MoNtgomeet, J.: Upon entering the city of Wilmington, the plaintiff company, before it could lay its track across Fourth street, at a point then within the city limits, was compelled to cut through a considerable embankment, thereby necessitating the building of a bridge over the cut in order that travel and transportation should not be obstructed or delayed over the street. The territory within the city limits and contiguous to the bridge has never been built up, nor have streets been actually laid cff there. The highway which, at the bridge, i? called Fourth street, was the old public road leading out from the city before the city limits were extended. The bridge, when it was built, was, and is now, sufficient for the ordinary purposes of travel by foot and horse and vehicle transportation. The defendant railway company has commenced to run street cars over the bridge, and has determined to run them in sections of from two to four cars at a time.
Citator
UpLaw has not yet analyzed Carolina Central Railroad v. Wilmington Street Railway Co.. The absence of a flag is not a finding that it is good law.
- Cited by
- 5 opinions
Upon entering the city of Wilmington, the plaintiff company, before it could lay its track across Fourth street, at a point then within the city limits, was compelled to cut through a considerable embankment, thereby necessitating the building of a bridge over the cut in order that travel and transportation should not be obstructed or delayed over the street. The territory within the city limits and contiguous to the bridge has never been built up, nor have streets been actually laid cff there. The highway which, at the bridge, i? called Fourth street, was the old public road leading out from the city before the city limits were extended. The bridge, when it was built, was, and is now, sufficient for the ordinary purposes of travel by foot and horse and vehicle transportation. The defendant railway company has commenced to run street cars over the bridge, and has determined to run them in sections of from two to four cars at a time. The defendant company refuses to unite with the plaintiff in the maintenance of the bridge in order to mpet, as the plaintiff con-' tended, the larger servitudes imposed upon it by the-defendant company’s cars, and to provide the necessary conveniences at the intersection as required of them by Subsection 6, Section 1957 of The Code. The plaintiff alleges further in the complaint, “that if the said defendant, Street Railway Company, is allowed to operate its cars ovér the said bridge, there is great danger -of the same giving
A demurrer was filed and the ground assigned is that the complaint shows that the plaintiff company laid its track, dug the cut and built the bridge across Fourth street after the limits of the city had been extended beyond the bridge, and that neither the proposed action of the defendant company nor its action in the past imposes, or will impose, any additional servitude upon the bridge or upon the street of which said bridge forms apart, and that, therefore, no cause of action is set out in the complaint of the plaintiff. The demurrer was sustained.
The demurrer raises the question whether or not the running of street cars by an incorporated street railway company over a bridge already constructed by a railroad company within the city limits and sufficient for the ordinary uses of the public, imposes an additional servitude upon the bridge. It would seem that the principle of law underlying the question, stripped of unnecessary verbiage, is a simple one. In the solution of the matter it is only necessary to consider .two propositions; first, the nature of the liability to the public, imposed upon the plaintiff company at the time of the construction of the bridge; and, second, what continuing liability, if any, was and is imposed upon the plaintiff as to the maintenance of the bridge.
■ The law undoubtedly imposed upon the plaintiff company, at the time the bridge was built, the obligation to put up
We are of the opinion that the plaintiff stated a good cause of action in its complaint, and that there was error in the ruling of the court.
Error.