Ibach, J. On December 4, 1908, appellees entered into a contract with one Franklin in which he was to furnish all the materials and perform all the labor for the electric wire system in a building being erected by them, for the stipulated sum of $1,976. To insure the faithful performance of his contract, he, together with the Illinois Surety Company, gave his bond to appellees to indemnify them against loss in the event of a breach of such contract. The contractor Franklin failed fully to perform his contract, and appellees completed the part left undone by him. This action was then brought to recover damages for the contractor’s default and for $300 liquidated damages provided for in the building contract.
Citator
UpLaw has not yet analyzed Illinois Surety Co. v. Huber. The absence of a flag is not a finding that it is good law.
- Cited by
- 8 opinions
On December 4, 1908, appellees entered into a contract with one Franklin in which he was to furnish all the materials and perform all the labor for the electric wire system in a building being erected by them, for the stipulated sum of $1,976. To insure the faithful performance of his contract, he, together with the Illinois Surety Company, gave his bond to appellees to indemnify them against loss in the event of a breach of such contract. The contractor Franklin failed fully to perform his contract, and appellees completed the part left undone by him. This action was then brought to recover damages for the contractor’s default and for $300 liquidated damages provided for in the building contract. Defendant Franklin was defaulted. The cause was tried by the court and resulted in a judgment for appellees for $391.64. Appellant Illinois Surety Company alone appeals, and contends that the cause should be reversed because the trial court erred in overruling 'its separate demurrers to the complaint and in overruling its separate motion for a new trial.
1.
4. The only ground of the motion for new trial which is argued is that the judgment is not sustained by sufficient evidence, and is contrary to law. "What has been said concerning the sufficiency of the complaint will also apply to the sufficiency of the evidence. Without discussing the evidence at length, it is enough to say that there is evidence showing that the contract provided that the work to be done by the contractor Franklin was to be completed January 20, 1909, and for each day of. default thereafter appellees were to recover as liquidated damages the sum of $20. The evidence discloses that both the architect and members of the building committee were about the building on the day the work was to be completed, but Franklin was not there, and the work he was to do had not been finished. This is some evidence that the contract- or’s default was known to the owner on that date. Therefore it must be held that on January 20, 1909, appellees had notice that the contractor had defaulted to such an extent that such default might involve a claim or loss to appellant surety, and yet no notice was served upon it until seven days later. This failure was a breach of the covenants contained in the agreement between the parties and the failure to serve the required notice within twenty-four hours after the default of the contractor became known to appellees would prevent a recovery if the default was of such char
5. The requirement of such a notice as is provided for here is for the protection and benefit of the surety and as we have said, it had the right to insist that the covenant in the bond with respect to notice be strictly carried out, where failure to do so might result in a loss to it. The supreme court of Washington in considering a similar question used this language, “yet when the notice serves its purpose as well when given after the prescribed time as it does before — that is, when it is equally as effective in protecting the surety from loss — it is inequitable, and a manifest abuse of the purposes of this provision of the bond, to hold that the mere technical variance shall relieve the obligor entirely; the surety, being a compensated surety, can insist only on those forfeiture clauses of its contract the falure to comply with which probably inflicts upon it.a loss.” Hefferman v. United States Fidelity, etc., Co. (1905), 37 Wash. 477, 481.
4. 6. There is no claim here for liquidated damages on account of the delay occasioned by the contractor subsequent to January 20, 1909, so that a failure by appellees to give the required notice until January 27, could not in any manner affect appellant with reference to the contractor’s default prior to January 20, and of which it does not appear that appellee had notice until that date. And it fully appears that nothing beyond the actual cost of the completion of the work left undone by the contractor, was charged against appellant, so that it seems from all the facts in the ease that the service of the notice on January 27, rather than January 20, accomplished the same purpose and no additional burden was added to appellant by reason of the delay in serving the default notice. The damages are not excessive.. The amount allowed was fully warranted by the evidence. An opportunity was offered appellant surety company to complete the con
Note. Reported in 107 N. E. 298. As to creditor’s duty to a surety, see 115 Am. St. 85. See, also, under (1) 32 Oyc. 127; (2) 31 Cyc. 560; (3, 5) 32 Oyc. 176; (4) 32 Cyc. 176, 138.