Opinion · Supreme Court of the United States
Federal Power Commission v. Amerada Petroleum Corp.
Fed. Power Comm’n v. Amerada Petroleum Corp., 379 U.S. 687 (1965)
- Type
- Opinion
- Court
- Supreme Court of the United States
- Jurisdiction
- Federal
- Date
- 1965-02-01
- Topic
- general
Per Curiam Montana-Dakota (MDU) is an interstate natural gas pipeline company, selling and transporting gas in Montana, North Dakota, South Dakota, and Wyoming. The lines involved here run to the east and west from the Tioga processing plant in North Dakota, jointly owned by. Amerada and Signal, producers of natural gas in North Dakota. Also, running north from the Tioga point is *688a line extending to the gasoline extraction plants of Hunt-Herbert and TXL (now Texaco), both in North Dakota. On a peak winter day in 1962-1963 MDU was expected to purchase a total of 70,000 Mcf of North Dakota-produced gas from these four producers: 55,000 Mcf from Amerada-Signal, 10,000 Mcf from TXL, and 5,000 Mcf from Hunt-Herbert.
Citator
UpLaw has not yet analyzed Federal Power Commission v. Amerada Petroleum Corp.. The absence of a flag is not a finding that it is good law.
- Cited by
- 20 opinions
Montana-Dakota (MDU) is an interstate natural gas pipeline company, selling and transporting gas in Montana, North Dakota, South Dakota, and Wyoming. The lines involved here run to the east and west from the Tioga processing plant in North Dakota, jointly owned by. Amerada and Signal, producers of natural gas in North Dakota. Also, running north from the Tioga point is
On a peak winter day in 1962-1963 MDU was expected to purchase a total of 70,000 Mcf of North Dakota-produced gas from these four producers: 55,000 Mcf from Amerada-Signal, 10,000 Mcf from TXL, and 5,000 Mcf from Hunt-Herbert. Of the 55,000 Mcf from Amerada-Signal, 50,000 Mcf would flow to the east and be consumed in North Dakota. All of the Hunt-Herbert and TXL gas, plus the remaining 5,000 Mcf of the Amerada; Signal gas, would flow to the west — a total of 20,000 Mcf. Of this westward-flowing gas, 10,200 Mcf would be consumed in North Dakota; the remaining 9,800 Mcf would flow across the state boundary into Montana for consumption outside of North Dakota.
On an average summer day MDU would take about 45,000 Mcf from Amerada-Signal, while continuing to take about 15,000 Mcf from Hunt-Herbert and TXL. Of the Amerada-Signal gas, 13,000 Mcf would flow westward, commingled with the 15,000 Mcf from Hunt-Herbert and TXL. Only 1,680 Mcf of this stream would be consumed in North Dakota; the remaining 26,320 Mcf would flow into Montana to be held in storage for ultimate redelivery to all parts of MDU’s interstate system. 32,000 Mcf of gas would flow eastward, all from .Amerada-Signal. In contrast to the situation on a peak winter day, only 7,280 Mcf of this eastward-flowing gas would be consumed in North Dakota, while 24,720 Mcf would cross the state boundary and go into storage.
The contracts for the purchase of gas from Hunt-Herbert .and TXL admittedly constitute sales of gas for resale within the meaning of § 1 (b) of the Natural Gas Act, 15 U. S. C. § 717. These sellers applied for and were granted certificates of public convenience and necessity by the Commission. 27 F. P. C. 1092.
Respondents Amerada and Signal contended before the Federal Power Commission that sales to MDU under the “North Dakota Contracts” would be “nonjurisdictional” since they were not sales in interstate commerce for resale. Relying on its decision in Lo-Vaca Gathering Co., 26 F. P. C. 606 (reversed, 323 F. 2d 190, reversed, ante, p. 366), the Commission rejected the contention and asserted its jurisdiction over the sales. 30 F. P. C. 200. The Court of Appeals reversed. 334 F. 2d 404. The Commission has petitioned for writ of certiorari.
All of the gas purchased by MDU from Amerada-Signal under both sets of contracts is delivered into the pipeline at the-Tioga plant. According to the testimony of MDU’s engineer, on a peak winter day the pipeline would elect to purchase all of the Amerada-Signal. gas under the “North Dakota Contracts.” Yet, as previously shown, on such a day some of the Amerada-Signal gas flows westward, in a commingled stream with gas from
Factually, therefore, the present case is on all fours with California v. Lo-Vaca Gathering Co., ante, p. 366.
The Court of Appeals thought that its decision in North Dakota v. Federal Power Comm’n, 247 F. 2d 173, brought collateral estoppel into play in the present case. 334 F. 2d 404, 411-412. But that rule has no place here for no judgment governing past events is in jeopardy, only the scope of future regulation that involves different events and transactions. See Commissioner v. Sunnen, 333 U. S. 591, 601-602.
Accordingly, the writ of certiorari is granted, and the judgment of the Court of Appeals is reversed.
It is so ordered.