Opinion · Supreme Court of the United States

Dolan v. City of Tigard

Dolan v. City of Tigard, 512 U.S. 374 (1994)

Type
Opinion
Court
Supreme Court of the United States
Jurisdiction
Federal
Date
1994-06-24
Topic
general

How later courts describe this case

  • holding that compelled dedication of an easement for public use would constitute a taking
  • holding that absence of nexus between permit condition and legitimate state interest converts valid land regulation into an “out-and-out plan of extortion”
  • holding that burdens of municipal exactions required in exchange for building permits must achieve a "rough proportionality" with benefits received by the landowner to avoid municipal liability for a taking
  • holding that city must make some effort to quantify its findings in support of dedication beyond the conelusory statement that dedication “could” offset some of the traffic demand generated
  • holding that the “right to exclude others is ‘one of the most essential sticks in the bundle of rights that are commonly characterized as property.’”
  • holding that essential nexus requires rough proportionality between the exaction and the legitimate state interest
  • holding that a condition that the property owner dedicate ten percent of her property as a pedestrian/bicycle path in order to obtain requested building permits constituted a taking
  • concluding that the public recreational path was not proportional to the store expansion even though the proposed development might “generate roughly 435 additional [vehicle and bicycle] trips per day.”

Citator

UpLaw has not yet analyzed Dolan v. City of Tigard. The absence of a flag is not a finding that it is good law.

Authority status
pending
Cited by
1013 opinions

Headnotes

  1. Constitutional Law — Takings Under the doctrine of unconstitutional conditions, the government may not require a person to give up a constitutional right — including the right to receive just compensation when property is taken for a public use — in exchange for a discretionary benefit conferred by the government where the property sought has little or no relationship to the benefit. 512 U.S. at 385
  2. Constitutional Law — Takings In evaluating a challenge to a land use permit condition that requires dedication of property, a court must first determine whether an essential nexus exists between a legitimate state interest and the permit condition. 512 U.S. at 386
  3. Constitutional Law — Takings If an essential nexus exists between a legitimate state interest and a permit condition, the court must then decide whether the degree of the exactions demanded by the permit condition bears the required relationship to the projected impact of the proposed development. 512 U.S. at 386
  4. Constitutional Law — Takings The required connection between a land use exaction and the projected impact of the proposed development is one of rough proportionality; no precise mathematical calculation is required, but the city must make some individualized determination that the required dedication is related both in nature and extent to the impact of the proposed development. 512 U.S. at 391
  5. Constitutional Law — Takings Where a city makes an adjudicative decision to condition a building permit application on an individual parcel, the burden of justifying the required dedication rests on the city, rather than on the party challenging the condition. 512 U.S. at 391 n.8
  6. Constitutional Law — Takings A requirement that a landowner dedicate a public recreational easement over floodplain property is not shown to be reasonably related to the legitimate interest in flood control where the city has made no individualized determination explaining why a public greenway, as opposed to a private one, is required, and the difference to the landowner is the loss of the right to exclude others. 512 U.S. at 392-394
  7. Constitutional Law — Takings A city fails to carry its burden of demonstrating that a pedestrian/bicycle pathway dedication is reasonably related to the traffic impact of a proposed development where its finding is merely the conclusory statement that the pathway could offset some of the traffic demand; the city must make some effort to quantify its findings beyond such a statement. 512 U.S. at 395-396