Serv., 
911 F.3d 150, 164
 (4th

                                                    28
USCA4 Appeal: 21-1039      Doc: 89         Filed: 01/25/2022     Pg: 29 of 29




        Cir. 2018), rev’d and remanded on other grounds, 
140 S. Ct. 1837
 (2020). In any event,

        the Forest Service has not provided an analysis of whether application of the existing

        Jefferson Forest Plan is adequately protecting these resources elsewhere in the Jefferson

        National Forest.

               As a result, we are compelled to once again remand so that the Forest Service can

        properly apply the 2012 Planning Rule’s soil and riparian resources requirements to the

        Pipeline amendments.

                                                    IV.

                                               Conclusion

               In sum, we conclude that the Forest Service and the BLM 1) inadequately

        considered the actual sedimentation and erosion impacts of the Pipeline; 2) prematurely

        authorized the use of the conventional bore method to construct stream crossings; and 3)

        failed to comply with the Forest Service’s 2012 Planning Rule. Therefore, we grant the

        petitions for review as to those errors; deny the petitions with regard to Petitioners’

        remaining arguments about the predecisional review process, alternative routes, and

        increased collocation; vacate the decisions of the Forest Service and the BLM; and

        remand this matter to the agencies for further proceedings consistent with this opinion.

                        PETITIONS FOR REVIEW GRANTED IN PART AND DENIED IN PART,
                                                         VACATED AND REMANDED




                                                    29